In this paper,two lifting mechanism models with opposing placements,which use the same hydraulic hoist model and have the same angle of 50°,have been developed.The mechanical and hydraulic simulation models are e...In this paper,two lifting mechanism models with opposing placements,which use the same hydraulic hoist model and have the same angle of 50°,have been developed.The mechanical and hydraulic simulation models are established using MATLAB Simscape to analyze their kinetics and dynamics in the lifting and holding stages.The simulation findings are compared to the analytical calculation results in the steady state,and both methods show good agreement.In the early lifting stage,Model 1 produces greater force and discharges goods in the container faster than Model 2.Meanwhile,Model 2 reaches a higher force and ejects goods from the container cleaner than its counterpart at the end lifting stage.The established simulation models can consider the effects of dynamic loads due to inertial moments and forces generated during the system operation.It is crucial in studying,designing,and optimizing the structure of hydraulic-mechanical systems.展开更多
The multi-robot coordinated lifting system is an unconstrained system with a rigid and flexible coupling.The deformation of the flexible rope causes errors in the movement trajectory of the lifting system.Based on the...The multi-robot coordinated lifting system is an unconstrained system with a rigid and flexible coupling.The deformation of the flexible rope causes errors in the movement trajectory of the lifting system.Based on the kinematic and dynamic analysis of the lifting system,the elastic catenary mod-el considering the elasticity and mass of the flexible rope is established,and the effect of the deform-ation of the flexible rope on the position and posture of the suspended object is analyzed.According to the deformation of flexible rope,a real-time trajectory compensation method is proposed based on the compensation principle of position and posture.Under the lifting task of the low-speed move-ment,this is compared with that of the system which neglects the deformation of the flexible rope.The trajectoy of the lifting system considering the deformation of flexible rope.The results show that the mass and elasticity of the flexible rope can not be neglected.Meanwhile,the proposed trajectory compensation method can improve the movement accuracy of the lifting system,which verifies the ef-fectiveness of this compensation method.The research results provide the basis for trajectory plan-ning and coordinated control of the lifting system。展开更多
With the arrival of the big data era, the modern higher education model has undergone radical changes, and higher requirements have been put forward for the data literacy of college teachers. The paper first analyzes ...With the arrival of the big data era, the modern higher education model has undergone radical changes, and higher requirements have been put forward for the data literacy of college teachers. The paper first analyzes the connotation of teacher data literacy, and then combs through the status quo and dilemmas of teachers’ data literacy ability in applied universities. The paper proposes to enhance the data literacy ability of teachers from the perspective of organizational learning. Through building a digital culture, building a data-driven teaching environment, and constructing an interdisciplinary learning community to further promote the application of the theory and practice of datafication inside and outside the organization, and ultimately improve the quality of teaching.展开更多
A newnumerical method based on vector form intrinsic finite element(VFIFE) is proposed to simulate the integral lifting process of steel structures. First, in order to verify the validity of the VFIFE method, taking...A newnumerical method based on vector form intrinsic finite element(VFIFE) is proposed to simulate the integral lifting process of steel structures. First, in order to verify the validity of the VFIFE method, taking the steel gallery between the integrated building and the attached building of Nanjing M obile Communication Buildings for example, the static analysis was carried out and the corresponding results were compared with the results achieved by the traditional finite element method. Then, according to the characteristics of dynamic construction of steel structure integral lifting, the tension cable element was employed to simulate the behavior of dynamic construction. The VFIFE method avoids the iterative solution of the stiffness matrix and the singularity problems. Therefore, it is simple to simulate the complete process of steel structure lifting construction.Finally, by using the VFIFE, the displacement and internal force time history curves of the steel structures under different lifting speeds are obtained. The results show that the lifting speed has influence on the lifting force, the internal force, and the displacement of the structure. In the case of normal lifting speed, the dynamic magnification factor of 1. 5 is safe and reasonable for practical application.展开更多
