This paper addresses the change of the river-lake relationship in the Huai River and its causes due to environmental change and human activities. A preliminary analysis is made from three aspects: (1) the natural geog...This paper addresses the change of the river-lake relationship in the Huai River and its causes due to environmental change and human activities. A preliminary analysis is made from three aspects: (1) the natural geographical change particularly captured by the Yellow River, (2) water conservancy project construction, and (3) socioeconomic development in the Huai River Basin. Key problems of changes in this river-lake relationship and the Huai River flood control are tackled, involving flood control and disaster alleviation ability of the Basin, engineering and non-engineering measurements applied to flood control and disaster mitigation, and water governance for adaptive management. Research shows that the Huai River is a rather complex one due to its complex geography with a hybrid wet and dry climate zoon, and higher population density. With the alternation of the river-lake relationship and socioeconomic development in the region, new problems keep arising, imposing new requirements on its sustainable water management. Thus, understanding the Huai River is a long and gradually improving process. Its future planning should keep absorbing new achievements of science and technology development, employing new technologies and methods, and gradually deepening our understanding of its fundamental principles. Water governance and adaptive water management will be new challenges and opportunities for the Basin in its river system change and flood control.展开更多
This paper summarizes the results of the authors' research conducted in November 2013 with the aim to analyze the organization and standards of the personnel management in the Slovak building industry. The research w...This paper summarizes the results of the authors' research conducted in November 2013 with the aim to analyze the organization and standards of the personnel management in the Slovak building industry. The research was based on the presumption that optimal mastering of the personnel management is a precondition of the success of each building company that wishes to be a continuously prosperous, competitive, and respected economic and social entity. Altogether, 76 small (less than 50 employees), 77 medium-sized (50-249 employees), and 21 big (250 and more employees) building companies operating in the territory of the Slovak Republic took part in the research. The results of the research showed that the concept of the personnel management in big building companies (in particular in comparison to most small companies but some medium-sized companies) was more strategic and systematic which is natural given the high numbers of employees of various professions who carry out manifold building works in a huge set of working conditions. However, from the point of view of the current economic development, all building companies have to develop their adaptability to the building market and their capability to master various building works. It is just the personnel management that is used to make it all up provided it is implemented efficiently in a purposeful way in order to keep the stable operation of the building company and satisfaction of various needs of stakeholders including but not limited to employees and clients.展开更多
基金The National Basic Research Program of China (2010CB428406)the National Natural Science Foundation of China (No. 41071025/40730632) & National Key Water Project (No.2009ZX07210-006)
文摘This paper addresses the change of the river-lake relationship in the Huai River and its causes due to environmental change and human activities. A preliminary analysis is made from three aspects: (1) the natural geographical change particularly captured by the Yellow River, (2) water conservancy project construction, and (3) socioeconomic development in the Huai River Basin. Key problems of changes in this river-lake relationship and the Huai River flood control are tackled, involving flood control and disaster alleviation ability of the Basin, engineering and non-engineering measurements applied to flood control and disaster mitigation, and water governance for adaptive management. Research shows that the Huai River is a rather complex one due to its complex geography with a hybrid wet and dry climate zoon, and higher population density. With the alternation of the river-lake relationship and socioeconomic development in the region, new problems keep arising, imposing new requirements on its sustainable water management. Thus, understanding the Huai River is a long and gradually improving process. Its future planning should keep absorbing new achievements of science and technology development, employing new technologies and methods, and gradually deepening our understanding of its fundamental principles. Water governance and adaptive water management will be new challenges and opportunities for the Basin in its river system change and flood control.
文摘This paper summarizes the results of the authors' research conducted in November 2013 with the aim to analyze the organization and standards of the personnel management in the Slovak building industry. The research was based on the presumption that optimal mastering of the personnel management is a precondition of the success of each building company that wishes to be a continuously prosperous, competitive, and respected economic and social entity. Altogether, 76 small (less than 50 employees), 77 medium-sized (50-249 employees), and 21 big (250 and more employees) building companies operating in the territory of the Slovak Republic took part in the research. The results of the research showed that the concept of the personnel management in big building companies (in particular in comparison to most small companies but some medium-sized companies) was more strategic and systematic which is natural given the high numbers of employees of various professions who carry out manifold building works in a huge set of working conditions. However, from the point of view of the current economic development, all building companies have to develop their adaptability to the building market and their capability to master various building works. It is just the personnel management that is used to make it all up provided it is implemented efficiently in a purposeful way in order to keep the stable operation of the building company and satisfaction of various needs of stakeholders including but not limited to employees and clients.