期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Cost Prediction of a Turbofan Engine Using the Robust Partial Least Squares Method
1
作者 ZHANG Lei ZHOU Zhou 《International Journal of Plant Engineering and Management》 2010年第3期129-134,共6页
In recent years, the cost of engines has become increasingly important to engine manufacturers, who are consistently faced with major problems on how to reduce cost to a minimum. Cost has become a decisive factor for ... In recent years, the cost of engines has become increasingly important to engine manufacturers, who are consistently faced with major problems on how to reduce cost to a minimum. Cost has become a decisive factor for aircraft design. To control the continual rapid increased cost, engine cost prediction is indispensable early in the design phase. But the cost data of an aircraft engine is small; we introduce the Robust Partial Least Squares Method in solving this problem, and reducing or removing the effect of outlying data points, which is different from the Classical PLS. We use the MATLAB software doing several simulations; results and analysis of a real turbofan engine data set show the effectiveness and robustness of the Robust PLS method. The Robust PLS method can effectively be used to estimate Turbofan Engine cost with reasonable accuracy. 展开更多
关键词 cost prediction ROBUST PLS turbofan engine
下载PDF
Extracting multi-objective multigraph features for the shortest path cost prediction:Statistics-based or learning-based?
2
作者 Songwei Liu Xinwei Wang +1 位作者 Michal Weiszer Jun Chen 《Green Energy and Intelligent Transportation》 2024年第1期1-15,共15页
Efficient airport airside ground movement(AAGM)is key to successful operations of urban air mobility.Recent studies have introduced the use of multi-objective multigraphs(MOMGs)as the conceptual prototype to formulate... Efficient airport airside ground movement(AAGM)is key to successful operations of urban air mobility.Recent studies have introduced the use of multi-objective multigraphs(MOMGs)as the conceptual prototype to formulate AAGM.Swift calculation of the shortest path costs is crucial for the algorithmic heuristic search on MOMGs,however,previous work chiefly focused on single-objective simple graphs(SOSGs),treated cost enquires as search problems,and failed to keep a low level of computational time and storage complexity.This paper concentrates on the conceptual prototype MOMG,and investigates its node feature extraction,which lays the foundation for efficient prediction of shortest path costs.Two extraction methods are implemented and compared:a statistics-based method that summarises 22 node physical patterns from graph theory principles,and a learning-based method that employs node embedding technique to encode graph structures into a discriminative vector space.The former method can effectively evaluate the node physical patterns and reveals their individual importance for distance prediction,while the latter provides novel practices on processing multigraphs for node embedding algorithms that can merely handle SOSGs.Three regression models are applied to predict the shortest path costs to demonstrate the performance of each.Our experiments on randomly generated benchmark MOMGs show that(i)the statistics-based method underperforms on characterising small distance values due to severe overestimation;(ii)A subset of essential physical patterns can achieve comparable or slightly better prediction accuracy than that based on a complete set of patterns;and(iii)the learning-based method consistently outperforms the statistics-based method,while maintaining a competitive level of computational complexity. 展开更多
关键词 Multi-objective multigraph Feature extraction Shortest path cost prediction Node patterns Node embeddings Regression
原文传递
Design and implementation of construction cost prediction model based on SVM and LSSVM in industries 4.0 被引量:3
3
作者 Miao Fan Ashutosh Sharma 《International Journal of Intelligent Computing and Cybernetics》 EI 2021年第2期145-157,共13页
Purpose-In order to improve the accuracy of project cost prediction,considering the limitations of existing models,the construction cost prediction model based on SVM(Standard Support Vector Machine)and LSSVM(Least Sq... Purpose-In order to improve the accuracy of project cost prediction,considering the limitations of existing models,the construction cost prediction model based on SVM(Standard Support Vector Machine)and LSSVM(Least Squares Support Vector Machine)is put forward.Design/methodology/approach-In the competitive growth and industries 4.0,the prediction in the cost plays a key role.Findings-At the same time,the original data is dimensionality reduced.The processed data are imported into the SVM and LSSVM models for training and prediction respectively,and the prediction results are compared and analyzed and a more reasonable prediction model is selected.Originality/value-The prediction result is further optimized by parameter optimization.The relative error of the prediction model is within 7%,and the prediction accuracy is high and the result is stable. 展开更多
关键词 cost prediction Principal component analysis SVM LSSVM Industries 4.0
原文传递
A Novel System Model based on Cost-prediction for Spectrum Leasing in Cognitive Radio 被引量:1
4
作者 Wang Weidong Wang Ben Zhang Yinghai Zhao Xinlei Wang Shoufeng 《China Communications》 SCIE CSCD 2010年第2期32-41,共10页
In current researches on spectrum leasing, Common model and Property-right model are two main approaches to dynamic spectrum sharing. However, Common model does not consider the obligation of Primary System (PS) and i... In current researches on spectrum leasing, Common model and Property-right model are two main approaches to dynamic spectrum sharing. However, Common model does not consider the obligation of Primary System (PS) and is unfair to Secondary System (SS), while the cooperation based on Property-rights model has problems on its feasibility. This paper proposes a novel system model, in which a Cost-Prediction scheme for Spectrum Leasing (CPSL scheme) is designed to forecast the cost that PS would pay for leasing spectrum. Cost Function is introduced as a criterion to evaluate the potential cost of spectrum leasing for PS. The simulation results show that compared with Common model based scheme, CPSL scheme substantially improves the QoS of the delay-sensitive traffic in SS at the cost of a small degradation of PS performance. 展开更多
关键词 cognitive radio spectrum leasing cost prediction dynamic spectrum sharing CPSL
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部