The reasonable determination of ecological flow is of great significance for the efforts to promote the transformation of water ecological environmental protection from pollution management to synergistic management o...The reasonable determination of ecological flow is of great significance for the efforts to promote the transformation of water ecological environmental protection from pollution management to synergistic management of water resources,water ecology and water environment,and to promote them in an integrated manner.This paper analyzed and calculated the ecological flow process of the Bangsha River diversion power station using the minimum ecological flow method,the annual spreading method,the improved annual spreading method,the NGPRP method,and the month-by-month frequency method,and evaluated the reasonableness of the process and results of the ecological flow calculations by using the fuzzy evaluation model established.The study showed that the minimum ecological flow rate determined by improving the coupling of the spreading method and the NGPRP method was the best,and the suitable ecological flow rate determined by the month-by-month frequency method was the best;the minimum ecological flow rate of the Bangsha River diversion power station was at 0.43-4.21 m 3/s,and the suitable ecological flow rate was at 0.56-4.94 m 3/s,and the trend of its change showed the trend of first increasing and then decreasing,and the trend of change from January to July showed the trend of first increasing and then decreasing.Its trend of change showed an increasing and then decreasing trend,from January to July showed a gradually increasing trend,from August to December showed a gradually decreasing trend.It aimed to provide a theoretical basis for the reasonable determination of the ecological flow of the river hydropower station.展开更多
Assessment of ecological flow or water level for water bodies is important for the protection of de- graded or degrading ecosystems caused by water shortage in arid regions, and it has become a key issue in water reso...Assessment of ecological flow or water level for water bodies is important for the protection of de- graded or degrading ecosystems caused by water shortage in arid regions, and it has become a key issue in water resources planning. In the past several decades, many methods have been proposed to assess ecological flow for rivers and ecological water level for lakes or wetlands. To balance water uses by human and ecosystems, we proposed a general multi-objective programming model to determine minimum ecological flow or water level for inland water bodies, where two objectives are water index for human and habitat index for ecosystems, respectively Using the weighted sum method for multi-objective optimization, minimum ecological flow or water level can be determined from the breakpoint in the water index-habitat index curve, which is similar to the slope method to de- termine minimum ecological flow from wetted perimeter-discharge curve. However, the general multi-objective programming model is superior to the slope method in its physical meaning and calculation method. This model provides a general analysis method for ecological water uses of different inland water bodies, and can be used to define minimum ecological flow or water level by choosing appropriate water and habitat indices. Several com- monly used flow or water level assessment methods were found to be special cases of the general model, including the wetted perimeter method and the multi-objective physical habitat simulation method for ecological river flow, the inundated forest width method for regeneration flow of floodplain forest and the lake surface area method for eco- logical lake level. These methods were applied to determine minimum ecological flow or water level for two repre- sentative rivers and a lake in northern Xinjiang of China, including minimum ecological flow for the Ertix River, minimum regeneration flow for floodplain forest along the midstream of Kaxgar River, and minimum ecological lake level for the Ebinur Lake. The results illustrated the versatility of the general model, and can provide references for water resources planning and ecosystem protection for these rivers and lake.展开更多
The minimum cost of capacity expansion for time-limited transportation problem on-demand (MCCETLTPD) is to find such a practicable capacity expansion transportation scheme satisfying the time-limited T along with all ...The minimum cost of capacity expansion for time-limited transportation problem on-demand (MCCETLTPD) is to find such a practicable capacity expansion transportation scheme satisfying the time-limited T along with all origins’ supply and all destinations’ demands as well as the expanding cost is minimum. Actually, MCCETLTPD is a balance transportation problem and a variant problem of minimum cost maximum flow problem. In this paper, by creating a mathematical model and constructing a network with lower and upper arc capacities, MCCETLTPD is transformed into searching feasible flow in the constructed network, and consequently, an algorithm MCCETLTPD-A is developed as MCCETLTPD’s solution method basing minimum cost maximum flow algorithm. Computational study validates that the MCCETLTPD-A algorithm is an efficient approach to solving the MCCETLTPD.展开更多
