In order to fully utilize the regenerative braking energy of metro trains and stabilize the metro DC traction busbar voltage,a hybrid regenerative braking energy recovery system with a dual-mode power management strat...In order to fully utilize the regenerative braking energy of metro trains and stabilize the metro DC traction busbar voltage,a hybrid regenerative braking energy recovery system with a dual-mode power management strategy is proposed.Firstly,the construction of the hybrid regenerative braking energy recovery system is explained.Then,based on the power demand of low-voltage load in metro stations,a dual-mode power management strategy is proposed to allocate the reference power of each system according to the different working conditions,and the control methods of each system are set.Finally,the correctness and effectiveness of the dual-mode strategy are verified through simulation,and the proposed braking energy utilization scheme is compared with other singleform utilization schemes.The results illustrate that the hybrid system with the dual-mode strategy can effectively recycle the regenerative braking energy of metro train and inhibit the busbar voltage fluctuation;the proposed braking energy utilization scheme has certain advantages on energy recovery and DC bus voltage stabilization compared with other single-form schemes;the proposed power management strategy can correctly allocate the reference power of each system with a lower construction cost.展开更多
Because the standard four-stage operation and con-trol strategy cannot fully utilize the gravitational potential energy of a train operating on a long and steep downhill segment,this paper further improves the method ...Because the standard four-stage operation and con-trol strategy cannot fully utilize the gravitational potential energy of a train operating on a long and steep downhill segment,this paper further improves the method for train operation and control strategy.The improved operation includes three stages of acceleration,coasting-speed limit cruising,and brak-ing.Taking the speed limit,time limit,and distance limit as the constraints,the coasting condition switching point,braking condition switching point,traction coefficient,and braking force coefficient are used as the decision variables.Then,an improved train traction energy consumption model is constructed,and an improved differential evolution algorithm is designed to solve this model.The improved method is used to simulate two long and steep downhill segments of the Nanning metro.The results show that the improved method can meet the requirements of speed limit,time limit,and distance limit.Compared with the standard four-stage operation,the improved train operation and control strategy can reduce train energy consumption by more than 40%on the two long and steep downhill segments;compared with other similar algorithms,the improved algorithm is more suitable for solving the model.展开更多
Purpose-This study aims to improve the passenger accessibility of passenger demands in the end-ofoperation period.Design/methodology/approach-A mixed integer nonlinear programming model for last train timetable optim...Purpose-This study aims to improve the passenger accessibility of passenger demands in the end-ofoperation period.Design/methodology/approach-A mixed integer nonlinear programming model for last train timetable optimization of the metro was proposed considering the constraints such as the maximum headway,the minimum headway and the latest end-of-operation time.The objective of the model is to maximize the number of reachable passengers in the end-of-operation period.A solution method based on a preset train service is proposed,which significantly reduces the variables of deciding train services in the original model and reformulates it into a mixed integer linear programming model.Findings-The results of the case study of Wuhan Metro show that the solution method can obtain highquality solutions in a shorter time;and the shorter the time interval of passenger flow data,the more obvious the advantage of solution speed;after optimization,the number of passengers reaching the destination among the passengers who need to take the last train during the end-of-operation period can be increased by 10%.Originality/value-Existing research results only consider the passengers who take the last train.Compared with previous research,considering the overall passenger demand during the end-of-operation period can make more passengers arrive at their destination.Appropriately delaying the end-of-operation time can increase the proportion of passengers who can reach the destination in the metro network,but due to the decrease in passenger demand,postponing the end-of-operation time has a bottleneck in increasing the proportion of passengers who can reach the destination.展开更多
