In the Changqing Oilfield in northwest China, when traditional petroleum exploitation encounters forestry reserves or water source protection areas, sectorial well-factory design is proposed. The most distinct feature...In the Changqing Oilfield in northwest China, when traditional petroleum exploitation encounters forestry reserves or water source protection areas, sectorial well-factory design is proposed. The most distinct feature of a sectorial well-factory is the deviation of the well from the minimum horizontal principal stress, resulting in hydraulic fracture deflection after the initiation, along with possible well interference (i.e., fracture hit) and fracture coalescence in the oblique wells. Four indexes describing well deflection are then proposed according to fracture morphology. Several fracturing designs, including stage arrangement, fracturing sequences, and fracturing techniques are applied to study the feasibility of the sectorial well-factory design. The results show that the “gradual” or “sparse” stage arrangement, large injection rate, and simultaneous multifracture treatment can help to optimize the fracture morphology and stimulation design. However, the subsequent stress shadowing effect usually adversely affects the fracturing of adjacent wells. With a small initial horizontal stress difference, large injection rate and staggered stage arrangement can achieve ideal stimulation performance. Our results can provide a guidance for optimizing stimulation design in unconventional well-factory while taking into account environmental protection.展开更多
Pre-driven longwall retracement roadway(PLRR)is commonly used in large mine shaft.The support crushing disasters occur frequently during the retracement,and roof management is necessary.Taking the 31107 panel as resea...Pre-driven longwall retracement roadway(PLRR)is commonly used in large mine shaft.The support crushing disasters occur frequently during the retracement,and roof management is necessary.Taking the 31107 panel as research background,the roof breaking structure of PLRR is analyzed.It is concluded that the roof cutting with vertical hydraulic fracture(HF)at a specified position,that is,fixed-length roof cutting,can reduce support load and keep immediate roof intact.The extended finite element method(XFEM)is applied to simulate hydraulic fracturing.The results show that both the axial and transverse hydraulic fracturing cannot effectively create vertical HFs.Therefore,a novel construction method of vertical HF based on the stress shadow effect(SSE)is proposed.The stress reversal region and HF orientation caused by the prefabricated hydraulic fracture(PF)are verified in simulation.The sub-vertical HFs are obtained between two PFs,the vertical extension range of which is much larger than that of directional hydraulic fracturing.The new construction method was used to determine the field plan for fixed-length roof cutting.The roof formed a stable suspended structure and deformation of the main PLRR was improved after hydraulic fracturing.展开更多
Global Positioning System (GPS) and Interferometric Synthetic Aperture Radar (InSAR), used for monitoring crust deformation, are found to be very promising in earthquake prediction subject to stress-forecasting. H...Global Positioning System (GPS) and Interferometric Synthetic Aperture Radar (InSAR), used for monitoring crust deformation, are found to be very promising in earthquake prediction subject to stress-forecasting. However, it is recognized that unless we can give reasonable explanations of these curious precursory phenomena that continue to be serendipitously observed from time to time, such high technology of GPS or InSAR is difficult to be efficiently used. Therefore, a proper model revealing the relation between earthquake evolution and stress variation, such as the phenomena of stress buildup, stress shadow and stress transfer (SSS), is crucial to the GPS or InSAR based earthquake prediction. Here we address this question through a numerical approach of earthquake development using an intuitive physical model with a map-like configuration of discontinuous fault system. The simulation provides a physical basis for the principle of stress-forecasting of earthquakes based on SSS and for the application of GPS or InSAR in earthquake prediction. The observed SSS associated phenomena with images of stress distribution during the failure process can be continuously simulated. It is shown that the SSS are better indicators of earthquake precursors than that of seismic foreshocks, suggesting a predictability of earthquakes based on stress-forecasting strategy.展开更多
