期刊文献+
共找到4,639篇文章
< 1 2 232 >
每页显示 20 50 100
EXPECTED DISCOUNTED PENALTY FUNCTION AT RUIN FOR RISK PROCESS PERTURBED BY DIFFUSION UNDER INTEREST FORCE 被引量:1
1
作者 Zhao Xia Ouyang Zisheng 《Applied Mathematics(A Journal of Chinese Universities)》 SCIE CSCD 2005年第3期289-296,共8页
In this article, the risk process perturbed by diffusion under interest force is considered, the continuity and twice continuous differentiability for Фδ(u,w) are discussed,the Feller expression and the integro-di... In this article, the risk process perturbed by diffusion under interest force is considered, the continuity and twice continuous differentiability for Фδ(u,w) are discussed,the Feller expression and the integro-differential equation satisfied by Фδ (u ,w) are derived. Finally, the decomposition of Фδ(u,w) is discussed, and some properties of each decomposed part of Фδ(u,w) are obtained. The results can be reduced to some ones in Gerber and Landry's,Tsai and Willmot's, and Wang's works by letting parameter δ and (or) a be zero. 展开更多
关键词 risk process perturbed by diffusion under interest force expected discounted penalty at ruin twice continuous differentiability integro-differential equation.
下载PDF
THE JOINT DISTRIBUTIONS OF SOME ACTUARIAL DIAGNOSTICS FOR THE JUMP-DIFFUSION RISK PROCESS
2
作者 吕玉华 吴荣 徐润 《Acta Mathematica Scientia》 SCIE CSCD 2010年第3期664-676,共13页
In this article, the joint distributions of several actuarial diagnostics which are important to insurers' running for the jump-diffusion risk process are examined. They include the ruin time, the time of the surplus... In this article, the joint distributions of several actuarial diagnostics which are important to insurers' running for the jump-diffusion risk process are examined. They include the ruin time, the time of the surplus process leaving zero ultimately (simply, the ultimately leaving-time), the surplus immediately prior to ruin, the supreme profits before ruin, the supreme profits and deficit until it leaves zero ultimately and so on. The explicit expressions for their distributions are obtained mainly by the various properties of Levy process, such as the homogeneous strong Markov property and the spatial homogeneity property etc, moveover, the many properties for Brownian motion. 展开更多
关键词 Jump-diffusion risk process Brownian motion time of ruin ultimately leaving-time homogeneous strong Markov property
下载PDF
Markovian risk process
3
作者 王汉兴 颜云志 +1 位作者 赵飞 方大凡 《Applied Mathematics and Mechanics(English Edition)》 SCIE EI 2007年第7期955-962,共8页
A Markovian risk process is considered in this paper, which is the generalization of the classical risk model. It is proper that a risk process with large claims is modelled as the Markovian risk model. In such a mode... A Markovian risk process is considered in this paper, which is the generalization of the classical risk model. It is proper that a risk process with large claims is modelled as the Markovian risk model. In such a model, the occurrence of claims is described by a point process {N(t)}t≥0 with N(t) being the number of jumps during the interval (0, t] for a Markov jump process. The ruin probability ψ(u) of a company facing such a risk model is mainly studied. An integral equation satisfied by the ruin probability function ψ(u) is obtained and the bounds for the convergence rate of the ruin probability ψ(u) are given by using a generalized renewal technique developed in the paper. 展开更多
关键词 risk process ruin probability Markov jump process
下载PDF
Integro-Differential Equations for a Jump-Diffusion Risk Process with Dependence between Claim Sizes and Claim Intervals
4
作者 Heli Gao 《Journal of Applied Mathematics and Physics》 2016年第11期2061-2068,共8页
The classical Poisson risk model in ruin theory assumed that the interarrival times between two successive claims are mutually independent, and the claim sizes and claim intervals are also mutually independent. In thi... The classical Poisson risk model in ruin theory assumed that the interarrival times between two successive claims are mutually independent, and the claim sizes and claim intervals are also mutually independent. In this paper, we modify the classical Poisson risk model to describe the surplus process of an insurance portfolio. We consider a jump-diffusion risk process compounded by a geometric Brownian motion, and assume that the claim sizes and claim intervals are dependent. Using the properties of conditional expectation, we establish integro-differential equations for the Gerber-Shiu function and the ultimate ruin probability. 展开更多
