期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Construction of Rail Connectivity from Idapalli to International Container Transhipment Terminal(ICTT)at Vallarpadam,Kochi
1
作者 prakash bansod 《Journal of Civil Engineering and Architecture》 2024年第1期12-16,共5页
Cochin Port is an all-weather port situated within a protected natural harbour,just 11 km away from mainland shipping route.Total draft of 15m-16m is available and it is a natural choice for setting up transhipment hu... Cochin Port is an all-weather port situated within a protected natural harbour,just 11 km away from mainland shipping route.Total draft of 15m-16m is available and it is a natural choice for setting up transhipment hub.The International Container Transhipment Terminal(ICTT)at Vallarpadam was developed by DP World and M/s Cochin Port Trust(CPT).As a part of this project,the new Rail connectivity from ICTT at Vallarpadam to Idappalli station is 8.60km,including the construction of 4.62 km elevated bridge was awarded to AFCONS by M/s Rail Vikas Nigam Limited(RVNL),in 2007 with a scheduled completion by 2009.This bridge is constructed for single railway track and piling was done for the provision of a second railway track in future.The 4.62 km long bridge was successfully completed and Trial Loco run was done in March 2010.This paper includes details of sub-surface profile,engineering properties of soils,details of construction of pile foundations and Challenges faced during construction. 展开更多
关键词 Transhipment transportation hub RAILWAY CONSTRUCTION
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部