期刊文献+
共找到945篇文章
< 1 2 48 >
每页显示 20 50 100
Effects of data smoothing and recurrent neural network(RNN)algorithms for real-time forecasting of tunnel boring machine(TBM)performance
1
作者 Feng Shan Xuzhen He +1 位作者 Danial Jahed Armaghani Daichao Sheng 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第5期1538-1551,共14页
Tunnel boring machines(TBMs)have been widely utilised in tunnel construction due to their high efficiency and reliability.Accurately predicting TBM performance can improve project time management,cost control,and risk... Tunnel boring machines(TBMs)have been widely utilised in tunnel construction due to their high efficiency and reliability.Accurately predicting TBM performance can improve project time management,cost control,and risk management.This study aims to use deep learning to develop real-time models for predicting the penetration rate(PR).The models are built using data from the Changsha metro project,and their performances are evaluated using unseen data from the Zhengzhou Metro project.In one-step forecast,the predicted penetration rate follows the trend of the measured penetration rate in both training and testing.The autoregressive integrated moving average(ARIMA)model is compared with the recurrent neural network(RNN)model.The results show that univariate models,which only consider historical penetration rate itself,perform better than multivariate models that take into account multiple geological and operational parameters(GEO and OP).Next,an RNN variant combining time series of penetration rate with the last-step geological and operational parameters is developed,and it performs better than other models.A sensitivity analysis shows that the penetration rate is the most important parameter,while other parameters have a smaller impact on time series forecasting.It is also found that smoothed data are easier to predict with high accuracy.Nevertheless,over-simplified data can lose real characteristics in time series.In conclusion,the RNN variant can accurately predict the next-step penetration rate,and data smoothing is crucial in time series forecasting.This study provides practical guidance for TBM performance forecasting in practical engineering. 展开更多
关键词 tunnel boring machine(tbm) Penetration rate(PR) Time series forecasting Recurrent neural network(RNN)
下载PDF
Vibrations induced by tunnel boring machine in urban areas: In situ measurements and methodology of analysis 被引量:3
2
作者 Antoine Rallu Nicolas Berthoz +1 位作者 Simon Charlemagne Denis Branque 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2023年第1期130-145,共16页