关键词 Jump-Diffusion risk process Diffusion Geometric Brownian Motion Gerber-Shiu Function
下载PDF
Mapping Climate Services for Disaster Risk Management: A Systematic Review and Research Gaps from a Policy Process Perspective
5
作者 Aboubacar Issaka Ousman Gaoh Wolfram Laube +1 位作者 Georges Abbevi Abbey Moussa Waongo 《American Journal of Climate Change》 2024年第2期314-360,共47页
Climate services (CS) are crucial for mitigating and managing the impacts and risks associated with climate-induced disasters. While evidence over the past decade underscores their effectiveness across various domains... Climate services (CS) are crucial for mitigating and managing the impacts and risks associated with climate-induced disasters. While evidence over the past decade underscores their effectiveness across various domains, particularly agriculture, to maximize their potential, it is crucial to identify emerging priority areas and existing research gaps for future research agendas. As a contribution to this effort, this paper employs the Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) methodology to review the state-of-the-art in the field of climate services for disaster risk management. A comprehensive search across five literature databases combined with a snowball search method using ResearchRabbit was conducted and yielded 242 peer-reviewed articles, book sections, and reports over 2013-2023 after the screening process. The analysis revealed flood, drought, and food insecurity as major climate-related disasters addressed in the reviewed literature. Major climate services addressed included early warning systems, (sub)seasonal forecasts and impact-based warnings. Grounded in the policy processes’ theoretical perspective, the main focus identified and discussed three prevailing policy-oriented priority areas: 1) development of climate services, 2) use-adoption-uptake, and 3) evaluation of climate services. In response to the limitations of the prevalent supply-driven and top-down approach to climate services promotion, co-production emerges as a cross-cutting critical aspect of the identified priority areas. Despite the extensive research in the field, more attention is needed, particularly pronounced in the science-policy interface perspective, which in practice bridges scientific knowledge and policy decisions for effective policy processes. This perspective offers a valuable analytical lens as an entry point for further investigation. Hence, future research agendas would generate insightful evidence by scrutinizing this critical aspect given its importance to institutions and climate services capacity, to better understand intricate facets of the development and the integration of climate services into disaster risk management. 展开更多
关键词 Climate Services Disaster risk Management Policy process Science-Policy Interface Institutional Analysis
下载PDF
RUIN PROBLEM FOR A CLASS OF RISK PROCESSES PERTURBED BY DIFFUSION 被引量:7
6
作者 SiJiandong WangZhenyu WangGuojing 《Applied Mathematics(A Journal of Chinese Universities)》 SCIE CSCD 2002年第4期435-441,共7页
In this paper,a class of risk processes perturbed by diffusion are considered. The Lundberg inequalities for the ruin probability are obtained.The size of the Lundberg exponents for different kinds of risk model is co... In this paper,a class of risk processes perturbed by diffusion are considered. The Lundberg inequalities for the ruin probability are obtained.The size of the Lundberg exponents for different kinds of risk model is compared. The numerical illustration for the impact of the parameters on the ruin probability is given. 展开更多
关键词 risk process ruin probability Lundberg inequality Lundberg exponent Brownian motion Poisson process.
