A12.24km long tunnel between Maroshi and Ruparel College is being excavated by tunnel boring machine(TBM)to improve the water supply system of Greater Mumbai,India.In this paper,attempt has been made to establish the ...A12.24km long tunnel between Maroshi and Ruparel College is being excavated by tunnel boring machine(TBM)to improve the water supply system of Greater Mumbai,India.In this paper,attempt has been made to establish the relationship between various litho-units of Deccan traps,stability of tunnel and TBM performances during the construction of5.83km long tunnel between Maroshi and Vakola.The Maroshi–Vakola tunnel passes under the Mumbai Airport and crosses both runways with an overburden cover of around70m.The tunneling work was carried out without disturbance to the ground.The rock types encountered during excavation arefine compacted basalt,porphyritic basalt,amygdaloidal basalt pyroclastic rocks with layers of red boles and intertrappean beds consisting of various types of shales Relations between rock mass properties,physico-mechanical properties,TBM specifications and the cor responding TBM performance were established.A number of support systems installed in the tunne during excavation were also discussed.The aim of this paper is to establish,with appropriate accuracy the nature of subsurface rock mass condition and to study how it will react to or behave during under ground excavation by TBM.The experiences gained from this project will increase the ability to cope with unexpected ground conditions during tunneling using TBM.展开更多
For better rock mass characterization and support design, 3D engineering geological mapping was carried for the heading portion of the under construction 200.00 m long, 68.75 m high and 20.20 m wide underground additi...For better rock mass characterization and support design, 3D engineering geological mapping was carried for the heading portion of the under construction 200.00 m long, 68.75 m high and 20.20 m wide underground additional surge pool cavern of a Pranahitha-Chevella Sujala Sravanthi lift irrigation scheme package 8, India. To study cavern behavior, 3D geologic mapping of heading portion is very important for large cavern for predicting geologic conditions in benching down up to invert level, planning support system, selecting inclination for best location of supplemental rock bolt and choosing strategic locations for various types of instrumentation. The assessment of Tunnel Quality Index “Q” and Geomechanics classification for the granitic rock mass was done based on the information available of the rock joints and their nature and 3D geological logging. Hoek-Brown parameters were also determined by the statistical analysis of the results of a set of triaxial tests on core samples. On basis of geological characteristics and NMT Q-system chart, support system is recommended which includes rock bolt, steel fibre reinforced shotcrete and grouting. To evaluate the efficacy of the proposed support system, the capacity of support system is determined.展开更多
基金a part of the project "Universities Natural Science Research Project in Anhui Province" (KJ2011Z375)supported by Department of Education of Anhui Province
文摘A12.24km long tunnel between Maroshi and Ruparel College is being excavated by tunnel boring machine(TBM)to improve the water supply system of Greater Mumbai,India.In this paper,attempt has been made to establish the relationship between various litho-units of Deccan traps,stability of tunnel and TBM performances during the construction of5.83km long tunnel between Maroshi and Vakola.The Maroshi–Vakola tunnel passes under the Mumbai Airport and crosses both runways with an overburden cover of around70m.The tunneling work was carried out without disturbance to the ground.The rock types encountered during excavation arefine compacted basalt,porphyritic basalt,amygdaloidal basalt pyroclastic rocks with layers of red boles and intertrappean beds consisting of various types of shales Relations between rock mass properties,physico-mechanical properties,TBM specifications and the cor responding TBM performance were established.A number of support systems installed in the tunne during excavation were also discussed.The aim of this paper is to establish,with appropriate accuracy the nature of subsurface rock mass condition and to study how it will react to or behave during under ground excavation by TBM.The experiences gained from this project will increase the ability to cope with unexpected ground conditions during tunneling using TBM.
文摘For better rock mass characterization and support design, 3D engineering geological mapping was carried for the heading portion of the under construction 200.00 m long, 68.75 m high and 20.20 m wide underground additional surge pool cavern of a Pranahitha-Chevella Sujala Sravanthi lift irrigation scheme package 8, India. To study cavern behavior, 3D geologic mapping of heading portion is very important for large cavern for predicting geologic conditions in benching down up to invert level, planning support system, selecting inclination for best location of supplemental rock bolt and choosing strategic locations for various types of instrumentation. The assessment of Tunnel Quality Index “Q” and Geomechanics classification for the granitic rock mass was done based on the information available of the rock joints and their nature and 3D geological logging. Hoek-Brown parameters were also determined by the statistical analysis of the results of a set of triaxial tests on core samples. On basis of geological characteristics and NMT Q-system chart, support system is recommended which includes rock bolt, steel fibre reinforced shotcrete and grouting. To evaluate the efficacy of the proposed support system, the capacity of support system is determined.