Excavation with tunnel boring machine(TBM)can generate vibrations,causing damages to neighbouring buildings and disturbing the residents or the equipment.This problem is particularly challenging in urban areas,where T... Excavation with tunnel boring machine(TBM)can generate vibrations,causing damages to neighbouring buildings and disturbing the residents or the equipment.This problem is particularly challenging in urban areas,where TBMs are increasingly large in diameter and shallow in depth.In response to this problem,four experimental campaigns were carried out in different geotechnical contexts in France.The vibration measurements were acquired on the surface and inside the TBMs.These measurements are also complemented by few data in the literature.An original methodology of signal processing is pro-posed to characterize the amplitude of the particle velocities,as well as the frequency content of the signals to highlight the most energetic bands.The levels of vibrations are also compared with the thresholds existing in various European regulations concerning the impact on neighbouring structures and the disturbance to local residents. 展开更多
关键词 Ground-borne vibrations tunnel boring machine(tbm) In situ measurement Dynamic characterization Vibration levels Site spectrum
下载PDF
Tunnelling performance prediction of cantilever boring machine in sedimentary hard-rock tunnel using deep belief network 被引量:2
3
作者 SONG Zhan-ping CHENG Yun +1 位作者 ZHANG Ze-kun YANG Teng-tian 《Journal of Mountain Science》 SCIE CSCD 2023年第7期2029-2040,共12页
Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in... Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in the field of underground space engineering.This paper presented a case study of tunnelling performance prediction method of CBM in sedimentary hard-rock tunnel of Karst landform type by using tunneling data and surrounding rock parameters.The uniaxial compressive strength(UCS),rock integrity factor(Kv),basic quality index([BQ]),rock quality index RQD,brazilian tensile strength(BTS) and brittleness index(BI) were introduced to construct a performance prediction database based on the hard-rock tunnel of Guiyang Metro Line 1 and Line 3,and then established the performance prediction model of cantilever boring machine.Then the deep belief network(DBN) was introduced into the performance prediction model,and the reliability of performance prediction model was verified by combining with engineering data.The study showed that the influence degree of surrounding rock parameters on the tunneling performance of the cantilever boring machine is UCS > [BQ] > BTS >RQD > Kv > BI.The performance prediction model shows that the instantaneous cutting rate(ICR) has a good correlation with the surrounding rock parameters,and the predicting model accuracy is related to the reliability of construction data.The prediction of limestone and dolomite sections of Line 3 based on the DBN performance prediction model shows that the measured ICR and predicted ICR is consistent and the built performance prediction model is reliable.The research results have theoretical reference significance for the applicability analysis and mechanical selection of cantilever boring machine for hard rock tunnel. 展开更多
关键词 Urban metro tunnel Cantilever boring machine Hard rock tunnel Performance prediction model Linear regression Deep belief network