下载PDF
Ruin Theory for the Risk Process Described by PDMPs 被引量:2
7
作者 Guo-jingWang Chun-shengZhang RongWu 《Acta Mathematicae Applicatae Sinica》 SCIE CSCD 2003年第1期59-70,共12页
Abstract In this paper we consider the risk process that is described by a piecewise deterministic Markov processes (PDMP). We first present the construction of the risk process and then discuss some ruin problems for... Abstract In this paper we consider the risk process that is described by a piecewise deterministic Markov processes (PDMP). We first present the construction of the risk process and then discuss some ruin problems for this new kind of risk model. 展开更多
关键词 Keywords risk process survivor function ruins probability integro-differential equation supremum distribution bevor ruin
原文传递
A Class of Delayed Renewal Risk Processes with a Threshold Dividend Strategy 被引量:1
8
作者 Wu-yuan Jiang Zai-ming Liu 《Acta Mathematicae Applicatae Sinica》 SCIE CSCD 2010年第2期345-352,共8页
This paper considers a class of delayed renewal risk processes with a threshold dividend strategy. The main result is an expression of the Gerber-Shiu expected discounted penalty function in the delayed renewal risk m... This paper considers a class of delayed renewal risk processes with a threshold dividend strategy. The main result is an expression of the Gerber-Shiu expected discounted penalty function in the delayed renewal risk model in terms of the corresponding Cerber-Shiu function in the ordinary renewal model. Subsequently, this relationship is considered in more detail in both the stationary renewal risk model and the ruin probability. 展开更多
关键词 Delayed renewal risk process Gerber-Shiu discounted penalty function Threshold dividend strategy Ruin probability Ordinary renewal risk model
原文传递
Asymptotic Behavior of Generalized Risk Processes 被引量:1
9
作者 V.E.BENING V.Yu.KOROLEV LiXinLIU 《Acta Mathematica Sinica,English Series》 SCIE CSCD 2004年第2期349-356,共8页
In this paper,the asymptotic behavior of generalized risk processes without any momentassumptions on the controlling process is described.
关键词 risk process Cox process Weak convergence
原文传递
Ruin probability for correlated negative risk sums model with Erlang processes 被引量:1
10
作者 DONG Ying-hui 《Applied Mathematics(A Journal of Chinese Universities)》 SCIE CSCD 2009年第1期14-20,共7页
This paper studies a Sparre Andersen negative risk sums model in which the distribution of "interclaim" time is that of a sum of n independent exponential random variables. Thus, the Erlang(n) model is a special c... This paper studies a Sparre Andersen negative risk sums model in which the distribution of "interclaim" time is that of a sum of n independent exponential random variables. Thus, the Erlang(n) model is a special case. On this basis the correlated negative risk sums process with the common Erlang process is considered. Integro-differential equations with boundary conditions for ψ(u) are given. For some special cases a closed-form expression for ψ(u) is derived. 展开更多
关键词 ruin probability Erlang process correlated negative risk sums process equation
下载PDF
Eurozation: Process and Risks
11
作者 Sun Xiaoqing Sun Xiaoqing is Associate Research Professor at Division for European Studies, China Institute of Contemporary International Relations. 《Contemporary International Relations》 2001年第12期14-31,共18页
The European Monetary Union (EMU) appeared unprecedentedly on the world scene as 12 European countries voluntarily gave up part of their sovereignty to create a regional monetary system. The introduction of euro curre... The European Monetary Union (EMU) appeared unprecedentedly on the world scene as 12 European countries voluntarily gave up part of their sovereignty to create a regional monetary system. The introduction of euro currency is undoubtedly a crucial step toward further European integration. 展开更多
关键词 EMU Eurozation process and risks ECB RATE
下载PDF
Risk Assessment M ode of Sale-Leaseback——Based on Fuzzy Analytic Hierarchy Process 被引量:1
12
作者 陈俊宇 李智 张佳煌 《Journal of Donghua University(English Edition)》 EI CAS 2013年第4期343-348,共6页
Sale-leaseback is paid special focus on for its great application in China in recent years.By giving a detailed analysis,an analysis of the features of sale-leaseback and a study of the risks of it are given in this p... Sale-leaseback is paid special focus on for its great application in China in recent years.By giving a detailed analysis,an analysis of the features of sale-leaseback and a study of the risks of it are given in this paper.Then a quantitative analysis of commercial real estate sale-leaseback is carried out.The scientific theoretical analysis is provided in this paper for risk assessment in commercial real estate sale-leaseback mode in China.An effective approach is put forward for sale-leaseback project evaluation and prevention of risk.A useful means is given to supervise commerciai real estate sale-leaseback mode for relevant departments and a certain contribution is made to a further sound development of commercial real estate sale-leaseback mode. 展开更多
