The optimization of inspection intervals for composite structures has been proposed,but only one damage type,dent damage,has been addressed so far.The present study focuses on the two main damage types of dent and del...The optimization of inspection intervals for composite structures has been proposed,but only one damage type,dent damage,has been addressed so far.The present study focuses on the two main damage types of dent and delamination,and a model for optimizing the inspection interval of composite structures is proposed to minimize the total maintenance cost on the premise that the probability of structure failure will not exceed the acceptable level.In order to analyze the damage characteristics and the residual strength of the composite structure,the frequency,energy,size,and depth of the damage are studied,and the situation of missing detection during the inspection is considered.The structural residual strength and total maintenance cost are quantified corresponding to different inspection intervals.The proposed optimization method relieves the constraints in previous simulation methods,and is more consistent with the actual situation.Finally,the outer wing of aircraft is taken as an example,and with the historical cases and experimental data,the optimization method is verified.The optimal inspection interval is shorter than the actually implemented inspection interval,and the corresponding maintenance cost is reduced by 23.3%.The result shows the feasibility and effectiveness of the proposed optimization method.展开更多
This research article is based on a study of optimal frequency to the repairable system due to the failure finding interval to maximize as well as minimize the availability of some components devices. We studied toget...This research article is based on a study of optimal frequency to the repairable system due to the failure finding interval to maximize as well as minimize the availability of some components devices. We studied together maintenance and corrective actions that carried out item of failure and periodic failure finding designed to check whether a system is still working. The model is proved as well as useful application in detecting the problem related to finding failure tasks of different scheme devices by maximization. The model formulated and the numerical application to the relevant mathematical model have been discussed to demonstrate the article quality. Therefore based on probability analytic development, the optimal maintenance policy is then obtained as solution of an optimization problem in which the maintenance cost rate is the objective function and the risk of corrective maintenance is the constraint function. Finally, the solution to the optimal device in the considered development model has been well adjusted due to derivation to the experimental observation rather than theory which will be taken into consideration in the next applied practical design research related and the system device provided that, the proactive device agreed with using the exponential distribution to the survive distribution function which can not be considered as valid.展开更多
This paper proposes an optimal failure-finding interval (FFI) model based on maximizing expected availability. The model can be viewed as an extension and improvement to the model presented in Moubray (1997). Nume...This paper proposes an optimal failure-finding interval (FFI) model based on maximizing expected availability. The model can be viewed as an extension and improvement to the model presented in Moubray (1997). Numerical results are also included to illustrate the appropriateness of the proposed model.展开更多
Influences of inspecting time-interval and location on varying behavior of metal magnetic memory (MMM) signals of defects were studied. Different areas in two precracked weldments were inspected at different time-inte...Influences of inspecting time-interval and location on varying behavior of metal magnetic memory (MMM) signals of defects were studied. Different areas in two precracked weldments were inspected at different time-intervals by type TSC-1M-4 stress-concentration magnetic inspector to obtain MMM signals. Mechanisms of MMM signals varying behavior with inspecting time and space were analyzed and discussed respectively. It is found that MMM signals don't change with inspecting time-interval, since stress field and magnetic leakage field maintain unchanged at any time after welding. On the other hand, MMM signals differ greatly for different inspecting locations, because stress field and magnetic leakage field are unevenly distributed in defective ferromagnetic materials.展开更多
With the further development of service-oriented,performance-based contracting(PBC)has been widely adopted in industry and manufacturing.However,maintenance optimization problems under PBC have not received enough att...With the further development of service-oriented,performance-based contracting(PBC)has been widely adopted in industry and manufacturing.However,maintenance optimization problems under PBC have not received enough attention.To further extend the scope of PBC’s application in the field of maintenance optimization,we investigate the condition-based maintenance(CBM)optimization for gamma deteriorating systems under PBC.Considering the repairable single-component system subject to the gamma degradation process,this paper proposes a CBM optimization model to maximize the profit and improve system performance at a relatively low cost under PBC.In the proposed CBM model,the first inspection interval has been considered in order to reduce the inspection frequency and the cost rate.Then,a particle swarm algorithm(PSO)and related solution procedure are presented to solve the multiple decision variables in our proposed model.In the end,a numerical example is provided so as to demonstrate the superiority of the presented model.By comparing the proposed policy with the conventional ones,the superiority of our proposed policy is proved,which can bring more profits to providers and improve performance.Sensitivity analysis is conducted in order to research the effect of corrective maintenance cost and time required for corrective maintenance on optimization policy.A comparative study is given to illustrate the necessity of distinguishing the first inspection interval or not.展开更多