This paper discusses the signal decomposition method using the extreme-lifting scheme and two two-dimensional decomposition schemes: separable one-dimensional scheme and two-dimensional scheme with quincunx sampling. ...This paper discusses the signal decomposition method using the extreme-lifting scheme and two two-dimensional decomposition schemes: separable one-dimensional scheme and two-dimensional scheme with quincunx sampling. The structure of the relation "~" between Ex and Ey of these two schemes is symmetrical and both these two schemes have shortcomings)An unsymmetrical scheme of the extreme-lifting scheme is proposed in this paper, which canbe directly used to decompose two-dimensional image and can get better decomposition result than the two schemes with little computation cost.展开更多
Sutong Bridge is a cable-stayed bridge with a steel box girder and a main span of 1 088 m.The steel box girder of main span includes five portions:back span large unit,large block of pylon,standard girder,back span cl...Sutong Bridge is a cable-stayed bridge with a steel box girder and a main span of 1 088 m.The steel box girder of main span includes five portions:back span large unit,large block of pylon,standard girder,back span closure girder and middle span closure girder.Each back span large unit is fabricated by welding several deck segments together in factory,and is erected by floating crane.As navigational clearance of the main bridge is high,the traditional truss lifting device can't satisfy the requirement of domestic lifting cranes for this kind of lifting height and weight.Hence,a kind of lighter lifting device for the erection of back span large units was accepted for this bridge.In this paper,the design and use of this lifting device is introduced.The upper structure used lifting gantry to install the standard girder segment by cantilever method.Because the bridge's navigation clearance is high,and the girder segment is wide and heavy,the meteorology and hydrology condition of the bridge district is abominable,and the requirements of long cable girder side pull-in,structure and performance propose high request to the lifting gantry.In this paper,the design and use key point of long cable pull-in angle adjustment device integrate into lifting gantry is introduced.展开更多
Quasi-cyclic low-density parity-check (QC-LDPC) codes can be constructed conveniently by cyclic lifting of protographs. For the purpose of eliminating short cycles in the Tanner graph to guarantee performance, first...Quasi-cyclic low-density parity-check (QC-LDPC) codes can be constructed conveniently by cyclic lifting of protographs. For the purpose of eliminating short cycles in the Tanner graph to guarantee performance, first an algorithm to enumerate the harmful short cycles in the protograph is designed, and then a greedy algorithm is proposed to assign proper permutation shifts to the circulant permutation submatrices in the parity check matrix after lifting. Compared with the existing deterministic edge swapping (DES) algorithms, the proposed greedy algorithm adds more constraints in the assignment of permutation shifts to improve performance. Simulation results verify that it outperforms DES in reducing short cycles. In addition, it is proved that the parity check matrices of the cyclic lifted QC-LDPC codes can be transformed into block lower triangular ones when the lifting factor is a power of 2. Utilizing this property, the QC- LDPC codes can be encoded by preprocessing the base matrices, which reduces the encoding complexity to a large extent.展开更多
The current morphological wavelet technologies utilize a fixed filter or a linear decomposition algorithm, which cannot cope with the sudden changes, such as impulses or edges in a signal effectively. This paper pre- ...The current morphological wavelet technologies utilize a fixed filter or a linear decomposition algorithm, which cannot cope with the sudden changes, such as impulses or edges in a signal effectively. This paper pre- sents a novel signal processing scheme, adaptive morpho- logical update lifting wavelet (AMULW), for rolling element bearing fault detection. In contrast with the widely used morphological wavelet, the filters in AMULW are no longer fixed. Instead, the AMULW adaptively uses a morphological dilation-erosion filter or an average filter as the update lifting filter to modify the approximation signal. Moreover, the nonlinear morphological filter is utilized to substitute the traditional linear filter in AMULW. The effectiveness of the proposed AMULW is evaluated using a simulated vibration signal and experimental vibration sig- nals collected from a bearing test rig. Results show that the proposed method has a superior performance in extracting fault features of defective roiling element bearings.展开更多