关键词 sale-leaseback fuzzy analytic hierarchy process(FAHP) risk assessment modeCLC number:F830.9Document code:AArticle ID:1672-5220(2013)04-0343-06
下载PDF
Risk Management of Clinical Reference Dosimetry of a Large Hospital Network Using Statistical Process Control 被引量:1
13
作者 Seng-Boh Lim Thomas LoSasso +2 位作者 Maria Chan Laura Cervino Dale Michael Lovelock 《International Journal of Medical Physics, Clinical Engineering and Radiation Oncology》 2021年第3期119-131,共13页
Managing TG-51 reference dosimetry in a large hospital network can be a challenging task. The objectives of this study are to investigate the effectiveness of using Statistical Process Control (SPC) to manage TG-51 wo... Managing TG-51 reference dosimetry in a large hospital network can be a challenging task. The objectives of this study are to investigate the effectiveness of using Statistical Process Control (SPC) to manage TG-51 workflow in such a network. All the sites in the network performed the annual reference dosimetry in water according to TG-51. These data were used to cross-calibrate the same ion chambers in plastic phantoms for monthly QA output measurements. An energy-specific dimensionless beam quality cross-calibration factor, <img src="Edit_6bfb9907-c034-4197-97a7-e8337a7fc21a.png" width="20" height="19" alt="" />, was derived to monitor the process across multiple sites. The SPC analysis was then performed to obtain the mean, <img src="Edit_c630a2dd-f714-4042-a46e-da0ca863cb41.png" width="30" height="20" alt="" /> , standard deviation, <span style="font-size:6.5pt;font-family:;" "=""><span style="white-space:normal;"><span style="font-size:6.5pt;font-family:"">&sigma;</span><span style="white-space:nowrap;"><sub><i>k</i></sub></span></span></span>, the Upper Control Limit (UCL) and Lower Control Limit (LCL) in each beam. This process was first applied to 15 years of historical data at the main campus to assess the effectiveness of the process. A two-year prospective study including all 30 linear accelerators spread over the main campus and seven satellites in the network followed. The ranges of the control limits (±3σ) were found to be in the range of 1.7% - 2.6% and 3.3% - 4.2% for the main campus and the satellite sites respectively. The wider range in the satellite sites was attributed to variations in the workflow. Standardization of workflow was also found to be effective in narrowing the control limits. The SPC is effective in identifying variations in the workflow and was shown to be an effective tool in managing large network reference dosimetry. 展开更多
关键词 TG-51 DOSIMETRY process Control risk Management Large Hospital Network
下载PDF
Applications of Mogulskii, and Kurtz-Feng Large Deviation Results to Risk Reserve Processes with Aggregate Claims
14
作者 Jorge Garcia Ana Meda 《Applied Mathematics》 2012年第12期2109-2117,共9页
In this paper we examine the large deviations principle (LDP) for sequences of classic Cramér-Lundberg risk processes under suitable time and scale modifications, and also for a wide class of claim distributions ... In this paper we examine the large deviations principle (LDP) for sequences of classic Cramér-Lundberg risk processes under suitable time and scale modifications, and also for a wide class of claim distributions including (the non-super- exponential) exponential claims. We prove two large deviations principles: first, we obtain the LDP for risk processes on D∈[0,1] with the Skorohod topology. In this case, we provide an explicit form for the rate function, in which the safety loading condition appears naturally. The second theorem allows us to obtain the LDP for Aggregate Claims processes on D∈[0,∞) with a different time-scale modification. As an application of the first result we estimate the ruin probability, and for the second result we work explicit calculations for the case of exponential claims. 展开更多
关键词 Large Deviations Cramer-Lundberg Reserve risk processES Probability Theory and Mathematical Statistics in INSURANCE Stochastic Models for CLAIM Frequency CLAIM Size and Aggregate CLAIMS RESERVES
下载PDF
Russian and Foreign Experience Review of Territorial Geocryological Hazards Assessment and Risks of Geocryological Processes' Impact
15
作者 J.V.Stanilovskaya 《地学前缘》 EI CAS CSCD 北大核心 2009年第S1期76-76,共1页
Hazards and risks assessment of dangerous geocryological processes is actual problem in connection with climate change.Permafrost is widespread in Russia,Canada,the USA(Alaska), China,Mongolia and in mountain regions.... Hazards and risks assessment of dangerous geocryological processes is actual problem in connection with climate change.Permafrost is widespread in Russia,Canada,the USA(Alaska), China,Mongolia and in mountain regions.Currently there are many papers concerning permafrost-related hazards,but the conceptual and based techniques are not available.Different approaches for solving this problem are considered in the paper.The generally accessible techniques of geocryological processes quantitative risk assessment are not available.The problem lies in uncertainty appearing from 展开更多