基金supported by the National Natural Science Foundation of China(U1533202)the Fundamental Research Funds for the Central Universities(NP2019408)。
文摘The optimization of inspection intervals for composite structures has been proposed,but only one damage type,dent damage,has been addressed so far.The present study focuses on the two main damage types of dent and delamination,and a model for optimizing the inspection interval of composite structures is proposed to minimize the total maintenance cost on the premise that the probability of structure failure will not exceed the acceptable level.In order to analyze the damage characteristics and the residual strength of the composite structure,the frequency,energy,size,and depth of the damage are studied,and the situation of missing detection during the inspection is considered.The structural residual strength and total maintenance cost are quantified corresponding to different inspection intervals.The proposed optimization method relieves the constraints in previous simulation methods,and is more consistent with the actual situation.Finally,the outer wing of aircraft is taken as an example,and with the historical cases and experimental data,the optimization method is verified.The optimal inspection interval is shorter than the actually implemented inspection interval,and the corresponding maintenance cost is reduced by 23.3%.The result shows the feasibility and effectiveness of the proposed optimization method.
文摘This research article is based on a study of optimal frequency to the repairable system due to the failure finding interval to maximize as well as minimize the availability of some components devices. We studied together maintenance and corrective actions that carried out item of failure and periodic failure finding designed to check whether a system is still working. The model is proved as well as useful application in detecting the problem related to finding failure tasks of different scheme devices by maximization. The model formulated and the numerical application to the relevant mathematical model have been discussed to demonstrate the article quality. Therefore based on probability analytic development, the optimal maintenance policy is then obtained as solution of an optimization problem in which the maintenance cost rate is the objective function and the risk of corrective maintenance is the constraint function. Finally, the solution to the optimal device in the considered development model has been well adjusted due to derivation to the experimental observation rather than theory which will be taken into consideration in the next applied practical design research related and the system device provided that, the proactive device agreed with using the exponential distribution to the survive distribution function which can not be considered as valid.
文摘This paper proposes an optimal failure-finding interval (FFI) model based on maximizing expected availability. The model can be viewed as an extension and improvement to the model presented in Moubray (1997). Numerical results are also included to illustrate the appropriateness of the proposed model.
基金Project(50475113) supported by the National Natural Science Foundation of ChinaProject(20030056002) supported by Specialized Research Fund for Doctoral Program of Higher Education, China
文摘Influences of inspecting time-interval and location on varying behavior of metal magnetic memory (MMM) signals of defects were studied. Different areas in two precracked weldments were inspected at different time-intervals by type TSC-1M-4 stress-concentration magnetic inspector to obtain MMM signals. Mechanisms of MMM signals varying behavior with inspecting time and space were analyzed and discussed respectively. It is found that MMM signals don't change with inspecting time-interval, since stress field and magnetic leakage field maintain unchanged at any time after welding. On the other hand, MMM signals differ greatly for different inspecting locations, because stress field and magnetic leakage field are unevenly distributed in defective ferromagnetic materials.
文摘With the further development of service-oriented,performance-based contracting(PBC)has been widely adopted in industry and manufacturing.However,maintenance optimization problems under PBC have not received enough attention.To further extend the scope of PBC’s application in the field of maintenance optimization,we investigate the condition-based maintenance(CBM)optimization for gamma deteriorating systems under PBC.Considering the repairable single-component system subject to the gamma degradation process,this paper proposes a CBM optimization model to maximize the profit and improve system performance at a relatively low cost under PBC.In the proposed CBM model,the first inspection interval has been considered in order to reduce the inspection frequency and the cost rate.Then,a particle swarm algorithm(PSO)and related solution procedure are presented to solve the multiple decision variables in our proposed model.In the end,a numerical example is provided so as to demonstrate the superiority of the presented model.By comparing the proposed policy with the conventional ones,the superiority of our proposed policy is proved,which can bring more profits to providers and improve performance.Sensitivity analysis is conducted in order to research the effect of corrective maintenance cost and time required for corrective maintenance on optimization policy.A comparative study is given to illustrate the necessity of distinguishing the first inspection interval or not.