Research on Construction Control Technology of Large-Span and Small Clear Distance Underpass High-Voltage Line Tunnel
1
作者 Kun Wang Lushi Wang Daoliang Wang 《Journal of World Architecture》 2021年第1期11-16,共6页
Hanping tunnel is a control project of national highway 310 Dahejia to Qingshui highway project.It needs to cross a 330kV high-voltage transmission line under the condition of small clear distance,which requires high ... Hanping tunnel is a control project of national highway 310 Dahejia to Qingshui highway project.It needs to cross a 330kV high-voltage transmission line under the condition of small clear distance,which requires high construction requirements.In view of the difficulties such as shallow buried depth of tunnel and small clear distance between tunnel and tower of high-voltage line,multiple excavation blasting method is adopted,and smooth blasting,charge quantity control and damping hole setting are comprehensively used to reduce the impact on the tower and structure of high-voltage line.In order to ensure the smooth progress of the project,the large-scale finite element analysis software is used to simulate the whole excavation project.The influence of the full-section method and the middle partition wall method(CD method)on the surrounding rock and the high-voltage electric tower is compared.It is found that the CD method can effectively control the displacement of the surrounding rock and the tower on it and the uneven settlement. 展开更多
关键词 Large-span tunnel High-voltage tower construction control
下载PDF
Construction Project Management and Construction Quality Control Strategy
2
作者 Qinrong Zhang 《Journal of Architectural Research and Development》 2024年第4期45-50,共6页
With the gradual acceleration of the urbanization process,the construction industry has been developing rapidly.As the key link to ensure the quality and safety of the project,construction management and construction ... With the gradual acceleration of the urbanization process,the construction industry has been developing rapidly.As the key link to ensure the quality and safety of the project,construction management and construction quality control are of great significance to enhance the competitiveness of construction enterprises and realize sustainable development.In this paper,the effective strategy of construction management and the effective strategy of construction quality control will be discussed in depth,aiming at providing useful management and quality control strategies for construction enterprises. 展开更多
关键词 construction engineering management construction quality control STRATEGY Quality control point
下载PDF
Research on Quality Management Measures of Green Building Construction
3
作者 Jie Hong Xiang Xu 《Journal of Architectural Research and Development》 2024年第3期8-13,共6页
Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering ... Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering construction,the energy-saving properties of the building should also be considered.Therefore,a scientific management approach should be adopted to improve green building management.This paper primarily examines the importance of quality management in green building construction,along with the factors influencing it.It also identifies the quality issues present in current green building construction.Finally,it proposes measures for quality management in the green building construction process to facilitate the industry’s healthy development. 展开更多
关键词 Green building engineering construction process control Quality management construction publicity
下载PDF
Geometric state transfer method for construction control of a large-segment steel box girder with hoisting installation 被引量:6
4
作者 Jin-feng WANG Hua-wei XIANG +2 位作者 Jiang-tao ZHANG Tian-mei WU Rong-qiao XU 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2020年第5期382-391,共10页
This paper aims to address the problem of geometric state control of large-segment steel box girders in offshore hoisting during the construction of large-span bridges. First, the geometric state control indexes of a ... This paper aims to address the problem of geometric state control of large-segment steel box girders in offshore hoisting during the construction of large-span bridges. First, the geometric state control indexes of a large-segment steel box girder are determined, such as the manufacturing parameters of the top and bottom slabs, the width of the annular joint, and the support position. Second, the geometric state equations and state transfer matrixes of large-segment steel box girders under different conditions are deduced by taking the mileage and elevation of control points as basic state variables. In application of the geometric state transfer method in the construction control of the Hong Kong-Zhuhai-Macao Bridge, the width of the annular joint and the position parameters for the support of the large-segment steel box girder are predicted precisely. Moreover, the manufacturing parameters of the top and bottom slabs of the steel box girders are calculated reliably. The measured values show that the width of the annular joint is basically the same with the difference of less than 2 mm, the eccentricity of bridge support is less than 20 mm, and the elevation error of the bridge deck is within-10 mm to +15 mm, which meets the construction accuracy. Using the geometric state transfer method, the rapid and accurate installation of the Hong Kong-Zhuhai-Macao Bridge has been realized, demonstrating that the precise control of the geometric state of a steel box girder with ectopic installation and multi-state transition can be realized by using the geometric state transfer method. 展开更多