文摘The reasonable determination of ecological flow is of great significance for the efforts to promote the transformation of water ecological environmental protection from pollution management to synergistic management of water resources,water ecology and water environment,and to promote them in an integrated manner.This paper analyzed and calculated the ecological flow process of the Bangsha River diversion power station using the minimum ecological flow method,the annual spreading method,the improved annual spreading method,the NGPRP method,and the month-by-month frequency method,and evaluated the reasonableness of the process and results of the ecological flow calculations by using the fuzzy evaluation model established.The study showed that the minimum ecological flow rate determined by improving the coupling of the spreading method and the NGPRP method was the best,and the suitable ecological flow rate determined by the month-by-month frequency method was the best;the minimum ecological flow rate of the Bangsha River diversion power station was at 0.43-4.21 m 3/s,and the suitable ecological flow rate was at 0.56-4.94 m 3/s,and the trend of its change showed the trend of first increasing and then decreasing,and the trend of change from January to July showed the trend of first increasing and then decreasing.Its trend of change showed an increasing and then decreasing trend,from January to July showed a gradually increasing trend,from August to December showed a gradually decreasing trend.It aimed to provide a theoretical basis for the reasonable determination of the ecological flow of the river hydropower station.
基金supported by the Open Research Fund Program of State key Laboratory of Hydroscience and Engineering, Tsinghua University (sklhse-2013-A-03)the National Natural Science Foundation of China (50879041)
文摘Assessment of ecological flow or water level for water bodies is important for the protection of de- graded or degrading ecosystems caused by water shortage in arid regions, and it has become a key issue in water resources planning. In the past several decades, many methods have been proposed to assess ecological flow for rivers and ecological water level for lakes or wetlands. To balance water uses by human and ecosystems, we proposed a general multi-objective programming model to determine minimum ecological flow or water level for inland water bodies, where two objectives are water index for human and habitat index for ecosystems, respectively Using the weighted sum method for multi-objective optimization, minimum ecological flow or water level can be determined from the breakpoint in the water index-habitat index curve, which is similar to the slope method to de- termine minimum ecological flow from wetted perimeter-discharge curve. However, the general multi-objective programming model is superior to the slope method in its physical meaning and calculation method. This model provides a general analysis method for ecological water uses of different inland water bodies, and can be used to define minimum ecological flow or water level by choosing appropriate water and habitat indices. Several com- monly used flow or water level assessment methods were found to be special cases of the general model, including the wetted perimeter method and the multi-objective physical habitat simulation method for ecological river flow, the inundated forest width method for regeneration flow of floodplain forest and the lake surface area method for eco- logical lake level. These methods were applied to determine minimum ecological flow or water level for two repre- sentative rivers and a lake in northern Xinjiang of China, including minimum ecological flow for the Ertix River, minimum regeneration flow for floodplain forest along the midstream of Kaxgar River, and minimum ecological lake level for the Ebinur Lake. The results illustrated the versatility of the general model, and can provide references for water resources planning and ecosystem protection for these rivers and lake.
文摘The minimum cost of capacity expansion for time-limited transportation problem on-demand (MCCETLTPD) is to find such a practicable capacity expansion transportation scheme satisfying the time-limited T along with all origins’ supply and all destinations’ demands as well as the expanding cost is minimum. Actually, MCCETLTPD is a balance transportation problem and a variant problem of minimum cost maximum flow problem. In this paper, by creating a mathematical model and constructing a network with lower and upper arc capacities, MCCETLTPD is transformed into searching feasible flow in the constructed network, and consequently, an algorithm MCCETLTPD-A is developed as MCCETLTPD’s solution method basing minimum cost maximum flow algorithm. Computational study validates that the MCCETLTPD-A algorithm is an efficient approach to solving the MCCETLTPD.