下载PDF
HSP超前探测技术在煤矿TBM掘进巷道中的应用研究 被引量:2
4
作者 张盛 陈召 +5 位作者 卢松 杨战标 冀畔俊 贺飞 鲁义强 刘佳伟 《煤田地质与勘探》 EI CAS CSCD 北大核心 2024年第3期107-117,共11页
随着全断面掘进机TBM(Tunnel Boring Machine)逐渐应用于煤矿岩巷掘进,对不良地质构造进行超前准确快速预测的需求日益迫切。通过对主动源地震波超前探测方法的特点和TBM破岩震源超前探测技术的适用性进行分析,结合煤矿巷道地质和生产条... 随着全断面掘进机TBM(Tunnel Boring Machine)逐渐应用于煤矿岩巷掘进,对不良地质构造进行超前准确快速预测的需求日益迫切。通过对主动源地震波超前探测方法的特点和TBM破岩震源超前探测技术的适用性进行分析,结合煤矿巷道地质和生产条件,提出了适用于煤矿巷道TBM掘进的HSP超前探测方法。以河南平顶山首山一矿TBM掘进底板瓦斯治理巷道为工程背景,选用防爆硬件一体化设计的探测仪器在煤矿巷道中进行应用。构建了空间型观测方式对煤矿巷道近水平煤线进行探测,优化了双护盾TBM掘进巷道狭小空间检波器阵列式布置参数;基于时频分析、互相关干涉处理、反射与散射联合反演等方法处理原始信号并进行探测结果成像。研究表明:采用空间型观测方式可实现与巷道小角度斜交煤线的识别,设计震源与首检波器间距离为15 m时最优。通过时频分析提取有效信号,利用互相关干涉法获取虚拟震源道和反射特征曲线,并结合反射与散射联合反演成像得到探测区域地层反射能量分布图,能够较准确地推测得到围岩存在的不良地质构造。通过比较现场开挖揭露情况与探测结果发现两者吻合度较高,表明HSP超前探测方法可实现掘进工作面前方100 m范围内超前无损地质预测,有助于提高煤矿岩巷TBM掘进速度。 展开更多
关键词 煤矿岩巷 超前探测 水平声波探测法(HSP) tbm 破岩震源
下载PDF
小转弯曲线隧道TBM选型与掘进姿态调控方法 被引量:1
5
作者 杜立杰 郝洪达 +5 位作者 杨亚磊 李青蔚 张卫东 刘家驿 冯宏朝 贾连辉 《隧道建设(中英文)》 CSCD 北大核心 2024年第5期1106-1115,共10页
小转弯隧道施工时全断面隧道掘进机(full-section tunnel boring machine,TBM)的选型设计和掘进姿态控制具有特殊性,目前还缺乏通用的理论依据和指导方法。针对此问题,首先,对传统类型TBM小转弯选型进行研究,结合已有项目数据和几何模拟... 小转弯隧道施工时全断面隧道掘进机(full-section tunnel boring machine,TBM)的选型设计和掘进姿态控制具有特殊性,目前还缺乏通用的理论依据和指导方法。针对此问题,首先,对传统类型TBM小转弯选型进行研究,结合已有项目数据和几何模拟,确定传统类型TBM能适应的最小转弯半径。然后,对双盾敞开式TBM的推进系统和导向系统进行针对性设计,通过分析双盾敞开式TBM推进系统结构和实际施工,提出转弯时双盾敞开式TBM推进油缸内外侧行程差值的理论计算方法和施工过程中的姿态调控方法。最后,得出如下结论:1)当隧道转弯半径小于200 m时,敞开式TBM适应难度较大,需要采用双盾敞开式TBM;2)结合抚宁抽水蓄能电站项目实际施工情况,提出的双盾敞开式TBM的理论计算方法和姿态调控方法确保了转弯段隧道的轴线偏差在要求范围内。 展开更多
关键词 全断面隧道掘进机 选型设计 双盾敞开式tbm 小转弯掘进 姿态调控
下载PDF
铁路隧道TBM施工物料运输方式对比分析
6
作者 齐梦学 曾绍毅 +2 位作者 杨庆辉 刘卓 郭志龙 《隧道建设(中英文)》 CSCD 北大核心 2024年第5期1077-1085,共9页
为便于选择TBM施工物料运输方式,以铁路隧道为工程背景,首先,简要总结有轨运输和无轨运输2种运输方式的特点及其工程应用情况;然后,根据施工实践拟定典型工况,研究典型工况下的运输方案及设备配置,并从设备配置和工期2个方面对有轨运输... 为便于选择TBM施工物料运输方式,以铁路隧道为工程背景,首先,简要总结有轨运输和无轨运输2种运输方式的特点及其工程应用情况;然后,根据施工实践拟定典型工况,研究典型工况下的运输方案及设备配置,并从设备配置和工期2个方面对有轨运输和无轨运输进行详细对比分析。研究结果表明:1)有轨运输和无轨运输在铁路隧道TBM施工中技术上都是可行的,总工期无明显差异。2)我国配合TBM施工的内燃机车质量明显不高且突破难度较大,应努力提升电动机车的工程适应性、可靠性、耐久性以及人性化设计;同时,需要规范有轨运输设备配置要求、轨道铺设和维护质量,以提升有轨运输的效率。3)需要研究适合TBM施工工况且成本低、通用性好的无轨运输设备。 展开更多
关键词 铁路隧道 tbm 物料运输 有轨运输 无轨运输
下载PDF
天山胜利隧道敞开式TBM钢管片支护作用效果研究
7
作者 李林峰 谭忠盛 +1 位作者 周振梁 彭文波 《隧道建设(中英文)》 CSCD 北大核心 2024年第5期984-990,共7页
针对TBM穿越断层破碎带地层洞壁围岩松动掉块严重的问题,依托乌尉天山胜利隧道,采用数值模拟的方法,通过对比研究传统支护方式与新型钢管片支护方式下围岩变形和围岩塑性区情况,研究钢管片支护的作用效果;同时,为说明不同支护的适用条件... 针对TBM穿越断层破碎带地层洞壁围岩松动掉块严重的问题,依托乌尉天山胜利隧道,采用数值模拟的方法,通过对比研究传统支护方式与新型钢管片支护方式下围岩变形和围岩塑性区情况,研究钢管片支护的作用效果;同时,为说明不同支护的适用条件,采用现场调研方法开展不同支护方式下施工效率和经济性对比分析。结果表明:1)断层破碎带地层中,当围岩出露护盾后,变形量与塑性区范围增大,围岩破坏程度加剧,以锚杆和钢拱架为主的传统支护方式无法较好地控制围岩变形和塑性区发展。2)断层破碎带地层中,钢管片支护较传统支护的围岩累计沉降值降低53%,围岩变形收敛快,能更好地控制围岩变形和发展。3)钢管片支护较传统支护的围岩塑性区范围小,其中边墙的最终塑性区缩小44%,且钢管片支护可实现早封闭、及时支护,塑性区均匀,更有利于围岩的稳定。4)一般地层中,传统支护方式的经济性和效率更佳;断层破碎带地层中,钢管片支护方式可提供安全作业空间,减小钢拱架+喷锚支护作业量,较传统支护经济性和施工效率更佳。 展开更多
关键词 天山胜利隧道 敞开式tbm 断层破碎带 支护方式 围岩稳定性 钢管片支护
下载PDF
深部金属矿山巷道TBM掘进技术应用现状及研究进展
8
作者 刘泉声 潘玉丛 +3 位作者 余宏淦 邓鹏海 陈梓韬 杜承磊 《有色金属(矿山部分)》 2024年第6期25-41,共17页