The Tongchang orefield is located in the central part of the Mianxian-Lueyang-Yangpingguan area that is celebrated as a 'gold triangle' area,at the juncture of the latitudinal tectonic zone of South Qinling,th...The Tongchang orefield is located in the central part of the Mianxian-Lueyang-Yangpingguan area that is celebrated as a 'gold triangle' area,at the juncture of the latitudinal tectonic zone of South Qinling,the Longmenshan Cathysian tectonic zone and the Sichuan-Yunnan longitudinal tectonic zone,where there are distributed Cu-Au polymetallic ore deposits(occurrences) including the Tongchang,Chenjiaba,Qinjiabian,Hongtushi,Yinshangou and Xiakouyi ore deposits(mineralization).Based on the "giant pressure shadow" structure put forward and demonstrated by numerical modeling of the tectonic stress field and the static photoelasticity experiments on the basis of tectonic ore-controlling laws in the orefield,tectonic metallogenesis driven by orefield tectonic stress has been discussed in terms of its geological setting,orefield geomechanics,and tectonic stress field.It is thought that the dynamic evolution model of the tectonic stress field controls the whole process of formation of the polymetallic ore deposits(mineralization) in the orefield,as well as the deformation field.As a result,it controls the emplacement of rockbodies and the transformation of ore-source bodies,and provides both the channel-ways for ore-forming fluids and ore-hosting space.Furthermore,it controls the migration potential field of fluids and,thereafter,its flow direction,rate and volume;the tectonic stress field also controls the energy field and hence controls the position of occurrence of ore deposits and their scale.The method of tectonic stress field has been applied to ore prognosis in the orefield.The rules of magmatic emplacement and metallogenic fluid migrating and concentrating under the control of the structural stress field were expounded,hence providing the theoretical basis for the prognosis of concealed ores.In addition,a number of important target areas have been defined.展开更多
采用PHF-LSM(permeability-based hydraulic fracture-level set method)水力压裂计算模型,建立了含节理分布的岩石材料模型,将其计算结果与裂缝几何特征和诱发应力理论解对比验证模型正确性,在此基础上分析节理对水力裂缝应力阴影效应...采用PHF-LSM(permeability-based hydraulic fracture-level set method)水力压裂计算模型,建立了含节理分布的岩石材料模型,将其计算结果与裂缝几何特征和诱发应力理论解对比验证模型正确性,在此基础上分析节理对水力裂缝应力阴影效应的影响.计算结果表明:基于弥散裂缝模型的PHF模型应使用等效开裂区域最外侧结点位移差作为裂缝等效开度;节理的存在会影响裂缝注水过程中水压力变化,同时会引起裂缝等效开度的增大;较大的节理入射角度与距注水点较小的节理高度会产生更大诱发应力,同时会引起最小主应力方向的改变,导致更强应力阴影效应,裂缝偏转加强.展开更多
Using a plexiglass sample and by means of real-time holographic interferometry and shadow optical method of caustics, the different features of dynamic variation in stress (strain) field, plastic area and nucleation z...Using a plexiglass sample and by means of real-time holographic interferometry and shadow optical method of caustics, the different features of dynamic variation in stress (strain) field, plastic area and nucleation zone (shadow area) when the sample fractures during loading (loading-fracture) and unloading (unloading-fracture) are studied visually. The results show that the strain nuclei (zones with dense fringes) appear first at the tips of prefabricated cracks at low stress, and then the shadow areas of caustics form with the increase of load. These nuclei and shadow areas can become larger, or smaller, when the process of loading, or unloading, goes on. When the stress is kept within a certain range, the shadow areas of caustics can become larger and smaller alternatively with repeated loading and unloading (cyclic loading). However, when loading and unloading at high stress, in particular when the macrofracture is about to appear, the variations of the shadow areas of caustics are irreversible and quite different. The shadow areas of caustics expand rapidly at an increasing speed when loading-fracture appears. In contrast, the shadow areas of caustics expand at a lower speed when unloading-fracture appears; besides, there is a circular shadow in front of the sharp-angle shaped area.展开更多
采用PHF-LSM(permeability-based hydraulic fracture-level set method)水力压裂数值计算模型,模拟并分析了均质与分层岩石材料中分段压裂过程引起的应力阴影效应.通过与单一裂缝诱发应力理论解的对比,验证了PHF-LSM考虑应力阴影效应...采用PHF-LSM(permeability-based hydraulic fracture-level set method)水力压裂数值计算模型,模拟并分析了均质与分层岩石材料中分段压裂过程引起的应力阴影效应.通过与单一裂缝诱发应力理论解的对比,验证了PHF-LSM考虑应力阴影效应的可行性.以此模型为基础分析了单一裂缝发展过程中,岩石材料参数与初始应力条件对诱发应力场的影响,以及均质与分层岩石材料的多裂缝起裂过程中不同压裂间距与压裂顺序产生的应力阴影效应.数值计算结果表明:泊松比、抗拉强度与孔隙率的增加会增大裂缝引起的诱发应力与净压力比值的峰值,而弹性模量和水平主应力差的增大会减小该峰值;裂缝间距的扩大可以减弱裂缝间应力阴影效应;两步压裂与顺序压裂的裂缝总面积均大于同时压裂时的面积,但顺序压裂与两步压裂会带来更高的起裂压力;产层厚度与压裂间距的减小会增大应力阴影效应.展开更多
基金funded by the National Natural Science Foundation of China(42077247,52104029)the Fundamental Research Funds for the Central Universities.