关键词 Large-segment steel box girder Offshore hoisting construction control Geometric state Transfer matrix
原文传递
Construction and control technology of the main bridge superstructure of Sutong Bridge
5
作者 Zhang Hong Luo Chenbin +1 位作者 Zhang Yongtao You Xinpeng 《Engineering Sciences》 EI 2009年第1期76-82,共7页
The Sutong Yangtze River Bridge(short as Sutong Bridge)is now the largest span cable-stayed bridge in the world.The construction of the superstructure of the middle bridge covered several stages including erection of ... The Sutong Yangtze River Bridge(short as Sutong Bridge)is now the largest span cable-stayed bridge in the world.The construction of the superstructure of the middle bridge covered several stages including erection of the big block girders for the side span,assistant span and tower area,erection of standard girders and closure of the middle span.The big block girders were hoisted by a floating crane,and the standard girders were hoisted by a double crane system on the deck.The pushing assistant method was adopted for the middle span closure construction.Furthermore,key technologies and innovative methods used in the processes of girder erection and cable assemblage in all stages were expatiated systematically.An all-stage self-adaptive geometry control method was used in the construction process.By accurately controlling the unstressed dimensions and shape of all structural components in each step,and realization that the control system and the controlled system adapt to each other,the goal was to make control of the final line shape and inner force of the bridge structure achievable.Two solutions,including GPS based and total station based dynamic geometry monitoring systems,were used to resolve the measure problem under the wide-range of wind-induced vibrations in the long cantilever state.Finally,research on the wind-induced vibration of the superstructure during the construction period was executed.Buffeting response analysis to the longest single and double cantilever states were carried out.The analysis and evaluation of wind resistance safety of the main girders under the longest single cantilever state was made,and corresponding wind resistance measures were suggested.The as-built geometric error and cable force error were controlled in a required design range,and this whole technological achievement can be a benchmark for construction of other large span cable-stayed bridges in the future. 展开更多
关键词 Sutong Bridge SUPERSTRUCTURE construction method construction control geometry control wind-resistant measure
下载PDF
Analysis of Highway Project Construction Technology Management
6
作者 Yuan Zhou 《Journal of World Architecture》 2023年第6期1-5,共5页
Highway engineering construction plays a pivotal role in driving urban economic development,in the face of modern urban transportation high-quality development.To achieve high-quality development in modern urban trans... Highway engineering construction plays a pivotal role in driving urban economic development,in the face of modern urban transportation high-quality development.To achieve high-quality development in modern urban transportation,it is imperative to engage in effective management practices.This article analyzes the technology involved in highway engineering construction,delving into key aspects of highway construction technology,and examining measures for managing and controlling highway engineering construction technology effectively. 展开更多
关键词 Highway engineering construction technology Technology management construction control
下载PDF
GMA material design and construction quality control for asphalt pavement of steel box girder: Case study of the Hong Kong–Zhuhai–Macao Bridge 被引量:2
7
作者 Xiaoning Zhang 《Journal of Road Engineering》 2021年第1期63-72,共10页
To improve the quality of the Hong Kong–Zhuhai–Macao Bridge paving project,a new paving layer material,Guss-mastic asphalt(GMA),was proposed in this paper by combining the advantages of two types of cast asphalt mix... To improve the quality of the Hong Kong–Zhuhai–Macao Bridge paving project,a new paving layer material,Guss-mastic asphalt(GMA),was proposed in this paper by combining the advantages of two types of cast asphalt mixtures:mastic asphalt(MA)and Guss asphalt(GA).Based on the characteristics of GMA,to simulate its actual production process,this study developed a small-simulated cooker mixing equipment.Moreover,the flow degree,60C dynamic stability,and impact toughness were proposed to be used to evaluate the construction and ease,high temperature stability,and fatigue resistance of GMA cast asphalt mixtures,respectively.Moreover,the quality control standards for GMA paving materials by indoor tests,field trial mix GMA material performance tests,and accelerated loading tests were finalized.The study showed that the developed simulated cooker yielded consistent mixing results in the same working environment as the engineering cooker device.Increasing the coarse aggregate incorporation rate,coarsening the mastic epure(ME)gradation composition,and using a smaller oil to stone ratio can reduce the flowability of the GMA materials to varying degrees.The four-point bending fatigue life and impact toughness of the different GMA materials are correlated well.A mobility of<20 s,60C dynamic stability of 400–800 times/mm,15C impact toughness of400 N⋅mm,and cooker car mixing temperature control standard of 210C–230C form an appropriate control index system for the design and production of GMA cast asphalt mixtures.Simultaneously,accelerated loading tests verified the accuracy and reliability of the quality control index system that has been used in the GMA paving project of the Hong Kong–Zhuhai–Macao Bridge deck and has achieved good application results. 展开更多