未来10年,我国将有30%以上金属矿山开采深度达到或超过千米。深部金属矿山开采面临高地应力、高地温、地层多变、采掘强扰动等复杂地质环境,给巷道掘进带来严峻挑战。传统钻爆法巷道掘进非连续作业、效率低、灾害频发,难以满足建设需求... 未来10年,我国将有30%以上金属矿山开采深度达到或超过千米。深部金属矿山开采面临高地应力、高地温、地层多变、采掘强扰动等复杂地质环境,给巷道掘进带来严峻挑战。传统钻爆法巷道掘进非连续作业、效率低、灾害频发,难以满足建设需求,采用隧道掘进机(TBM)进行机械化连续掘进是深部金属矿山巷道建设的未来发展方向。然而,因深部金属矿山独有工程地质特点和巷道掘进需求,TBM技术在深部金属矿山巷道掘进中仍存在一些技术难题和挑战。本文首先总结了TBM技术在深部金属矿山巷道掘进中的三个应用难点:1)缺乏适用于深部金属矿山巷道的TBM适应性选型设计理论;2)缺乏适用于深部金属矿山巷道的TBM高效掘进技术;3)缺乏适用于深部金属矿山巷道的TBM掘进灾害监测预警与防控技术。然后,从六个方面介绍了深部金属矿山巷道TBM掘进技术应用的研究进展:适应性选型与设计技术、刀盘刀具高效破岩理论、掘进性能精准预测与评价方法、小半径转弯和倾斜巷道掘进技术、掘进灾害智能预警与防控技术、智能决策和辅助驾驶技术。上述研究成果为推动TBM掘进技术在深部金属矿山巷道中的广泛应用,实现深部金属矿山巷道快速掘进指明了发展方向。 展开更多
关键词 深部金属矿山巷道 隧道掘进机 采掘失衡 适应性选型与设计 掘进灾害预警与防控 智能决策和辅助驾驶
下载PDF
地铁施工物化阶段TBM区间碳排放核算与减排 被引量:1
9
作者 王冬冬 毕延哲 +12 位作者 王春胜 黄华 唐丽茹 罗楚桓 李建强 赵康 彭仕坤 曹晓强 张阳 谢晓宇 黄福志 陈连军 王刚 《建筑节能(中英文)》 CAS 2024年第2期136-142,共7页
目前,国内外对土建工程碳排放的研究主要集中在住宅、办公建筑领域,对地铁建设工程碳排放的研究较少。为计量地铁TBM区间土建工程物化阶段碳排放,识别其排放特点,运用碳排放系数法建立了包含TBM区间土建实体、建造配套设备、运输施工机... 目前,国内外对土建工程碳排放的研究主要集中在住宅、办公建筑领域,对地铁建设工程碳排放的研究较少。为计量地铁TBM区间土建工程物化阶段碳排放,识别其排放特点,运用碳排放系数法建立了包含TBM区间土建实体、建造配套设备、运输施工机具、周转材料、劳动力在内的系统边界,将物化阶段划分为建材及预构件生产、建材及预构件运输、现场施工三个环节对碳排放进行计量。对碳排放因子进行了定义选取,构建了TBM区间各环节碳排放的计量模型并对青岛地铁典型TBM工段进行了案例分析,得到物化阶段三个环节的碳排放强度分别为4875.87 tCO_(2)/km、49.54 tCO_(2)/km、1780.04 tCO_(2)/km,总碳排放强度为6705.45 tCO_(2)/km。通过情景假设法,得出地铁TBM区间再生建材的使用可以带来1.21%~2.43%的减排效益。 展开更多
关键词 碳排放 青岛地铁 隧道掘进机(tbm) 物化阶段 碳减排
下载PDF
基于TBM掘进大数据和特征参数的引水隧洞塌方分析 被引量:1
10
作者 裴成元 张云旆 +2 位作者 刘军生 刘立鹏 曹瑞琅 《隧道建设(中英文)》 CSCD 北大核心 2024年第5期952-963,共12页
针对TBM掘进过程中缺乏对围岩质量和塌方风险快捷、精准的预测预警方法,通过对TBM掘进大数据的深入挖掘,结合对实际工程塌方数据的剖析,提出潜在塌方风险的辅助判断依据。首先,对冗杂、连续的原始采集数据进行预处理,获取高质量的分析数... 针对TBM掘进过程中缺乏对围岩质量和塌方风险快捷、精准的预测预警方法,通过对TBM掘进大数据的深入挖掘,结合对实际工程塌方数据的剖析,提出潜在塌方风险的辅助判断依据。首先,对冗杂、连续的原始采集数据进行预处理,获取高质量的分析数据;然后,基于参数的相关性分析提出围岩特征参数的计算方法,并围绕特征参数的合理性和适用性,通过理论推导、室内试验和现场原位掘进试验进行论证;最后,结合实际的TBM塌方案例分析特征参数与围岩地质情况的相关性,提出塌方风险快速判断依据。结果表明:基于TBM掘进数据获取的围岩特征参数在一定程度上反映了围岩质量,其数值与围岩质量正相关,当其数值显著降低、变幅超过69.2%时,当前的掘进循环极大可能存在塌方风险。 展开更多
关键词 引水隧洞 tbm 大数据 围岩质量 特征参数 塌方分析
下载PDF
小断面土石组合地质条件下TBM施工围岩可掘性分级识别 被引量:1
11
作者 杨耀红 刘德福 +2 位作者 张智晓 韩兴忠 孙小虎 《长江科学院院报》 CSCD 北大核心 2024年第3期79-87,共9页
围岩可掘性分级以及识别研究对隧道掘进机(TBM)高效率施工及智能化控制意义重大。依托南水北调安阳市西部调水工程TBM施工实际数据,利用掘进性能综合指标单位贯入度推力(FPI)、单位贯入度扭矩(TPI)建立了小断面土石组合地质条件下TBM施... 围岩可掘性分级以及识别研究对隧道掘进机(TBM)高效率施工及智能化控制意义重大。依托南水北调安阳市西部调水工程TBM施工实际数据,利用掘进性能综合指标单位贯入度推力(FPI)、单位贯入度扭矩(TPI)建立了小断面土石组合地质条件下TBM施工围岩可掘性分级标准;提出了PCA-RF模型对围岩可掘性分级进行识别,并与BP、SVR和RF模型进行了比较讨论。结果表明:①建立的小断面土石组合围岩TBM施工可掘性分级标准是适用的,克服了土石组合围岩下传统围岩分类方法的局限性;②小断面土石组合围岩TBM施工可掘性分级PCA-RF识别模型的识别准确率达到了98.3%,高于BP、SVR和RF模型,可以满足工程施工需要。 展开更多
关键词 隧道掘进机(tbm) 小断面 土石组合 可掘性分级 PCA-RF模型
下载PDF
煤矿复杂地层TBM掘进巷道新型装配式支护结构工程实践
12
作者 唐永志 唐彬 +2 位作者 程桦 王传兵 王要平 《煤炭科学技术》 EI CAS CSCD 北大核心 2024年第9期68-75,共8页
TBM(Tunnel Boring Machine)全断面掘进机已在煤矿深井巷道掘进工程中成功应用,取得了显著的社会经济效益。但仍存在影响其进一步推广应用的技术瓶颈。针对当前支护结构与支护技术难以同时满足支护效率、支护强度和施工成本方面的要求,... TBM(Tunnel Boring Machine)全断面掘进机已在煤矿深井巷道掘进工程中成功应用,取得了显著的社会经济效益。但仍存在影响其进一步推广应用的技术瓶颈。针对当前支护结构与支护技术难以同时满足支护效率、支护强度和施工成本方面的要求,TBM难以充分发挥其速度优势的技术瓶颈,研究团队研发了新型钢管片型装配式支护结构。开展了新型装配式支护结构大比尺模型试验,获得新型支护结构在受载条件下变形破坏规律,根据试验结果优化新型支护结构型式。基于新型钢管片支护下TBM掘进巷道数值模拟评估新型支护结构可靠性。最后开展工业性试验,现场验证新型钢管片式支护结构用于煤矿TBM掘进巷道的可行性。试验结果表明,巷道围岩最大拉应变为803×10-6,钢管片支护结构变形量小于1 mm。新型支护结构安装速度快,可在90 min内掘进1.5 m并完成一环管片的安装工作,显著提高了TBM掘进巷道的支护强度和TBM掘进作业线的地层适应性。为未来进一步提高煤矿巷道掘进速度、保障煤矿采掘接替提供技术参考。 展开更多