In large cities with heavily congested metro lines, unexpected disturbances often occur, which may cause severe delay of multiple trains, blockage of partial lines, and reduction of passenger service. Metro dispatcher...In large cities with heavily congested metro lines, unexpected disturbances often occur, which may cause severe delay of multiple trains, blockage of partial lines, and reduction of passenger service. Metro dispatchers have taken a practical strategy of rescheduling the timetable and adding several backup trains in storage tracks to alleviate waiting passengers from crowding the platforms and recover from such disruptions. In this study,we first develop a mixed integer programming model to determine the optimal train rescheduling plan with considerations of in-service and backup trains. The aim of train rescheduling is to frequently dispatch trains to evacuate delayed passengers after the disruption. Given the nonlinearity of the model, several linearization techniques are adapted to reformulate the model into an equivalent linear model that can be easily handled by the optimization software. Numerical experiments are implemented to verify the effectiveness of the proposed train rescheduling approach.展开更多
钢轨波磨作为地铁线路中最为常见的轨道损伤问题之一,始终未得到根本性的解决。为研究不同轨道结构形式产生钢轨波磨后车辆内部振动噪声以及轨道结构振动的时频域特性,探究钢轨波磨对车辆和轨道的影响,对某地铁线路进行现场动静态测试,...钢轨波磨作为地铁线路中最为常见的轨道损伤问题之一,始终未得到根本性的解决。为研究不同轨道结构形式产生钢轨波磨后车辆内部振动噪声以及轨道结构振动的时频域特性,探究钢轨波磨对车辆和轨道的影响,对某地铁线路进行现场动静态测试,获取了钢轨波磨激励下车辆内部的振动和噪声响应以及轨道各部件的振动响应,使用时域指标统计、1/3倍频程谱分析等方法分析轨道振动响应特征和车内振动及噪声响应特征。结果表明:在小半径曲线地段,浮置板轨道产生了特征波长约为200 mm的钢轨波磨,整体道床轨道产生了特征波长约为60 mm的钢轨波磨;浮置板轨道的钢轨、道床板、隧道壁振动加速度有效值分别是整体道床的1.8、5.8倍及0.3倍;钢轨波磨对轨道振动的影响主要体现在中高频范围,在300~400 Hz附近,浮置板轨道振级从钢轨至隧道壁共衰减66 d B,而整体道床共衰减49 d B;列车通过测试区域时,转向架上方与客室中部垂、纵向振动加速度有效值基本一致,而客室中部横向振动加速度有效值约为转向架上方的2倍;车内转向架位置处的异常振动主要来源于钢轨波磨的激励,且短波长波磨所激励的车内振动及噪声更加剧烈。因此,地铁钢轨波磨产生后在轨道及车辆的振动噪声响应中均占主要成分,应及时对钢轨进行打磨处理,研究结果可为地铁工务维修提供理论指导。展开更多
为研究随机列车荷载作用下钢弹簧浮置板轨道(steel spring floating slab track,简称SSFST)上线运营后的减振效果,选取某地铁线路同一区间、同一曲线段内的普通无砟轨道及钢弹簧浮置板轨道典型测试断面,在同一天内开展了现场对比测试。...为研究随机列车荷载作用下钢弹簧浮置板轨道(steel spring floating slab track,简称SSFST)上线运营后的减振效果,选取某地铁线路同一区间、同一曲线段内的普通无砟轨道及钢弹簧浮置板轨道典型测试断面,在同一天内开展了现场对比测试。研究结果表明:钢弹簧浮置板轨道减振效果的线上评估结果与列车、轨道的实际运营状态直接相关;在不同列车的随机激励作用下,Z振级相对插入损失(ΔVL_(Z,max))相差超过10 dB,且部分测试样本无法满足特殊减振的设计需求;为获得保守的评价结果,应选择轮、轨平顺状态良好的运营区段开展对比测试;通过合理的养护维修,使运营列车及轨道保持良好的运行状态,是减振轨道区段满足振动控制需求的关键。展开更多
基金funded by Project supported by the Natural Science Foundation of Gansu Province,China(Grant No.22JR5RA318).
文摘In order to fully utilize the regenerative braking energy of metro trains and stabilize the metro DC traction busbar voltage,a hybrid regenerative braking energy recovery system with a dual-mode power management strategy is proposed.Firstly,the construction of the hybrid regenerative braking energy recovery system is explained.Then,based on the power demand of low-voltage load in metro stations,a dual-mode power management strategy is proposed to allocate the reference power of each system according to the different working conditions,and the control methods of each system are set.Finally,the correctness and effectiveness of the dual-mode strategy are verified through simulation,and the proposed braking energy utilization scheme is compared with other singleform utilization schemes.The results illustrate that the hybrid system with the dual-mode strategy can effectively recycle the regenerative braking energy of metro train and inhibit the busbar voltage fluctuation;the proposed braking energy utilization scheme has certain advantages on energy recovery and DC bus voltage stabilization compared with other single-form schemes;the proposed power management strategy can correctly allocate the reference power of each system with a lower construction cost.
基金the National Natural Science Foundation of China(52072081)the Key Project of Science and Technology of Guangxi(2023AA19005)Guangxi Manufacturing Systems and Advanced Manufacturing Technology Key Laboratory Director Fund(22-050-44-S015).