关键词 hazards and riskS ASSESSMENT DANGEROUS geocryological processes PERMAFROST
下载PDF
Research on Risk Management of Cross-Sea Bridges Based on Analytic Hierarchy Process—Taking Hangzhou Bay Bridge as an Example
16
作者 Wenxing Zhang 《World Journal of Engineering and Technology》 2021年第3期624-636,共13页
Tod</span><span style="white-space:normal;font-family:"">ay, as the process of urbanization is accelerating, the country </span><span style="white-space:normal;font-family... Tod</span><span style="white-space:normal;font-family:"">ay, as the process of urbanization is accelerating, the country </span><span style="white-space:normal;font-family:"">builds an extensive transportation network through bridges and roads, which facilitates the daily travel of the people and greatly promotes the development of the national economy. However, due to the cross-sea bridge spanning the bay, the overall scale, the complex construction environment, and the high technology </span><span style="white-space:normal;font-family:"">content, the objective existence of risk factors in the construction process ca</span><span style="white-space:normal;font-family:"">n</span><span style="white-space:normal;font-family:"">not be completely avoided. In the construction of cross-sea bridges, once a co</span><span style="white-space:normal;font-family:"">n</span><span style="white-space:normal;font-family:"">struction safety accident occurs, it will cause irreparable losses to the constr</span><span style="white-space:normal;font-family:"">uction of the project. Taking Hangzhou Bay Bridge as an actual case, using the </span><span style="white-space:normal;font-family:"">Analytic Hierarchy Process to identify possible risk factors during the life cy</span><span style="white-space:normal;font-family:"">cle of Hangzhou Bay Bridge, establish a corresponding risk evaluation system to </span><span style="white-space:normal;font-family:"">evaluate the importance and probability of risk, and to rank the importance o</span><span style="white-space:normal;font-family:"">f risks, and control the corresponding construction risks by adopting measures such as risk transfer and risk retention. The research example shows that the project risk of the cross-sea bridge project can be combined with the analytic hierarchy process to identify, analyze and evaluate the importance of the various risks faced by the project, so as to adopt corresponding avoidance methods to reduce the project risk loss and achieve the project construction expectations Target. 展开更多
关键词 Sea Bridge Analytic Hierarchy process risk Management
下载PDF
A Novel Method for Assessing and Optimizing Software Project Process Based Risk Control
17
作者 JIANG Wei-jin XU Yu-sheng XU Yu-hui 《Wuhan University Journal of Natural Sciences》 EI CAS 2006年第1期289-293,共5页
A new approach for assessing and optimizing software project process based on software risk control presented, which evaluates and optimizes software project process from the view of controlling the software project r... A new approach for assessing and optimizing software project process based on software risk control presented, which evaluates and optimizes software project process from the view of controlling the software project risks. A model for optimizing software risk control is given, a discrete optimization algorithm based on dynamic programruing is proposed and an example of using above method to solve a problem is also included in this paper. By improving the old passive post-project control into an active effective preaction, this new method can greatly promote the possibility of success of software projects. 展开更多
关键词 software process project management software risk risk control
下载PDF
Seismic risk evaluation for a planning mountain tunnel using improved analytical hierarchy process based on extension theory 被引量:4
18
作者 XU Jing-song XU Hua +2 位作者 SUN Run-fang ZHAO Xiang-wei CHENG Yin 《Journal of Mountain Science》 SCIE CSCD 2020年第1期244-260,共17页
Seismic risk evaluation(SRE) in early stages(e.g., project planning and preliminary design)for a mountain tunnel located in seismic areas has the same importance as that in final stages(e.g.,performance-based design, ... Seismic risk evaluation(SRE) in early stages(e.g., project planning and preliminary design)for a mountain tunnel located in seismic areas has the same importance as that in final stages(e.g.,performance-based design, structural analysis, and optimization). SRE for planning mountain tunnels bridges the gap between the planning on the macro level and the design/analysis on the micro level regarding the risk management of infrastructural systems. A transition from subjective or qualitative description to objective or quantitative quantification of seismic risk is aimed to improve the seismic behavior