关键词 巷道掘进 全断面掘进机 复杂地层 tbm掘进 装配式支护结构
下载PDF
Design Theory of Full Face Rock Tunnel Boring Machine Transition Cutter Edge Angle and Its Application 被引量:25
13
作者 ZHANG Zhaohuang MENG Liang SUN Fei 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2013年第3期541-546,共6页
At present, the inner cutters of a full face rock tunnel boring machine (TBM) and transition cutter edge angles are designed on the basis of indentation test or linear grooving test. The inner and outer edge angles of... At present, the inner cutters of a full face rock tunnel boring machine (TBM) and transition cutter edge angles are designed on the basis of indentation test or linear grooving test. The inner and outer edge angles of disc cutters are characterized as symmetric to each other with respect to the cutter edge plane. This design has some practical defects, such as severe eccentric wear and tipping, etc. In this paper, the current design theory of disc cutter edge angle is analyzed, and the characteristics of the rock-breaking movement of disc cutters are studied. The researching results show that the rotational motion of disc cutters with the cutterhead gives rise to the difference between the interactions of inner rock and outer rock with the contact area of disc cutters, with shearing and extrusion on the inner rock and attrition on the outer rock. The wear of disc cutters at the contact area is unbalanced, among which the wear in the largest normal stress area is most apparent. Therefore, a three-dimensional model theory of rock breaking and an edge angle design theory of transition disc cutter are proposed to overcome the flaws of the currently used TBM cutter heads, such as short life span, camber wearing, tipping. And a corresponding equation is established. With reference to a specific construction case, the edge angle of the transition disc cutter has been designed based on the theory. The application of TBM in some practical project proves that the theory has obvious advantages in enhancing disc cutter life, decreasing replacement frequency, and making economic benefits. The proposed research provides a theoretical basis for the design of TBM three-dimensional disc cutters whose rock-breaking operation time can be effectively increased. 展开更多
关键词 disc cutter three-dimensional mode edge angle full face rock tunnel boring machine (tbm) flat-face cutterhead
下载PDF
渗流-应力耦合作用下穿断层破碎带TBM输水隧洞结构安全研究
14
作者 康凯 张飞儒 +5 位作者 王正中 许建建 刘彪 赵玮 刘铨鸿 王鑫 《水资源与水工程学报》 CSCD 北大核心 2024年第3期173-182,191,共11页
为分析敞开式隧道掘进机(TBM)穿越断层破碎带深埋长输水隧洞围岩的稳定性及其支护结构的安全性,依托东庄水利枢纽北线输水隧洞工程,采用ABAQUS软件建立隧洞开挖过程渗流-应力耦合三维动态施工仿真模型,研究了隧洞开挖支护过程中断层破... 为分析敞开式隧道掘进机(TBM)穿越断层破碎带深埋长输水隧洞围岩的稳定性及其支护结构的安全性,依托东庄水利枢纽北线输水隧洞工程,采用ABAQUS软件建立隧洞开挖过程渗流-应力耦合三维动态施工仿真模型,研究了隧洞开挖支护过程中断层破碎带处围岩的稳定性和支护结构的受力特性及其变化规律。结果表明:隧洞围岩由于卸载作用其孔隙度最大值较初始状态增大了0.88%,渗透系数最大值较初始状态增大了2.59%;隧洞围岩孔隙水压力随开挖支护过程先下降—再平缓—最后回升至稳定;围岩塑性区出现在沿径向1 m范围内,等效塑性应变极值出现在围岩腰线处;锚杆应力在衬砌进行支护时达到峰值,其最大值为182.90 MPa;衬砌内、外缘均处于受压状态,衬砌环向应力值随开挖支护过程先出现最大值,随后略微减小至稳定,其值在6.66~11.92 MPa范围内;衬砌的变形整体上表现为向内收缩,收缩量从顶拱和底拱处向腰线处逐渐减小,其值在0.67~1.35 mm范围内;随着排水量的增加,围岩最大径缩量逐渐增大,衬砌外水压力折减系数逐渐减小。研究结果可为穿断层破碎带TBM隧洞工程结构设计及其安全施工和运营提供参考依据。 展开更多