关键词 Asphalt pavement Material design GMA Steel box girder construction quality control
下载PDF
Arrangement Selection and Construction Quality Control Measures of Bridge Support
8
作者 Tieyuan Sun 《Journal of Architectural Research and Development》 2022年第6期47-52,共6页
Bridge bearings are a small part of the whole bridge structure,but it can affect the corner of the bridge,and the stability and quality of the bridge deck,so the performance of the bridge bearing can directly determin... Bridge bearings are a small part of the whole bridge structure,but it can affect the corner of the bridge,and the stability and quality of the bridge deck,so the performance of the bridge bearing can directly determine the quality and lifespan of the entire bridge.The bridge bearing connects the upper and lower parts of the whole bridge.In order to improve the quality and structure of the whole bridge,the layout and selection of bridge bearings needs to be done well,the construction process needs to be closely monitored,and the whole process needs to be well-managed.The existing problems should be analyzed in detail and solved in time to ensure the quality of the bridge project. 展开更多
关键词 Bridge bearing Layout selection construction quality control Measures
下载PDF
BIM-Based Strategies for Construction Quality Control in Building Engineering
9
作者 Bin Zhang 《Journal of World Architecture》 2022年第3期37-42,共6页
In order to improve the construction quality and steadily promote the improvement in the level of the construction industry,this paper expounds BIM-based strategies for construction quality control.This paper first id... In order to improve the construction quality and steadily promote the improvement in the level of the construction industry,this paper expounds BIM-based strategies for construction quality control.This paper first identifies the factors affecting the construction quality,analyzes the advantages and value of the application of BIM in construction,and finally analyzes the scenario of applying BIM for future references. 展开更多
关键词 BIM Building engineering construction quality control
下载PDF
Influence of concrete differential aging time on the construction phases analysis of the Fenghua River Bridge 被引量:1
10
作者 余报楚 《Journal of Chongqing University》 CAS 2004年第2期34-37,共4页
The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper... The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper, a finite element method (FEM) model is set up to study the effects of concrete differential aging time on the construction phases of the Fenghua River Bridge by calculating the vertical displacement of the folding segment of the middle span and the longitudinal bending moment of Pier 12#. In the model, the girders are classified into 150 changing sections based on the desgn scheme, and their construction is to be carried in 16 phases respectively to build 12 blocks connected by a side folding segment and a middle folding segment, covered with a second dead load and in completion for 20 years. It is found that the internal forces and deformations of the concrete structures at the aging time of 60 d are quite different from those of 0 d aging time while the behaviors of the structures of 120 d aging time is nearly the same as those of 60 d aging time― the differences are so small that can be neglected, suggesting that the creep develops obviously about one month after the cement is hardened and the development fades later on. 展开更多
关键词 the Fenghua River Bridge prepress concrete successional box girder cantilever construction construction control concrete differential aging time
下载PDF
Research on Construction Process of Steel Box Girder Bridge and Its Stress Analysis
11
作者 ChengKANG 《International Journal of Technology Management》 2015年第3期104-106,共3页
The paper introduce the construction method of large segment hosting and its difficulty, and drawing up corresponding liner and stress monitoring plan. The paper gives the calculation method of shear area for such a b... The paper introduce the construction method of large segment hosting and its difficulty, and drawing up corresponding liner and stress monitoring plan. The paper gives the calculation method of shear area for such a big cantilever thin-walled steel box girder section, namely the shear coefficient computation theory of Professor Hu Haichang, and the use of this shear area perfect beam element model, structure model and the experiment prove that the shell model is more consistent, given a certain reference for similar section project. 展开更多
关键词 construction control Long-span Steel box continuous girder Large segment hosting
下载PDF
Chaotification for switched linear systems with controllers
12
作者 解玲丽 《Applied Mathematics and Mechanics(English Edition)》 SCIE EI 2013年第9期1167-1174,共8页