文摘In the Changqing Oilfield in northwest China, when traditional petroleum exploitation encounters forestry reserves or water source protection areas, sectorial well-factory design is proposed. The most distinct feature of a sectorial well-factory is the deviation of the well from the minimum horizontal principal stress, resulting in hydraulic fracture deflection after the initiation, along with possible well interference (i.e., fracture hit) and fracture coalescence in the oblique wells. Four indexes describing well deflection are then proposed according to fracture morphology. Several fracturing designs, including stage arrangement, fracturing sequences, and fracturing techniques are applied to study the feasibility of the sectorial well-factory design. The results show that the “gradual” or “sparse” stage arrangement, large injection rate, and simultaneous multifracture treatment can help to optimize the fracture morphology and stimulation design. However, the subsequent stress shadowing effect usually adversely affects the fracturing of adjacent wells. With a small initial horizontal stress difference, large injection rate and staggered stage arrangement can achieve ideal stimulation performance. Our results can provide a guidance for optimizing stimulation design in unconventional well-factory while taking into account environmental protection.
基金financially supported by the Postgraduate Research&Practice Innovation Program of Jiangsu Province(KYCX21_2358)the National Key Research and Development Program of China(2020YFB1314204)National Natural Science Foundation of China(No.52074239)。
文摘Pre-driven longwall retracement roadway(PLRR)is commonly used in large mine shaft.The support crushing disasters occur frequently during the retracement,and roof management is necessary.Taking the 31107 panel as research background,the roof breaking structure of PLRR is analyzed.It is concluded that the roof cutting with vertical hydraulic fracture(HF)at a specified position,that is,fixed-length roof cutting,can reduce support load and keep immediate roof intact.The extended finite element method(XFEM)is applied to simulate hydraulic fracturing.The results show that both the axial and transverse hydraulic fracturing cannot effectively create vertical HFs.Therefore,a novel construction method of vertical HF based on the stress shadow effect(SSE)is proposed.The stress reversal region and HF orientation caused by the prefabricated hydraulic fracture(PF)are verified in simulation.The sub-vertical HFs are obtained between two PFs,the vertical extension range of which is much larger than that of directional hydraulic fracturing.The new construction method was used to determine the field plan for fixed-length roof cutting.The roof formed a stable suspended structure and deformation of the main PLRR was improved after hydraulic fracturing.
基金supported by the National Key Basic Research Science Foundation (No.2007CB209400)the National Natural Science Foundation of China (No.40638040,10672028)the Chinese Postdoctoral Science Foundation (No.20070421048)
文摘Global Positioning System (GPS) and Interferometric Synthetic Aperture Radar (InSAR), used for monitoring crust deformation, are found to be very promising in earthquake prediction subject to stress-forecasting. However, it is recognized that unless we can give reasonable explanations of these curious precursory phenomena that continue to be serendipitously observed from time to time, such high technology of GPS or InSAR is difficult to be efficiently used. Therefore, a proper model revealing the relation between earthquake evolution and stress variation, such as the phenomena of stress buildup, stress shadow and stress transfer (SSS), is crucial to the GPS or InSAR based earthquake prediction. Here we address this question through a numerical approach of earthquake development using an intuitive physical model with a map-like configuration of discontinuous fault system. The simulation provides a physical basis for the principle of stress-forecasting of earthquakes based on SSS and for the application of GPS or InSAR in earthquake prediction. The observed SSS associated phenomena with images of stress distribution during the failure process can be continuously simulated. It is shown that the SSS are better indicators of earthquake precursors than that of seismic foreshocks, suggesting a predictability of earthquakes based on stress-forecasting strategy.