关键词 输水隧洞 断层破碎带 渗流-应力耦合 隧道掘进机(tbm) 支护结构 施工仿真
下载PDF
TBM隧道岩石可掘性评价指标及其应用研究综述
15
作者 李子琛 朱杰兵 +2 位作者 张宜虎 汪斌 徐栋栋 《地下空间与工程学报》 CSCD 北大核心 2024年第S01期508-520,共13页
TBM(Tunnel Boring Machine)掘进施工成本中,刀具的磨损占比很高,这通常是由于TBM的刀具设计与岩石强度及硬度不匹配。因此需要对TBM隧道岩石进行可掘性评估,为刀具设计及施工参数确定提供依据。岩石可掘性评价在TBM围岩分级、掘进效率... TBM(Tunnel Boring Machine)掘进施工成本中,刀具的磨损占比很高,这通常是由于TBM的刀具设计与岩石强度及硬度不匹配。因此需要对TBM隧道岩石进行可掘性评估,为刀具设计及施工参数确定提供依据。岩石可掘性评价在TBM围岩分级、掘进效率预测等方面十分重要,是评估TBM施工效率与成本的关键,但隧道TBM开挖过程中岩石可掘性的评价通常相当复杂,需要考虑许多参数,且至今国内外对可掘性这一指标尚未有标准化定义。通过文献检索,本文针对可掘性指标的定义,可掘性的研究应用等方面研究进展进行综述。结合已有的研究成果,对TBM可掘性未来的研究方向进行了展望。 展开更多
关键词 全断面隧道掘进机 可掘性指标 tbm围岩分级 预测模型
下载PDF
Theoretical prediction of wear of disc cutters in tunnel boring machine and its application 被引量:8
16
作者 Zhaohuang Zhang Muhammad Aqeel +1 位作者 Cong Li Fei Sun 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2019年第1期111-120,共10页
Predicting the cutter consumption and the exact time to replace the worn-out cutters in tunneling projects constructed with tunnel boring machine(TBM) is always a challenging issue. In this paper, we focus on the anal... Predicting the cutter consumption and the exact time to replace the worn-out cutters in tunneling projects constructed with tunnel boring machine(TBM) is always a challenging issue. In this paper, we focus on the analyses of cutter motion in the rock breaking process and trajectory of rock breaking point on the cutter edge in rocks. The analytical expressions of the length of face along which the breaking point moves and the length of spiral trajectory of the maximum penetration point are derived. Through observation of rock breaking process of disc cutters as well as analysis of disc rock interaction, the following concepts are proposed: the arc length theory of predicting wear extent of inner and center cutters, and the spiral theory of predicting wear extent of gage and transition cutters. Data obtained from5621 m-long Qinling tunnel reveal that among 39 disc cutters, the relative errors between cumulatively predicted and measured wear values for nine cutters are larger than 20%, while approximately 76.9% of total cutters have the relative errors less than 20%. The proposed method could offer a new attempt to predict the disc cutter's wear extent and changing time. 展开更多
关键词 Full-face rock tunnel boring machine(tbm) DISC CUTTER WEAR prediction
下载PDF
Wear Analysis of Disc Cutters of Full Face Rock Tunnel Boring Machine 被引量:19
17
作者 ZHANG Zhaohuang MENG Liang SUN Fei 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2014年第6期1294-1300,共7页