文摘Because the standard four-stage operation and con-trol strategy cannot fully utilize the gravitational potential energy of a train operating on a long and steep downhill segment,this paper further improves the method for train operation and control strategy.The improved operation includes three stages of acceleration,coasting-speed limit cruising,and brak-ing.Taking the speed limit,time limit,and distance limit as the constraints,the coasting condition switching point,braking condition switching point,traction coefficient,and braking force coefficient are used as the decision variables.Then,an improved train traction energy consumption model is constructed,and an improved differential evolution algorithm is designed to solve this model.The improved method is used to simulate two long and steep downhill segments of the Nanning metro.The results show that the improved method can meet the requirements of speed limit,time limit,and distance limit.Compared with the standard four-stage operation,the improved train operation and control strategy can reduce train energy consumption by more than 40%on the two long and steep downhill segments;compared with other similar algorithms,the improved algorithm is more suitable for solving the model.
基金supported by Talents Funds for Basic Scientific Research Business Expenses of Central Colleges and Universities (Grant No.2021RC228)Special Funds for Basic Scientific Research Business Expenses of Central Colleges and Universities (Grant No.2021YJS103).
文摘Purpose-This study aims to improve the passenger accessibility of passenger demands in the end-ofoperation period.Design/methodology/approach-A mixed integer nonlinear programming model for last train timetable optimization of the metro was proposed considering the constraints such as the maximum headway,the minimum headway and the latest end-of-operation time.The objective of the model is to maximize the number of reachable passengers in the end-of-operation period.A solution method based on a preset train service is proposed,which significantly reduces the variables of deciding train services in the original model and reformulates it into a mixed integer linear programming model.Findings-The results of the case study of Wuhan Metro show that the solution method can obtain highquality solutions in a shorter time;and the shorter the time interval of passenger flow data,the more obvious the advantage of solution speed;after optimization,the number of passengers reaching the destination among the passengers who need to take the last train during the end-of-operation period can be increased by 10%.Originality/value-Existing research results only consider the passengers who take the last train.Compared with previous research,considering the overall passenger demand during the end-of-operation period can make more passengers arrive at their destination.Appropriately delaying the end-of-operation time can increase the proportion of passengers who can reach the destination in the metro network,but due to the decrease in passenger demand,postponing the end-of-operation time has a bottleneck in increasing the proportion of passengers who can reach the destination.
基金supported by the National Natural Science Foundation of China (Nos. 61503020, 61403020 and U1434209)the Beijing Laboratory of Urban Rail Transit, the Beijing Key Laboratory of Urban Rail Transit Automation and Controlthe Major Program of Beijing Municipal Science & Technology Commission under Grant Z161100001016006
文摘In large cities with heavily congested metro lines, unexpected disturbances often occur, which may cause severe delay of multiple trains, blockage of partial lines, and reduction of passenger service. Metro dispatchers have taken a practical strategy of rescheduling the timetable and adding several backup trains in storage tracks to alleviate waiting passengers from crowding the platforms and recover from such disruptions. In this study,we first develop a mixed integer programming model to determine the optimal train rescheduling plan with considerations of in-service and backup trains. The aim of train rescheduling is to frequently dispatch trains to evacuate delayed passengers after the disruption. Given the nonlinearity of the model, several linearization techniques are adapted to reformulate the model into an equivalent linear model that can be easily handled by the optimization software. Numerical experiments are implemented to verify the effectiveness of the proposed train rescheduling approach.
文摘钢轨波磨作为地铁线路中最为常见的轨道损伤问题之一,始终未得到根本性的解决。为研究不同轨道结构形式产生钢轨波磨后车辆内部振动噪声以及轨道结构振动的时频域特性,探究钢轨波磨对车辆和轨道的影响,对某地铁线路进行现场动静态测试,获取了钢轨波磨激励下车辆内部的振动和噪声响应以及轨道各部件的振动响应,使用时域指标统计、1/3倍频程谱分析等方法分析轨道振动响应特征和车内振动及噪声响应特征。结果表明:在小半径曲线地段,浮置板轨道产生了特征波长约为200 mm的钢轨波磨,整体道床轨道产生了特征波长约为60 mm的钢轨波磨;浮置板轨道的钢轨、道床板、隧道壁振动加速度有效值分别是整体道床的1.8、5.8倍及0.3倍;钢轨波磨对轨道振动的影响主要体现在中高频范围,在300~400 Hz附近,浮置板轨道振级从钢轨至隧道壁共衰减66 d B,而整体道床共衰减49 d B;列车通过测试区域时,转向架上方与客室中部垂、纵向振动加速度有效值基本一致,而客室中部横向振动加速度有效值约为转向架上方的2倍;车内转向架位置处的异常振动主要来源于钢轨波磨的激励,且短波长波磨所激励的车内振动及噪声更加剧烈。因此,地铁钢轨波磨产生后在轨道及车辆的振动噪声响应中均占主要成分,应及时对钢轨进行打磨处理,研究结果可为地铁工务维修提供理论指导。