基金Granted jointly by the Funds for Program for NCET in University (NCET-04-917)NSF (40863002)Project for the Distinguishing Discipline of KUST (2008)
文摘The Tongchang orefield is located in the central part of the Mianxian-Lueyang-Yangpingguan area that is celebrated as a 'gold triangle' area,at the juncture of the latitudinal tectonic zone of South Qinling,the Longmenshan Cathysian tectonic zone and the Sichuan-Yunnan longitudinal tectonic zone,where there are distributed Cu-Au polymetallic ore deposits(occurrences) including the Tongchang,Chenjiaba,Qinjiabian,Hongtushi,Yinshangou and Xiakouyi ore deposits(mineralization).Based on the "giant pressure shadow" structure put forward and demonstrated by numerical modeling of the tectonic stress field and the static photoelasticity experiments on the basis of tectonic ore-controlling laws in the orefield,tectonic metallogenesis driven by orefield tectonic stress has been discussed in terms of its geological setting,orefield geomechanics,and tectonic stress field.It is thought that the dynamic evolution model of the tectonic stress field controls the whole process of formation of the polymetallic ore deposits(mineralization) in the orefield,as well as the deformation field.As a result,it controls the emplacement of rockbodies and the transformation of ore-source bodies,and provides both the channel-ways for ore-forming fluids and ore-hosting space.Furthermore,it controls the migration potential field of fluids and,thereafter,its flow direction,rate and volume;the tectonic stress field also controls the energy field and hence controls the position of occurrence of ore deposits and their scale.The method of tectonic stress field has been applied to ore prognosis in the orefield.The rules of magmatic emplacement and metallogenic fluid migrating and concentrating under the control of the structural stress field were expounded,hence providing the theoretical basis for the prognosis of concealed ores.In addition,a number of important target areas have been defined.
文摘采用PHF-LSM(permeability-based hydraulic fracture-level set method)水力压裂计算模型,建立了含节理分布的岩石材料模型,将其计算结果与裂缝几何特征和诱发应力理论解对比验证模型正确性,在此基础上分析节理对水力裂缝应力阴影效应的影响.计算结果表明:基于弥散裂缝模型的PHF模型应使用等效开裂区域最外侧结点位移差作为裂缝等效开度;节理的存在会影响裂缝注水过程中水压力变化,同时会引起裂缝等效开度的增大;较大的节理入射角度与距注水点较小的节理高度会产生更大诱发应力,同时会引起最小主应力方向的改变,导致更强应力阴影效应,裂缝偏转加强.
基金Key project from China Seismological Bureau (9691309020301)and State Natural Sciences Foundation of China (19732060 and 46764010
文摘Using a plexiglass sample and by means of real-time holographic interferometry and shadow optical method of caustics, the different features of dynamic variation in stress (strain) field, plastic area and nucleation zone (shadow area) when the sample fractures during loading (loading-fracture) and unloading (unloading-fracture) are studied visually. The results show that the strain nuclei (zones with dense fringes) appear first at the tips of prefabricated cracks at low stress, and then the shadow areas of caustics form with the increase of load. These nuclei and shadow areas can become larger, or smaller, when the process of loading, or unloading, goes on. When the stress is kept within a certain range, the shadow areas of caustics can become larger and smaller alternatively with repeated loading and unloading (cyclic loading). However, when loading and unloading at high stress, in particular when the macrofracture is about to appear, the variations of the shadow areas of caustics are irreversible and quite different. The shadow areas of caustics expand rapidly at an increasing speed when loading-fracture appears. In contrast, the shadow areas of caustics expand at a lower speed when unloading-fracture appears; besides, there is a circular shadow in front of the sharp-angle shaped area.
文摘采用PHF-LSM(permeability-based hydraulic fracture-level set method)水力压裂数值计算模型,模拟并分析了均质与分层岩石材料中分段压裂过程引起的应力阴影效应.通过与单一裂缝诱发应力理论解的对比,验证了PHF-LSM考虑应力阴影效应的可行性.以此模型为基础分析了单一裂缝发展过程中,岩石材料参数与初始应力条件对诱发应力场的影响,以及均质与分层岩石材料的多裂缝起裂过程中不同压裂间距与压裂顺序产生的应力阴影效应.数值计算结果表明:泊松比、抗拉强度与孔隙率的增加会增大裂缝引起的诱发应力与净压力比值的峰值,而弹性模量和水平主应力差的增大会减小该峰值;裂缝间距的扩大可以减弱裂缝间应力阴影效应;两步压裂与顺序压裂的裂缝总面积均大于同时压裂时的面积,但顺序压裂与两步压裂会带来更高的起裂压力;产层厚度与压裂间距的减小会增大应力阴影效应.