This paper represents a case study of traffic congestion within a section on Al Seeb Street highway due to the on-ramp merging of vehicles that causes a bottleneck in the mainline road. It studies the efficiency of in...This paper represents a case study of traffic congestion within a section on Al Seeb Street highway due to the on-ramp merging of vehicles that causes a bottleneck in the mainline road. It studies the efficiency of installing ramp metering within a ramp within the selected study zone. This is done by simulating the collected data using Vissim software by drawing three one-hour-long scenarios;the first scenario reflects the data collected for 30 minutes duration and is used as a base scenario to draw the other two scenarios, which are reflected as factored-up scenarios to create a situation observed in the early morning in the study zone at 6:00-7:00 in which slowing down of speeds exist, and breakdown is raised in working days. The two factoring-up scenarios were as follows: one without ramp metering and the other without ramp metering. Each scenario was calibrated and run five times with random seeds, and then the average was considered. The simulation examines the ability of RM to smooth traffic in mainline and reduce queuing on on-ramp roads within the selected study zone by comparing the performance of the network for the scenarios and comparing them in terms of the overall delays, number of stops and the average speeds for the vehicles within the mainline. The results showed a good performance reflected by the scenario with ramp metering with a reduction of the overall delay, a decrease in stops number and an increase of the average speed were achieved. For the base scenario, a visualization (video extracted from Vissim software) was extracted, showing no need to install RM with an associated table showing a number of stops equal to zero with an average speed of 102.74 km/h and a total delay of 6045 seconds. For the second scenario with no RM, a visualization was extracted showing a slowing down of speeds for vehicles within the mainline while vehicles merging from the on-ramp and need to be controlled with a table showing a number of stops equal to 16 and an average speed equal to 58 km/h and a total delay of 916,874 seconds. For the third scenario with RM, a visualization was extracted showing good control of the second scenario with a table showing the number of stops equal to 6, an average speed equal to 61 km/h and a total delay equal to 484,466 seconds. Ten literatures in regard to this study have been reviewed. The data collected are quantitative, which are collected using an indirect manual counting method and then the data is used to feed the software for simulation.展开更多
Ensuring adequate access to truck parking is critical to the safe and efficient movement of freight traffic. There are strict federal guidelines for commercial truck driver rest periods. Rest areas and private truck s...Ensuring adequate access to truck parking is critical to the safe and efficient movement of freight traffic. There are strict federal guidelines for commercial truck driver rest periods. Rest areas and private truck stops are the only places for the trucks to stop legally and safely. In locations without sufficient parking areas, trucks often park on interstate ramps, which create safety risks for other interstate motorists. Historically, agencies have employed costly and time intensive manual counting methods, camera surveillance, and driver surveys to assess truck parking. Connected truck data, available in near real-time, offers an efficient alternative to practitioners to assess truck parking patterns and identify areas where there may be insufficient safe parking spaces. This paper presents a case study of interstate I-70 in east central Indiana and documents the observed spatiotemporal impacts of a rest area closure on truck parking on nearby interstate ramps. Results showed that there was a 28% increase in parking on ramps during the rest area closure. Analysis also found that ramps closest to the rest area were most impacted by the closure, seeing a rise in truck parking sessions as high as 2.7 times. Parking duration on the ramps during rest area closure also increased drastically. Although it was expected that this would result in increased parking by trucks on adjacent ramps, this before, during, after scenario provided an ideal scenario to evaluate the robustness of these techniques to assess changing parking characteristics of long-haul commercial trucks. The data analytics and visualization tools presented in this study are scalable nationwide and will aid stakeholders in informed data-driven decision making when allocating resources towards improving the nations commercial vehicle parking infrastructure.展开更多
This paper analyzes the structural design of an urban interchange ramp bridge from four aspects,which are the superstructure,pier structure,foundation structure,and deck structure design to summarize the structural de...This paper analyzes the structural design of an urban interchange ramp bridge from four aspects,which are the superstructure,pier structure,foundation structure,and deck structure design to summarize the structural design ideas of this urban interchange ramp bridge,which can be used as a reference for future construction of the same bridge.展开更多