In order to investigate the characteristics of particle-induced pressure loss in the solid–liquid lifting pipe,a series of experiments were conducted in 200 mm diameter lifting pipe.Simulation manganese nodules with ...In order to investigate the characteristics of particle-induced pressure loss in the solid–liquid lifting pipe,a series of experiments were conducted in 200 mm diameter lifting pipe.Simulation manganese nodules with five different mean diameters of10 mm,20 mm,30 mm,40 mm and 50 mm were used,both in isolation and a combination in equal fraction by mass.The flow velocities in the lifting pipe ranged from 0.12 m/s to 1.61 m/s,and the mass of particles employed was 10 kg for each particle diameter.Three regimes,wavy bed,partly fluidization,and fully fluidization,were observed over the flow velocity.The solid–liquid pressure drop data were measured by differential pressure transmitter,and pressure drop caused by the solid particles was calculated and analyzed.The results show that the evolutions of the pressure loss due to solid particles are relevant to the solid–liquid flow regimes,and they are distinctly influenced by fluid velocity and particle size.展开更多
Giant hiatal hernia(GHH) comprises 5% of hiatal hernia and is associated with significant complications.The traditional operative procedure,no matter transthoracic or transabdomen repair of giant hiatal hernia,is ch...Giant hiatal hernia(GHH) comprises 5% of hiatal hernia and is associated with significant complications.The traditional operative procedure,no matter transthoracic or transabdomen repair of giant hiatal hernia,is characteristic of more invasion and more complications.Although laparoscopic repair as a minimally invasive surgery is accepted,a part of patients can not tolerate pneumoperitoneum because of combination with cardiopulmonary diseases or severe posterior mediastinal and neck emphesema during operation.The aim of this article was to analyze our experience in gasless laparoscopic repair with abdominal wall lifting to treat the giant hiatal hernia.We performed a retrospective review of patients undergoing gasless laparoscopic repair of GHH with abdominal wall lifting from 2012 to 2015 at our institution.The GHH was defined as greater than one-third of the stomach in the chest.Gasless laparoscopic repair of GHH with abdominal wall lifting was attempted in 27 patients.Mean age was 67 years.The results showed that there were no conversions to open surgery and no intraoperative deaths.The mean duration of operation was 100 min(range:90–130 min).One-side pleura was injured in 4 cases(14.8%).The mean postoperative length of stay was 4 days(range:3–7 days).Median follow-up was 26 months(range:6–38 months).Transient dysphagia for solid food occurred in three patients(11.1%),and this symptom disappeared within three months.There was one patient with recurrent hiatal hernia who was reoperated on.Two patients still complained of heartburn three months after surgery.Neither reoperation nor endoscopic treatment due to signs of postoperative esophageal stenosis was required in any patient.Totally,satisfactory outcome was reported in 88.9% patients.It was concluded that the gasless laparoscopic approach with abdominal wall lifting to the repair of GHH is feasible,safe,and effective for the patients who cannot tolerate the pneumoperitoneum.展开更多
基金Ho Chi Minh City University of Technology(HCMUT)Vietnam National University Ho Chi Minh City(VNU-HCM)for supporting this study。
文摘In this paper,two lifting mechanism models with opposing placements,which use the same hydraulic hoist model and have the same angle of 50°,have been developed.The mechanical and hydraulic simulation models are established using MATLAB Simscape to analyze their kinetics and dynamics in the lifting and holding stages.The simulation findings are compared to the analytical calculation results in the steady state,and both methods show good agreement.In the early lifting stage,Model 1 produces greater force and discharges goods in the container faster than Model 2.Meanwhile,Model 2 reaches a higher force and ejects goods from the container cleaner than its counterpart at the end lifting stage.The established simulation models can consider the effects of dynamic loads due to inertial moments and forces generated during the system operation.It is crucial in studying,designing,and optimizing the structure of hydraulic-mechanical systems.
基金the National Natural Science Foundation of China(No.51965032)the Natural Science Foundation of Gansu Province of China(No.22JR5RA319)+1 种基金the Science and Technology Foundation of Gansu Province of China(No.21YF5WA060)the Excellent Doctoral Student Foundation of Gansu Province of China(No.23JRRA842).