This paper shows that two or more switched linear systems can generate chaotic dynamical behaviors by an appropriate switching rule as they at least consist of a controllable system and an unstable system with the exp... This paper shows that two or more switched linear systems can generate chaotic dynamical behaviors by an appropriate switching rule as they at least consist of a controllable system and an unstable system with the expanding property. According to the results in the reference (Xie, L. L., Zhou, Y., and Zhao, Y. Criterion of chaos for switched linear systems with antrollers. International Journal of Bifurcation and Chaos, 20(12), 4105-4109 (2010)), a nonlinear feedback gain is needed to generate chaotic dy- namics. A linear feedback control is usually used to approximate the nonlinear one for simulation. In order to obtain the exact control, as a main result of this paper, the con- troller is constructed by Russell's result, and a block diagram is included to interpret the realization of the controller. Numerical simulations are given to illustrate the generated chaotic dynamical behavior of the switched linear systems with some parameters and show the effects of the constructed controller. 展开更多
关键词 CHAOTIFICATION switched linear system construction of controller
下载PDF
Application of Gliding Scaffold System In Cable-Stayed Bridge Construction
13
作者 YUBao-chu ZHANGZhe ChangFu-ping 《Journal of China University of Mining and Technology》 EI 2005年第2期152-156,共5页
Gonghe bridge is a double level cable-stayed concrete bridge with a single-cable-plane of single cable tower. Its span is 114+120 m and a whole length of 236 m. The gliding scaffold equipment is used for the first tim... Gonghe bridge is a double level cable-stayed concrete bridge with a single-cable-plane of single cable tower. Its span is 114+120 m and a whole length of 236 m. The gliding scaffold equipment is used for the first time in the long span cable-stayed bridge construction to reduce the construction time limit. In the process of construction, to make sure a safe connection among concrete objects with different ages, the single-supporting and single-suspension system is adopted before the concrete pouring. While the double-supporting and single-suspension system is applied after con- crete pouring. These construction systems with gliding scaffold equipment are first introduced in long span ca- ble-stayed bridge and presented in detail[1]. The practice shows that these gliding scaffold systems have many advan- tages over the traditional ones. 展开更多
关键词 cable-stayed bridge gliding scaffolding equipment construction monitor and control
下载PDF
Application of Wireless Monitoring System to Structural Health Monitoring of Long-Spanned Cable-Stayed Bridge
14
作者 孟庆成 齐欣 李乔 《Journal of Southwest Jiaotong University(English Edition)》 2007年第2期117-121,共5页
The remote monitoring system applied to the construction control and health monitoring of the Nanjing Third Yangtze River Bridge is introduced. The System makes it possible to get the structure capabilities and enviro... The remote monitoring system applied to the construction control and health monitoring of the Nanjing Third Yangtze River Bridge is introduced. The System makes it possible to get the structure capabilities and environmental parameters of the bridge at the predetermined moment. It sends the collected data over a long distance to an assigned position for display and analysis. The related methods and working condition of the wireless monitoring system are discussed. The measured data during 48 h are employed to determine the feasibility for the closure of the bridge. 展开更多
关键词 construction control Health monitoring Wireless monitoring Data collection Steel pylon Cable-stayed bridge
下载PDF
Development and Prospect of Zoning Mode in the Three Rounds of Overall Land Use Planning of China 被引量:1
15
作者 Ying XIONG Zisheng YANG 《Asian Agricultural Research》 2018年第3期47-50,共4页
Zoning system is the basic mode of establishment of overall land use planning. In this study,the zoning mode and practice in the three rounds of overall land use planning that have been carried out in China were analy... Zoning system is the basic mode of establishment of overall land use planning. In this study,the zoning mode and practice in the three rounds of overall land use planning that have been carried out in China were analyzed and summarized firstly,and then some obvious problems existing in the implementation of the zoning mode were analyzed. Finally,countermeasures and suggestions were put forward to provide necessary reference for further development and improvement of the zoning mode and the development of overall land use planning at all levels in China. 展开更多
关键词 Overall land use planning Zoning mode Regional zoning Land use zoning Land function zoning construction land control zoning
下载PDF
Evolution of suspension bridge structural systems,design theories,and shape-finding methods:A literature survey
16
作者 Wenming Zhang Genmin Tian Yupeng Chen 《Journal of Traffic and Transportation Engineering(English Edition)》 EI CSCD 2024年第2期225-244,共20页
Modern suspension bridges exhibit a trend of lighter structures,more diversified structural forms,and longer spans,the latter already exceeding two kilometers.Bridge performance under dead and live loads depends on th... Modern suspension bridges exhibit a trend of lighter structures,more diversified structural forms,and longer spans,the latter already exceeding two kilometers.Bridge performance under dead and live loads depends on their structural and main cable systems,while cablesupported bridges especially rely on the design analysis and construction control of the main cable.This literary survey systematically analyzes the research progress and state-ofthe-art status quo in the structural systems and design theories of suspension bridges,focusing on the structural systems,main cable shape analyses,live load effect analyses,and emerging lucrative research directions.More than 100 reliable references have been surveyed.