This article explores the fundamentals of small-radius curved ramp bridges.It covers the selection of box girder spans,support methods,and forms,along with design optimization techniques for this type of bridge struct...This article explores the fundamentals of small-radius curved ramp bridges.It covers the selection of box girder spans,support methods,and forms,along with design optimization techniques for this type of bridge structure.The purpose of this paper is to provide robust support for enhancing the design quality of these bridges and ensuring their efficacy in real-world applications.展开更多
A robust stratigraphic framework and a coherent depositional ramp model for the Zitai,Dawan,Meitan and Ningkuo formations of Floian–Darriwilian age(Early–Middle Ordovician)in the Yangtze(Daoba,Xiangshuidong,Daling,G...A robust stratigraphic framework and a coherent depositional ramp model for the Zitai,Dawan,Meitan and Ningkuo formations of Floian–Darriwilian age(Early–Middle Ordovician)in the Yangtze(Daoba,Xiangshuidong,Daling,Gudongkou and Honghuayuan sections)and Jiangnan regions(Nanba section)was created based on lithofacies and major element analysis.Three siliciclastic(LF1–3)and six carbonate(LF4–9)lithofacies are recognized representing sediments that were deposited in mixed siliciclastic and carbonate ramp environment.The intensity of mixed sedimentation and terrigenous input were evaluated using the elemental proxies Intensity of Mixed sedimentation(IM)and Aluminum Accumulation Rate(Al AR),as well as their mean values during certain time intervals.Mixed sediments are most well-developed along the marginal Yangtze region,strongly impacted by recurrent influx of westerly derived terrigenous materials in response to global eustatic changes and regional tectonic movements,shaping the gently southeast-dipping morphology.Regular terrigenous influx resulted in periods of enhanced primary productivity on the Yangtze Ramp as evidenced by matching biodiversity peaks in planktonic organisms,i.e.,chitinozoans and acritarchs.Brachiopods and other shelly fauna were also able to proliferate as new niches developed along the gently dipping ramp floor with substrate changes.The biodiversification patterns suggest that terrigenous influx controlled in part by regional tectonics played a more important role than previously thought in the development of Great Ordovician Biodiversification Event in South China.展开更多
The rapid advancement of urban transportation in modern China has driven urban economic developments.However,the progressively congested traffic conditions have affected the productivity and daily life of the people.T...The rapid advancement of urban transportation in modern China has driven urban economic developments.However,the progressively congested traffic conditions have affected the productivity and daily life of the people.To mitigate the congestion problem,necessary road designs should be implemented along the highways,for example highway interchanges.The application of highway interchanges in past cases have proven to effectively avoid traffic flow conflicts,reduce highway traffic congestion,and reduce traffic accidents,this is conducive to ensuring the safety and efficiency of the highway.In order to improve the safety and convenience of urban road traffic,this paper analyzes the strategy of using interchange ramp route designs for highway traffic.展开更多
文摘This paper represents a case study of traffic congestion within a section on Al Seeb Street highway due to the on-ramp merging of vehicles that causes a bottleneck in the mainline road. It studies the efficiency of installing ramp metering within a ramp within the selected study zone. This is done by simulating the collected data using Vissim software by drawing three one-hour-long scenarios;the first scenario reflects the data collected for 30 minutes duration and is used as a base scenario to draw the other two scenarios, which are reflected as factored-up scenarios to create a situation observed in the early morning in the study zone at 6:00-7:00 in which slowing down of speeds exist, and breakdown is raised in working days. The two factoring-up scenarios were as follows: one without ramp metering and the other without ramp metering. Each scenario was calibrated and run five times with random seeds, and then the average was considered. The simulation examines the ability of RM to smooth traffic in mainline and reduce queuing on on-ramp roads within the selected study zone by comparing the performance of the network for the scenarios and comparing them in terms of the overall delays, number of stops and the average speeds for the vehicles within the mainline. The results showed a good performance reflected by the scenario with ramp metering with a reduction of the overall delay, a decrease in stops number and an increase of the average speed were achieved. For the base scenario, a visualization (video extracted from Vissim software) was extracted, showing no need to install RM with an associated table showing a number of stops equal to zero with an average speed of 102.74 km/h and a total delay of 6045 seconds. For the second scenario with no RM, a visualization was extracted showing a slowing down of speeds for vehicles within the mainline while vehicles merging from the on-ramp and need to be controlled with a table showing a number of stops equal to 16 and an average speed equal to 58 km/h and a total delay of 916,874 seconds. For the third scenario with RM, a visualization was extracted showing good control of the second scenario with a table showing the number of stops equal to 6, an average speed equal to 61 km/h and a total delay equal to 484,466 seconds. Ten literatures in regard to this study have been reviewed. The data collected are quantitative, which are collected using an indirect manual counting method and then the data is used to feed the software for simulation.