文摘The multi-robot coordinated lifting system is an unconstrained system with a rigid and flexible coupling.The deformation of the flexible rope causes errors in the movement trajectory of the lifting system.Based on the kinematic and dynamic analysis of the lifting system,the elastic catenary mod-el considering the elasticity and mass of the flexible rope is established,and the effect of the deform-ation of the flexible rope on the position and posture of the suspended object is analyzed.According to the deformation of flexible rope,a real-time trajectory compensation method is proposed based on the compensation principle of position and posture.Under the lifting task of the low-speed move-ment,this is compared with that of the system which neglects the deformation of the flexible rope.The trajectoy of the lifting system considering the deformation of flexible rope.The results show that the mass and elasticity of the flexible rope can not be neglected.Meanwhile,the proposed trajectory compensation method can improve the movement accuracy of the lifting system,which verifies the ef-fectiveness of this compensation method.The research results provide the basis for trajectory plan-ning and coordinated control of the lifting system。
文摘With the arrival of the big data era, the modern higher education model has undergone radical changes, and higher requirements have been put forward for the data literacy of college teachers. The paper first analyzes the connotation of teacher data literacy, and then combs through the status quo and dilemmas of teachers’ data literacy ability in applied universities. The paper proposes to enhance the data literacy ability of teachers from the perspective of organizational learning. Through building a digital culture, building a data-driven teaching environment, and constructing an interdisciplinary learning community to further promote the application of the theory and practice of datafication inside and outside the organization, and ultimately improve the quality of teaching.
基金The National Natural Science Foundation of China(No.51308105)
文摘A newnumerical method based on vector form intrinsic finite element(VFIFE) is proposed to simulate the integral lifting process of steel structures. First, in order to verify the validity of the VFIFE method, taking the steel gallery between the integrated building and the attached building of Nanjing M obile Communication Buildings for example, the static analysis was carried out and the corresponding results were compared with the results achieved by the traditional finite element method. Then, according to the characteristics of dynamic construction of steel structure integral lifting, the tension cable element was employed to simulate the behavior of dynamic construction. The VFIFE method avoids the iterative solution of the stiffness matrix and the singularity problems. Therefore, it is simple to simulate the complete process of steel structure lifting construction.Finally, by using the VFIFE, the displacement and internal force time history curves of the steel structures under different lifting speeds are obtained. The results show that the lifting speed has influence on the lifting force, the internal force, and the displacement of the structure. In the case of normal lifting speed, the dynamic magnification factor of 1. 5 is safe and reasonable for practical application.
文摘This paper discusses the signal decomposition method using the extreme-lifting scheme and two two-dimensional decomposition schemes: separable one-dimensional scheme and two-dimensional scheme with quincunx sampling. The structure of the relation "~" between Ex and Ey of these two schemes is symmetrical and both these two schemes have shortcomings)An unsymmetrical scheme of the extreme-lifting scheme is proposed in this paper, which canbe directly used to decompose two-dimensional image and can get better decomposition result than the two schemes with little computation cost.
基金National Science and Technology Support Program of China(No.2006BAG04B0)
文摘Sutong Bridge is a cable-stayed bridge with a steel box girder and a main span of 1 088 m.The steel box girder of main span includes five portions:back span large unit,large block of pylon,standard girder,back span closure girder and middle span closure girder.Each back span large unit is fabricated by welding several deck segments together in factory,and is erected by floating crane.As navigational clearance of the main bridge is high,the traditional truss lifting device can't satisfy the requirement of domestic lifting cranes for this kind of lifting height and weight.Hence,a kind of lighter lifting device for the erection of back span large units was accepted for this bridge.In this paper,the design and use of this lifting device is introduced.The upper structure used lifting gantry to install the standard girder segment by cantilever method.Because the bridge's navigation clearance is high,and the girder segment is wide and heavy,the meteorology and hydrology condition of the bridge district is abominable,and the requirements of long cable girder side pull-in,structure and performance propose high request to the lifting gantry.In this paper,the design and use key point of long cable pull-in angle adjustment device integrate into lifting gantry is introduced.
基金The National Key Technology R&D Program of China during the 12th Five-Year Plan Period(No.2012BAH15B00)
文摘Quasi-cyclic low-density parity-check (QC-LDPC) codes can be constructed conveniently by cyclic lifting of protographs. For the purpose of eliminating short cycles in the Tanner graph to guarantee performance, first an algorithm to enumerate the harmful short cycles in the protograph is designed, and then a greedy algorithm is proposed to assign proper permutation shifts to the circulant permutation submatrices in the parity check matrix after lifting. Compared with the existing deterministic edge swapping (DES) algorithms, the proposed greedy algorithm adds more constraints in the assignment of permutation shifts to improve performance. Simulation results verify that it outperforms DES in reducing short cycles. In addition, it is proved that the parity check matrices of the cyclic lifted QC-LDPC codes can be transformed into block lower triangular ones when the lifting factor is a power of 2. Utilizing this property, the QC- LDPC codes can be encoded by preprocessing the base matrices, which reduces the encoding complexity to a large extent.
