期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Run of River Bulk Hydroelectric Generation from the Congo River without a Conventional Dam 被引量:1
1
作者 Thomas J. Hammons Pathmanathan Naidoo Lawrence Musaba 《Natural Resources》 2011年第1期18-21,共4页
The paper discusses harvesting the Congo River for bulk hydroelectric generation based on run of river, low head generation technology, as employed at the existing Inga 2 power station in the Democratic Republic of Co... The paper discusses harvesting the Congo River for bulk hydroelectric generation based on run of river, low head generation technology, as employed at the existing Inga 2 power station in the Democratic Republic of Congo. The evolutionary approach builds on existing infrastructure.The results show that the footprint is much smaller than that which employs a conventional dam. The environmental impact is minimized. These collectively will contribute to lower capital costs. In summary, 10,000 cm3/sec of constant river flow will produce 5,000 MW of base power. On average, the constant recorded flow of the river is 30,000 cm3/sec and a total of 15,000 MW of base power generation is possible. 展开更多
关键词 Hydroelectric Power GENERATION RIVER Engineering Environmental iimpact HYDROPOWER Development in DRC
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部