文摘Ensuring adequate access to truck parking is critical to the safe and efficient movement of freight traffic. There are strict federal guidelines for commercial truck driver rest periods. Rest areas and private truck stops are the only places for the trucks to stop legally and safely. In locations without sufficient parking areas, trucks often park on interstate ramps, which create safety risks for other interstate motorists. Historically, agencies have employed costly and time intensive manual counting methods, camera surveillance, and driver surveys to assess truck parking. Connected truck data, available in near real-time, offers an efficient alternative to practitioners to assess truck parking patterns and identify areas where there may be insufficient safe parking spaces. This paper presents a case study of interstate I-70 in east central Indiana and documents the observed spatiotemporal impacts of a rest area closure on truck parking on nearby interstate ramps. Results showed that there was a 28% increase in parking on ramps during the rest area closure. Analysis also found that ramps closest to the rest area were most impacted by the closure, seeing a rise in truck parking sessions as high as 2.7 times. Parking duration on the ramps during rest area closure also increased drastically. Although it was expected that this would result in increased parking by trucks on adjacent ramps, this before, during, after scenario provided an ideal scenario to evaluate the robustness of these techniques to assess changing parking characteristics of long-haul commercial trucks. The data analytics and visualization tools presented in this study are scalable nationwide and will aid stakeholders in informed data-driven decision making when allocating resources towards improving the nations commercial vehicle parking infrastructure.
文摘This paper analyzes the structural design of an urban interchange ramp bridge from four aspects,which are the superstructure,pier structure,foundation structure,and deck structure design to summarize the structural design ideas of this urban interchange ramp bridge,which can be used as a reference for future construction of the same bridge.
文摘This article explores the fundamentals of small-radius curved ramp bridges.It covers the selection of box girder spans,support methods,and forms,along with design optimization techniques for this type of bridge structure.The purpose of this paper is to provide robust support for enhancing the design quality of these bridges and ensuring their efficacy in real-world applications.
基金funded by National Natural Science Foundation of China(Grant Nos.42102130,41972011)Natural Science Foundation of Jiangsu Province(Grant No.BK20191101)+2 种基金Chinese Academy of Sciences(Grant No.XDB26000000)China Scholarship Council(Grant No.202004910207)State Key Laboratory of Palaeobiology and Stratigraphy。
文摘A robust stratigraphic framework and a coherent depositional ramp model for the Zitai,Dawan,Meitan and Ningkuo formations of Floian–Darriwilian age(Early–Middle Ordovician)in the Yangtze(Daoba,Xiangshuidong,Daling,Gudongkou and Honghuayuan sections)and Jiangnan regions(Nanba section)was created based on lithofacies and major element analysis.Three siliciclastic(LF1–3)and six carbonate(LF4–9)lithofacies are recognized representing sediments that were deposited in mixed siliciclastic and carbonate ramp environment.The intensity of mixed sedimentation and terrigenous input were evaluated using the elemental proxies Intensity of Mixed sedimentation(IM)and Aluminum Accumulation Rate(Al AR),as well as their mean values during certain time intervals.Mixed sediments are most well-developed along the marginal Yangtze region,strongly impacted by recurrent influx of westerly derived terrigenous materials in response to global eustatic changes and regional tectonic movements,shaping the gently southeast-dipping morphology.Regular terrigenous influx resulted in periods of enhanced primary productivity on the Yangtze Ramp as evidenced by matching biodiversity peaks in planktonic organisms,i.e.,chitinozoans and acritarchs.Brachiopods and other shelly fauna were also able to proliferate as new niches developed along the gently dipping ramp floor with substrate changes.The biodiversification patterns suggest that terrigenous influx controlled in part by regional tectonics played a more important role than previously thought in the development of Great Ordovician Biodiversification Event in South China.
文摘The rapid advancement of urban transportation in modern China has driven urban economic developments.However,the progressively congested traffic conditions have affected the productivity and daily life of the people.To mitigate the congestion problem,necessary road designs should be implemented along the highways,for example highway interchanges.The application of highway interchanges in past cases have proven to effectively avoid traffic flow conflicts,reduce highway traffic congestion,and reduce traffic accidents,this is conducive to ensuring the safety and efficiency of the highway.In order to improve the safety and convenience of urban road traffic,this paper analyzes the strategy of using interchange ramp route designs for highway traffic.