of the mountain tunnel and thus reduce the associated seismic risk. A new method of systematic SRE for the planning mountain tunnel was presented herein. The method employs extension theory(ET)and an ET-based improved analytical hierarchy process. Additionally, a new risk-classification criterion is proposed to classify and quantify the seismic risk for a planning mountain tunnel. This SRE method is applied to a mountain tunnel in southwest China, using the extension model based on matter element theory and dependent function operation.The reasonability and flexibility of the SRE method for application to the mountain tunnel are illustrated.According to different seismic risk levels and classification criteria, methods and measures for improving the seismic design are proposed, which can reduce the seismic risk and provide a frame of reference for elaborate seismic design. 展开更多
关键词 Seismic risk evaluation Mountain tunnel Extension theory Analytical hierarchy process Classification criterion
下载PDF
Physicochemical Properties and Health Risks of Informal E-Waste Processing at Alaba International Market in Lagos, Nigeria
19
作者 Adedoyin Olubunmi Bankole Akinyemi Olufemi Ogunkeyede +5 位作者 Judith Ngoli Odionye Benjamin Giwa Oliver Chinonso Mbaoma Bamidele Honesty Akpeji Ekaette Akpan Fadairo Efe Jeffery Isukuru 《Journal of Geoscience and Environment Protection》 2023年第9期176-202,共27页
This study investigated the groundwater quality and health risks associated with informal e-waste processing in the Alaba International Market in Lagos, Nigeria. Twenty-two groundwater samples were collected from hand... This study investigated the groundwater quality and health risks associated with informal e-waste processing in the Alaba International Market in Lagos, Nigeria. Twenty-two groundwater samples were collected from hand-dug wells in the market area and analyzed for physicochemical properties and heavy metal concentrations. The results showed that the groundwater quality was poor, with high levels of heavy metals, including cadmium, lead, and chromium. The health index (HI) for children and adults was above the tolerable threshold levels, indicating a potential health risk to the population. Principal component analysis and hierarchical cluster analysis were used to identify the sources of metals in groundwater, and the results showed that informal e-waste processing was a significant source of contamination. The study highlights the need for effective management strategies to mitigate the potential health risks associated with informal e-waste processing and ensure public health and environmental safety. 展开更多
关键词 Groundwater-Quality Health risks Informal E-Waste processing Alaba International Market NIGERIA
下载PDF
Needs and Challenges of Nigeria Petroleum Industry in Assessing Process Safety Cumulative Risk
20
作者 Emeka Maduabuchi John N. Ugbebor Gogomary Oyet Israel 《Journal of Geoscience and Environment Protection》 2023年第7期192-204,共13页
A cross-sectional exploratory assessment of the needs and challenges of petroleum industry in Nigeria, in assessing process safety cumulative risk for major accidents prevention was investigated. A purposive cum rando... A cross-sectional exploratory assessment of the needs and challenges of petroleum industry in Nigeria, in assessing process safety cumulative risk for major accidents prevention was investigated. A purposive cum random sampling technique was used in this study, among selected petroleum companies operating in Nigeria. Survey questionnaires were received from 216 participants made up of asset integrity engineers/operators, process safety experts, production safety professionals in the petroleum industry in Nigeria. Data analyses were carried out to cover descriptive and inferential statistics. Overall, the study recognized that assessing process safety cumulative risk is not a simple process due largely to the changing nature of safety critical barriers degradation data. The study result showed four main challenges faced by petroleum industries in Nigeria, in assessing process safety cumulative risk: 1) the study showed that 94% of the respondents agreed that there is limited accessibility to safety critical barriers degradation data (little automation). Also 2) 94% of the respondents accounted for poor knowledge of process safety cumulative risk is and agreed it to be of low rating. The result further showed that 3) 90% of the respondents demonstrated that there are no guidance and procedures in assessing process safety cumulative risk and finally 4) 92% of the respondents reported that there is no real-time risk visualization model/ tool. Addressing these issues and challenges by the petroleum industries in the study area, will lead to successful assessment of process safety cumulative risk, thereby reducing the risk of major accidents. 展开更多
关键词 process Safety Cumulative risk Assessment Major Accident Prevention Petroleum Industry
下载PDF
上一页 1 2 232 下一页 到第
使用帮助 返回顶部