Debris flows have caused serious human casualties and economic losses in the regions strongly affected by the Ms8.0 Wenchuan earthquake of 2oo8. Debris flow mitigation and risk assessment is a key issue for reconstruc...Debris flows have caused serious human casualties and economic losses in the regions strongly affected by the Ms8.0 Wenchuan earthquake of 2oo8. Debris flow mitigation and risk assessment is a key issue for reconstruction. The existing methods of inundation simulation are based on historical disasters and have no power of prediction. The rain- flood method can not yield detailed flow hydrograph and does not meet the need of inundation simulation. In this paper, the process of water flow was studied by using the Arc-SCS model combined with hydraulic method, and then the debris flow runoff process was calculated using the empirical formula combining the result from Arc-SCS. The peak discharge and runoff duration served as input of inundation simulation. Then, the dangerous area is predicted using kinematic wave method and Manning equation. Taking the debris flow in Huashiban gully in Beichuan County, Sichuan Province, China on 24 Sep. 2oo8 as example, the peak discharge of water flow and debris flow were calculated as 35.52 m3·s-1 and 215.66 m3·s-, with error of 4.15% compared to the measured values. The simulated area of debris-flow deposition was 161,500 m2, vs. the measured area of 144,097 m2, in error of 81.75%. The simulated maximum depth was 12.3 m, consistent with the real maximum depth between lO and 15 m according to the field survey. The minor error is mainly due to the flow impact on buildings and variations in cross-section configuration. The present methodology can be applied to predict debrisflow magnitude and evaluate its risk in other watersheds inthe earthquake area.展开更多
Intense human activities have greatly changed the flood generation conditions in most areas of the world, and have destroyed the consistency in the annual flood peak and volume series. For design flood estimation, coa...Intense human activities have greatly changed the flood generation conditions in most areas of the world, and have destroyed the consistency in the annual flood peak and volume series. For design flood estimation, coaxial correlation diagram and conceptual hydrological model are two frequently used tools to adjust and reconstruct the flood series under human disturbance. This study took a typical mountain catchment of the Haihe River Basin as an example to investigate the effects of human activities on flood regime and to compare and assess the two adjustment methods. The main purpose is to construct a conceptual hydrological model which can incorporate the effects of human activities. The results show that the coaxial correlation diagram is simple and widely-used, but can only adjust the time series of total flood volumes. Therefore, it is only applicable under certain conditions(e.g. There is a strong link between the flood peaks and volumes and the link is not significantly affected by human activities). The conceptual model is a powerful tool to adjust the time series of both flood peak flows and flood volumes over different durations provided that it is closely related to the catchment hydrological characteristics, specifically accounting for the effects of human activities, and incorporating expert knowledge when estimating or calibrating parameters. It is suggested that the two methods should be used together to cross check each other.展开更多
基金supported by the National Basic Research Program of China(973 Program)(Grant No.2011CB409902)the National Natural Sciences Foundation of China(Grant No. 40671025)
文摘Debris flows have caused serious human casualties and economic losses in the regions strongly affected by the Ms8.0 Wenchuan earthquake of 2oo8. Debris flow mitigation and risk assessment is a key issue for reconstruction. The existing methods of inundation simulation are based on historical disasters and have no power of prediction. The rain- flood method can not yield detailed flow hydrograph and does not meet the need of inundation simulation. In this paper, the process of water flow was studied by using the Arc-SCS model combined with hydraulic method, and then the debris flow runoff process was calculated using the empirical formula combining the result from Arc-SCS. The peak discharge and runoff duration served as input of inundation simulation. Then, the dangerous area is predicted using kinematic wave method and Manning equation. Taking the debris flow in Huashiban gully in Beichuan County, Sichuan Province, China on 24 Sep. 2oo8 as example, the peak discharge of water flow and debris flow were calculated as 35.52 m3·s-1 and 215.66 m3·s-, with error of 4.15% compared to the measured values. The simulated area of debris-flow deposition was 161,500 m2, vs. the measured area of 144,097 m2, in error of 81.75%. The simulated maximum depth was 12.3 m, consistent with the real maximum depth between lO and 15 m according to the field survey. The minor error is mainly due to the flow impact on buildings and variations in cross-section configuration. The present methodology can be applied to predict debrisflow magnitude and evaluate its risk in other watersheds inthe earthquake area.
基金supported by the National Natural Science Foundation of China (Grant Nos. 41130639, 51179045, 41201028)the Nonprofit Industry Financial Program of MWR of China (201501022)
文摘Intense human activities have greatly changed the flood generation conditions in most areas of the world, and have destroyed the consistency in the annual flood peak and volume series. For design flood estimation, coaxial correlation diagram and conceptual hydrological model are two frequently used tools to adjust and reconstruct the flood series under human disturbance. This study took a typical mountain catchment of the Haihe River Basin as an example to investigate the effects of human activities on flood regime and to compare and assess the two adjustment methods. The main purpose is to construct a conceptual hydrological model which can incorporate the effects of human activities. The results show that the coaxial correlation diagram is simple and widely-used, but can only adjust the time series of total flood volumes. Therefore, it is only applicable under certain conditions(e.g. There is a strong link between the flood peaks and volumes and the link is not significantly affected by human activities). The conceptual model is a powerful tool to adjust the time series of both flood peak flows and flood volumes over different durations provided that it is closely related to the catchment hydrological characteristics, specifically accounting for the effects of human activities, and incorporating expert knowledge when estimating or calibrating parameters. It is suggested that the two methods should be used together to cross check each other.