基金Supported by National Natural Science Foundation of China(51705431,51375078)Natural Sciences and Engineering Research Council of Canada(RGPIN-2015-04897)
文摘The current morphological wavelet technologies utilize a fixed filter or a linear decomposition algorithm, which cannot cope with the sudden changes, such as impulses or edges in a signal effectively. This paper pre- sents a novel signal processing scheme, adaptive morpho- logical update lifting wavelet (AMULW), for rolling element bearing fault detection. In contrast with the widely used morphological wavelet, the filters in AMULW are no longer fixed. Instead, the AMULW adaptively uses a morphological dilation-erosion filter or an average filter as the update lifting filter to modify the approximation signal. Moreover, the nonlinear morphological filter is utilized to substitute the traditional linear filter in AMULW. The effectiveness of the proposed AMULW is evaluated using a simulated vibration signal and experimental vibration sig- nals collected from a bearing test rig. Results show that the proposed method has a superior performance in extracting fault features of defective roiling element bearings.
基金Projects(51174037,51339008)supported by the National Natural Science Foundation of China
文摘In order to investigate the characteristics of particle-induced pressure loss in the solid–liquid lifting pipe,a series of experiments were conducted in 200 mm diameter lifting pipe.Simulation manganese nodules with five different mean diameters of10 mm,20 mm,30 mm,40 mm and 50 mm were used,both in isolation and a combination in equal fraction by mass.The flow velocities in the lifting pipe ranged from 0.12 m/s to 1.61 m/s,and the mass of particles employed was 10 kg for each particle diameter.Three regimes,wavy bed,partly fluidization,and fully fluidization,were observed over the flow velocity.The solid–liquid pressure drop data were measured by differential pressure transmitter,and pressure drop caused by the solid particles was calculated and analyzed.The results show that the evolutions of the pressure loss due to solid particles are relevant to the solid–liquid flow regimes,and they are distinctly influenced by fluid velocity and particle size.
基金supported by a grant from the Beijing Municipal Science&Technology Commission(No.Z141107002514121)
文摘Giant hiatal hernia(GHH) comprises 5% of hiatal hernia and is associated with significant complications.The traditional operative procedure,no matter transthoracic or transabdomen repair of giant hiatal hernia,is characteristic of more invasion and more complications.Although laparoscopic repair as a minimally invasive surgery is accepted,a part of patients can not tolerate pneumoperitoneum because of combination with cardiopulmonary diseases or severe posterior mediastinal and neck emphesema during operation.The aim of this article was to analyze our experience in gasless laparoscopic repair with abdominal wall lifting to treat the giant hiatal hernia.We performed a retrospective review of patients undergoing gasless laparoscopic repair of GHH with abdominal wall lifting from 2012 to 2015 at our institution.The GHH was defined as greater than one-third of the stomach in the chest.Gasless laparoscopic repair of GHH with abdominal wall lifting was attempted in 27 patients.Mean age was 67 years.The results showed that there were no conversions to open surgery and no intraoperative deaths.The mean duration of operation was 100 min(range:90–130 min).One-side pleura was injured in 4 cases(14.8%).The mean postoperative length of stay was 4 days(range:3–7 days).Median follow-up was 26 months(range:6–38 months).Transient dysphagia for solid food occurred in three patients(11.1%),and this symptom disappeared within three months.There was one patient with recurrent hiatal hernia who was reoperated on.Two patients still complained of heartburn three months after surgery.Neither reoperation nor endoscopic treatment due to signs of postoperative esophageal stenosis was required in any patient.Totally,satisfactory outcome was reported in 88.9% patients.It was concluded that the gasless laparoscopic approach with abdominal wall lifting to the repair of GHH is feasible,safe,and effective for the patients who cannot tolerate the pneumoperitoneum.