(1)Multi-span or multi-main cable schemes appeal to increasing attention,which may become a better choice in terms of structural systems in scenarios with extremely long spans and heavy loads.The cable layouts,such as spatial main cables and hybrid cable-stayed suspension systems have also become feasible approaches for enhancing structural stiffness.(2)The shape-finding analysis during the construction phase is more complex and has more essential factors than that of the completed bridge state.Refined theories combining analytical methods and finite element methods are more suitable for the shape-finding analysis of complex cable systems than any single theory of the two,especially for novel cable systems.(3)The live load effect analysis methods based on traditional deflection theory or modified/improved deflection theories still have wide applications,but the refined theory of treating hangers as discrete members is also constantly developing,which is expected to provide new ideas for more complex structural analysis under the different types of live loads and their distribution forms. 展开更多
关键词 Suspension bridges Structural system Cable analysis Shape-finding analysis construction control and calculation Live load effect
原文传递
Refined analysis and construction parameter calculation for full-span erection of the continuous steel box girder bridge with long cantilevers 被引量:4
17
作者 Jin-feng WANG Tian-mei WU +2 位作者 Jiang-tao ZHANG Hua-wei XIANG Rong-qiao XU 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2020年第4期268-279,共12页
To accurately control the full-span erection of continuous steel box girder bridges with complex cross-sections and long cantilevers, both the augmented finite element method(A-FEM) and the degenerated plate elements ... To accurately control the full-span erection of continuous steel box girder bridges with complex cross-sections and long cantilevers, both the augmented finite element method(A-FEM) and the degenerated plate elements are adopted in this paper. The entire construction process is simulated by the A-FEM with the mesh-separation-based approximation technique, while the degenerated plate elements are constructed based on 3D isoparametric elements, making it suitable for analysis of a thin-walled structure. This method significantly improves computational efficiency by avoiding numerous degrees of freedom(DoFs) when analyzing complex structures. With characteristics of the full-span erection technology, the end-face angle of adjacent girder segments, the preset distance of girder segments from the design position, and the temperature difference are selected as control parameters, and they are calculated through the structural response of each construction stage. Engineering practice shows that the calculation accuracy of A-FEM is verified by field-measured results. It can be applied rapidly and effectively to evaluate the matching state of girder segments and the stress state of bearings as well as the thermal effect during full-span erection. 展开更多
关键词 Continuous steel box girder bridges Full-span erection Augmented finite element method(A-FEM) construction control construction parameter calculation
原文传递
Simulation of construction shape-forming process of cable domes 被引量:2
18
作者 YE JiHong FENG RuoQiang KAN Yuan 《Science China(Technological Sciences)》 SCIE EI CAS 2012年第1期101-116,共16页
A cable dome has no stiffness or load carrying capacity unless it has been prestressed.Analyses of cable domes are based on successful prestressing designs,making force finding analysis very important.A new force find... A cable dome has no stiffness or load carrying capacity unless it has been prestressed.Analyses of cable domes are based on successful prestressing designs,making force finding analysis very important.A new force finding method named the imbal-ance force iterative method is proposed,which can overcome some limitations of the integrity feasible prestressing method.For instance,even if groups are assigned by mistake,the pretension distribution that satisfies the known geometry form can also be found.This method possess good stability and calculation efficiency,and a case study indicates that it is applicable to the force finding of large and complicated cable domes.On the other hand,form finding analysis of cable domes is also a key engineering problem.However,rigid displacement occurs in this process,which makes the analysis more complex.In this pa-per,the dynamic relaxation method was selected,and the problem of rigid displacement was therefore effectively solved.The method includes two steps:first,the stretching cables are released,and secondly,an axial force is imposed on the two ends of each released cable.This method is convenient in its calculation and clear in its conception.A case study indicates that the method is suitable for the simulation of the construction process of various cable domes and cable-strut tension structures.Moreover,a form finding experiment was conducted on a model of a cable dome with a diameter of 4.8 m by tensing diagonal cables.The behavior of the model in the form finding process was investigated.The experimental results indicate that the ini-tial lengths of members and prestress loss are key issues in cable domes design.The results also prove that the methods of form finding and force finding proposed in this paper are reliable and effective. 展开更多
关键词 cable domes force control of construction process form control of construction process imbalance force iterativemethod dynamic relaxation method construction shape-forming process experiment
原文传递