Wear is a major factor of disc cutters’ failure. No current theory offers a standard for the prediction of disc cutter wear yet. In the field the wear prediction method commonly used is based on the excavation length... Wear is a major factor of disc cutters’ failure. No current theory offers a standard for the prediction of disc cutter wear yet. In the field the wear prediction method commonly used is based on the excavation length of tunnel boring machine(TBM) to predict the disc cutter wear and its wear law, considering the location number of each disc cutter on the cutterhead(radius for installation); in theory, there is a prediction method of using arc wear coefficient. However, the preceding two methods have their own errors, with their accuracy being 40% or so and largely relying on the technicians’ experience. Therefore, radial wear coefficient, axial wear coefficient and trajectory wear coefficient are defined on the basis of the operating characteristics of TBM. With reference to the installation and characteristics of disc cutters, those coefficients are modified according to penetration, which gives rise to the presentation of comprehensive axial wear coefficient, comprehensive radial wear coefficient and comprehensive trajectory wear coefficient. Calculation and determination of wear coefficients are made with consideration of data from a segment of TBM project(excavation length 173 m). The resulting wear coefficient values, after modification, are adopted to predict the disc cutter wear in the follow-up segment of the TBM project(excavation length of 5621 m). The prediction results show that the disc cutter wear predicted with comprehensive radial wear coefficient and comprehensive trajectory wear coefficient are not only accurate(accuracy 16.12%) but also highly congruous, whereas there is a larger deviation in the prediction with comprehensive axial wear coefficient(accuracy 41%, which is in agreement with the prediction of disc cutters’ life in the field). This paper puts forth a new method concerning prediction of life span and wear of TBM disc cutters as well as timing for replacing disc cutters. 展开更多
关键词 full face rock tunnel boring machine disc cutter radial wear coefficient axial wear coefficient trajectory wear coefficient
下载PDF
Load-sharing Characteristic of Multiple Pinions Driving in Tunneling Boring Machine 被引量:8
18
作者 WEI Jing SUN Qinchao +3 位作者 SUN Wei DING Xin TU Wenping WANG Qingguo 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2013年第3期532-540,共9页
The failure of the key parts, such as gears, in cutter head driving system of tunneling boring machine has not been properly solved under the interaction of driving motors asynchronously and wave tunneling torque load... The failure of the key parts, such as gears, in cutter head driving system of tunneling boring machine has not been properly solved under the interaction of driving motors asynchronously and wave tunneling torque load. A dynamic model of multi-gear driving system is established considering the inertia effects of driving mechanism and cutter head as well as the bending-torsional coupling. By taking into account the nonlinear coupling factors between