In this paper, a strategy for the reactive power compensation and harmonic suppression of the power supply system in HT-7U superconductive Tokamak is proposed. The optimized approach is given in the parameters design...In this paper, a strategy for the reactive power compensation and harmonic suppression of the power supply system in HT-7U superconductive Tokamak is proposed. The optimized approach is given in the parameters design for passive filter. Also a controlling method with fast response time and good accuracy is put forward for the compensator, which is more suitable for the dynamic load.展开更多
To ensure frequency stability in power systems with high wind penetration,the doubly-fed induction generator(DFIG)is often used with the frequency fast response control(FFRC)to participate in frequency response.Howeve...To ensure frequency stability in power systems with high wind penetration,the doubly-fed induction generator(DFIG)is often used with the frequency fast response control(FFRC)to participate in frequency response.However,a certain output power suppression amount(OPSA)is generated during frequency support,resulting in the frequency modulation(FM)capability of DFIG not being fully utilised,and the system’s unbalanced power will be increased during speed recovery,resulting in a second frequency drop(SFD)in the system.Firstly,the frequency response characteristics of the power system with DFIG containing FFRC are analysed.Then,based on the analysis of the generation mechanism of OPSA and SFD,a combined wind-storage FM control strategy is proposed to improve the system’s frequency response characteristics.This strategy reduces the effect of OPSA and improves the FM capability of DFIG by designing the fuzzy logic of the coefficients of FFRC according to the system frequency index in the frequency support stage.During the speed recovery stage,the energy storage(ES)active power reference value is calculated according to the change of DFIG rotor speed,and the ES output power is dynamically adjusted to reduce the SFD.Finally,taking the IEEE 39-bus test system as an example,real-time digital simulation verification was conducted based on the RTLAB OP5707 simulation platform.The simulation results showthat theproposedmethodcan improve theFMcapabilityofDFIG,reduce the SFDunder thepremise of guaranteeing the rapid rotor speed recovery,and avoid the overshooting phenomenon so that the systemfrequency can be quickly restored to a stable state.展开更多
Terahertz(THz)wireless communication has the capability to connect massive devices using its ultra-large spectrum resource.We propose a hybrid precoding scheme for the cluster-based multi-carrier beam division multipl...Terahertz(THz)wireless communication has the capability to connect massive devices using its ultra-large spectrum resource.We propose a hybrid precoding scheme for the cluster-based multi-carrier beam division multiple access(MC-BDMA)to enable THz massive connections.Both the inter-beam interference and inter-band power leakage in this system are considered.A mathematical model is established to analyze and reduce their effects on the THz signal transmission.By considering the peculiarities of THz channels and characteristics of THz hardware components,we further propose a three-step hybrid precoding algorithm with low complexity,where the received signal power enhancement,the inter-beam interference elimination,and the inter-band power leakage suppression are conducted in succession.Simulation results are presented to demonstrate the high spectrum efficiency and high energy efficiency of our proposed algorithm,especially in the massive-connection scenarios.展开更多
文摘In this paper, a strategy for the reactive power compensation and harmonic suppression of the power supply system in HT-7U superconductive Tokamak is proposed. The optimized approach is given in the parameters design for passive filter. Also a controlling method with fast response time and good accuracy is put forward for the compensator, which is more suitable for the dynamic load.
基金funded by Jilin Province Science and Technology Development Plan Projects(20230508157RC)the National Natural Science Foundation of China(U2066208).
文摘To ensure frequency stability in power systems with high wind penetration,the doubly-fed induction generator(DFIG)is often used with the frequency fast response control(FFRC)to participate in frequency response.However,a certain output power suppression amount(OPSA)is generated during frequency support,resulting in the frequency modulation(FM)capability of DFIG not being fully utilised,and the system’s unbalanced power will be increased during speed recovery,resulting in a second frequency drop(SFD)in the system.Firstly,the frequency response characteristics of the power system with DFIG containing FFRC are analysed.Then,based on the analysis of the generation mechanism of OPSA and SFD,a combined wind-storage FM control strategy is proposed to improve the system’s frequency response characteristics.This strategy reduces the effect of OPSA and improves the FM capability of DFIG by designing the fuzzy logic of the coefficients of FFRC according to the system frequency index in the frequency support stage.During the speed recovery stage,the energy storage(ES)active power reference value is calculated according to the change of DFIG rotor speed,and the ES output power is dynamically adjusted to reduce the SFD.Finally,taking the IEEE 39-bus test system as an example,real-time digital simulation verification was conducted based on the RTLAB OP5707 simulation platform.The simulation results showthat theproposedmethodcan improve theFMcapabilityofDFIG,reduce the SFDunder thepremise of guaranteeing the rapid rotor speed recovery,and avoid the overshooting phenomenon so that the systemfrequency can be quickly restored to a stable state.
基金the National Natural Science Foundation of China under Grant No.61771054.
文摘Terahertz(THz)wireless communication has the capability to connect massive devices using its ultra-large spectrum resource.We propose a hybrid precoding scheme for the cluster-based multi-carrier beam division multiple access(MC-BDMA)to enable THz massive connections.Both the inter-beam interference and inter-band power leakage in this system are considered.A mathematical model is established to analyze and reduce their effects on the THz signal transmission.By considering the peculiarities of THz channels and characteristics of THz hardware components,we further propose a three-step hybrid precoding algorithm with low complexity,where the received signal power enhancement,the inter-beam interference elimination,and the inter-band power leakage suppression are conducted in succession.Simulation results are presented to demonstrate the high spectrum efficiency and high energy efficiency of our proposed algorithm,especially in the massive-connection scenarios.