ring gear and multiple pinions, the influence for meshing angle by bending-torsional coupling and the dynamic load-sharing characteristic of multiple pinions driving are analyzed. Load-sharing coefficients at different rotating cutter head speeds and input torques are presented. Numerical results indicate that the load-sharing coefficients can reach up to 1.2-1.3. A simulated experimental platform of the multiple pinions driving is carried out and the torque distributions under the step load in driving shaft of pinions are measured. The imbalance of torque distribution of pinions is verified and the load-sharing coefficients in each pinion can reach 1.262. The results of simulation and test are similar, which shows the correctness of theoretical model. A loop coupling control method is put forward based on current torque master slave control method. The imbalance of the multiple pinions driving in cutter head driving system of tunneling boring machine can be greatly decreased and the load-sharing coefficients can be reduced to 1.051 by using the loop coupling control method. The proposed research provides an effective solution to the imbalance of torque distribution and synchronous control method for multiple pinions driving of TBM. 展开更多
关键词 load-sharing characteristic tunneling boring machine(tbm) multiple pinions driving nonlinear dynamic characteristic
下载PDF
基于图像分析的TBM掘进参数与岩碴特征关系研究
19
作者 周小雄 肖禹航 +3 位作者 龚秋明 刘晓丽 刘俊豪 刘东鑫 《岩土力学》 EI CAS CSCD 北大核心 2024年第4期1142-1153,共12页
岩碴图像分析是隧道掘进机(tunnelboringmechine,TBM)智能掘进中实时破岩效率评价和掘进参数优化的重要手段。为了研究掘进参数与岩碴图像特征的关系,依托青岛地铁6号线创石区间TBM施工段,在一段较完整花岗岩地层中开展了分步推力掘进试... 岩碴图像分析是隧道掘进机(tunnelboringmechine,TBM)智能掘进中实时破岩效率评价和掘进参数优化的重要手段。为了研究掘进参数与岩碴图像特征的关系,依托青岛地铁6号线创石区间TBM施工段,在一段较完整花岗岩地层中开展了分步推力掘进试验,并通过搭载的岩碴图像分析系统对岩碴图像进行采集和分析。结果表明,岩碴图像的中位粒径d50、最大粒径dmax和粗糙度指数CI与推力、扭矩和贯入度之间均表现出正相关,与现场贯入指数FPI和工程比能SE之间均呈现出良好的负相关。当推力超过破岩临界值后,推力的提升将显著提高岩碴的d50和CI,而只有当推力进一步增大到一定水平后dmax才显著增大。此外,随着推力的提升,大岩片的二维形状逐渐呈现出长条形,其平均长短轴比也将增加,但是推力超过一定水平后,大岩片长短轴将保持不变。上述研究结果表明,岩碴粒径和形状参数均反映出破岩效率,可作为实时TBM掘进参数优化的评价指标。 展开更多
关键词 隧道掘进机 掘进试验 掘进参数 岩碴 掘进性能
下载PDF
基于VMD与加权RF的TBM掘进速度预测SHAP解释模型
20
作者 张建明 侍克斌 +3 位作者 贾运甫 任志强 巴合特别克·达拉依汗 刘昭 《隧道建设(中英文)》 CSCD 北大核心 2024年第5期1012-1028,共17页
为较准确地实现TBM掘进速度(PR)的预测,构建一套基于加权随机森林(RF)结合变分模态分解(VMD)的集成学习预测模型。模型建立过程中,通过收集来自KS隧洞与兰州水源地输水隧洞中涵盖不同岩性下的数据,利用VMD对数据进行4次模态分解,在保留... 为较准确地实现TBM掘进速度(PR)的预测,构建一套基于加权随机森林(RF)结合变分模态分解(VMD)的集成学习预测模型。模型建立过程中,通过收集来自KS隧洞与兰州水源地输水隧洞中涵盖不同岩性下的数据,利用VMD对数据进行4次模态分解,在保留数据特性的同时去除最高频噪音;采用SHAP对未加权传统RF从模型贡献角度进行特征度量,以此实现未加权传统RF加权,并使用RFECV与网格搜索对加权RF进行特征遴选、超参数优化;通过实际工程对模型的性能进行验证,基于SHAP理论对模型从全局与局部进行解释。结果表明:1)所建模型预测精度较高,其在测试集上的均方根误差(MSE)、平均绝对误差(MAE)与决定系数(R^(2))分别为0.0649(m/h)^(2)、0.1875 m/h、0.9254。2)在实际工程的验证中,模型取得了MSE=0.0503(m/h)^(2)、MAE=0.1613 m/h、R^(2)=0.9505的性能表现,精度理想,且性能均高于常用的深度神经网络、支持向量回归、未加权传统RF。3)经过VMD处理可有效提升PR的预测精度,处理后的模型在测试集上MSE、MAE、R^(2)分别提升了82.50%、59.00%、33.25%。4)岩石单轴抗压强度是精准预测PR时最重要的因素,地质参数在预测中的交互性明显优于掘进参数。预测分析重要洞段的PR时,需结合全局与局部2个角度进行综合分析。 展开更多
关键词 tbm隧道 tbm掘进性能 净掘进速度预测 变分模态分解 随机森林
下载PDF
上一页 1 2 48 下一页 到第
使用帮助 返回顶部