In this paper, the bolt- and cable-supported structures mainly refer to anchored cables, anchored bolts, soil nails and other commonly used reinforcing and supporting structures in geotechnical engineering, as well as...In this paper, the bolt- and cable-supported structures mainly refer to anchored cables, anchored bolts, soil nails and other commonly used reinforcing and supporting structures in geotechnical engineering, as well as reinforced soil structures in permanent works. They are often used in combination, or formed into composite bolt-and cable-supported structures, with other traditional construction methods and relevant measures. Distinct characteristics of such structures are that they are most often invisible, exposed to more severe underground corrosive environments and with strict durability requirements. A number of serious durability problems of underground structures are discussed and major achievements and advances in China and abroad in terms of durability and reinforcement measures for underground structures are reviewed, followed by comprehensive analyses. Some suggestions for those problems are put forward.展开更多
The Hybrid A-Frame Micropile/MSE (mechanically stabilized earth) Wall suitable for mountain roadways is put forward in this study: a pair of vertical and inclined micropiles goes through the backfill region of a hi...The Hybrid A-Frame Micropile/MSE (mechanically stabilized earth) Wall suitable for mountain roadways is put forward in this study: a pair of vertical and inclined micropiles goes through the backfill region of a highway MSE Wall from the road surface and are then anchored into the foundation. The pile cap and grade beam are placed on the pile tops, and then a road barrier is connected to the grade beam by connecting pieces. The MSE wall's global stability, local stability and impact resistance of the road barrier can be enhanced simultaneously by this design. In order to validate the serviceability of the hybrid A-frame micropile/MSE wall and the reliability of the numerical method, scale model tests and a corresponding numerical simulation were conducted. Then, the seismic performance of the MSE walls before and after reinforcement with micropiles was studied comparatively through numerical methods. The results indicate that the hybrid A-frame micropile/ MSE wall can effectively control earthquake-induced deformation, differential settlement at the road surface, bearing pressure on the bottom and acceleration by means of a rigid-soft combination of micropiles and MSE. The accumulated displacement under earthquakes with amplitude of 0.1-0.5 g is reduced by 36.3%-46.5%, and the acceleration amplification factor on the top of the wall is reduced by 13.4%, 15.7% and 19.3% based on 0.1, 0.3 and 0.5 g input earthquake loading, respectively, In addition, the earthquake-induced failure mode of the MSE wall in steep terrain is the sliding of the MSE region along the backslope, while the micropiles effectively control the sliding trend. The maximum earthquake-induced pile bending moment is in the interface between MSE and slope foundation, so it is necessary to strengthen the reinforcement of the pile body in the interface. Hence, it is proven that the hybrid A-frame micropile/MSE wall system has good seismic performance.展开更多
This study aims to analyze seismic damage of reinforced outlet piers of arch dams by the nonlinear finite element (FE) sub-model method. First, the dam-foundation system is modeled and analyzed, in which the effects...This study aims to analyze seismic damage of reinforced outlet piers of arch dams by the nonlinear finite element (FE) sub-model method. First, the dam-foundation system is modeled and analyzed, in which the effects of infinite foundation, contraction joints, and nonlinear concrete are taken into account. The detailed structures of the outlet pier are then simulated with a refined FE model in the sub-model analysis. In this way the damage mechanism of the plain (unreinforced) outlet pier is analyzed, and the effects of two reinforcement measures (i.e., post-tensioned anchor cables and reinforcing bar) on the dynamic damage to the outlet pier are investigated comprehensively. Results show that the plain pier is damaged severely by strong earthquakes while implementation of post-tensioned anchor cables strengthens the pier effectively. In addition, radiation damping strongly alleviates seismic damage to the piers.展开更多
Electrochemical techniques of the corrosion measurements of reinforcing steeI in concrete have been evaluated. These techniques include half-cell potential measurements, impressed voltage method, impressed current met...Electrochemical techniques of the corrosion measurements of reinforcing steeI in concrete have been evaluated. These techniques include half-cell potential measurements, impressed voltage method, impressed current method and potentiostatic polarization technique. The results of corrosion behaviour of the steel in both 5%NaCl and 5%MgSO4 show that each electrochemical technique provides some information about the condition of the steel bar or the corrosivity of the environment being evaluated, yet none provides a complete data regarding the corrosion resistance of reinforcing steel in aggressive media展开更多
Check dams are widely used throughout the world to tackle soil and water lOSS.However,the ffequency of extreme rainfall events has increased owing to global climate change and the main structure of check dam is gradua...Check dams are widely used throughout the world to tackle soil and water lOSS.However,the ffequency of extreme rainfall events has increased owing to global climate change and the main structure of check dam is gradually aging.which lead to an increase in the failure risk ofcheck dams.Thus.it is necessary to carry out the study on failure risk diagnosis and assessment of check dams.In the study,machine learning algorithms(ML).including random forests(RF).support vector machine(SVM),and logistic regression(LR).were used to integrate the environmental and engineering factors and then assess the risk of check dam failure due to the“7.26”rainstorm on Iuly 26.2017,in the Chabagou watershed.10cated in the hilly—gully region of the Loess Plateau.China.To veri~the generalizability of the model in this study。these models were used for the Wangmaogou catchment north of the Loess Plateau.The accuracy assessment by the receiver operating Characteristic fROCl curve indicated that the RF model with an area under the ROC curve fAUCl greater than 0.89 was the most precise model and had a higher general—ization ability.In addition.the model dataset was relatively smalI and easy to obtain.which make the risk modeling of check dam failure in the study has the potential for application in other regions.In the RF model.each factor selected was confirmed to be important,and the importance values for engineering factors were generally higher than those for the environmental factors.The risk map of check dam failure in the RF modelindicated that 56.34%of check dams in the study area had very high and high risks of dam failure under high—intensity rainfall in 2017.Based on the importance of factors and the risk map of check dam failure.the prevention and control measures for reducing the risk of check dam failure and promoting the construction of check dam are proposed.These proposals provide a scientific basis for the reinforcement of check dams and the future layout of check dams in the Chinese Loess Plateau.展开更多
Mountain road tunnels are prone to water leakage and lining corrosion under the complex geological conditions and corrosive envi-ronments,which will reduce the strength of the lining structure until it loses its load-...Mountain road tunnels are prone to water leakage and lining corrosion under the complex geological conditions and corrosive envi-ronments,which will reduce the strength of the lining structure until it loses its load-bearing capacity;eventually,the definitive lining will need to be replaced.In this paper,a highway tunnel in a mountainous area in Southwest China is taken as an example.Field investi-gation found that the tunnel was seriously corroded by sulfate,the strength of the definitive lining decreased,and large-scale cracks and spalling appeared on the surface,so the operator decided to replace the definitive lining by the method of interval replacement.Based on the data obtained from drilling and coring,a numerical model of long-distance replacement of the definitive lining of the damaged tunnel is established.First,the back analysis of the calculation parameters is carried out,and the modified calculation results are com-pared with the field monitoring results for verification.Then,the deformation trend of the tunnel and the development of the plastic zone during the process of long-distance replacement of the definitive lining are studied.Finally,the construction scheme is optimized.Numer-ical analysis results show that the replacement of the definitive lining of the tunnel mainly leads to the settlement of the arch crown and the uplift of the inverted arch.The deformation of the tunnel shows two rapid growth stages and two stable stages during the replace-ment process;after replacement,the deformation of the arch crown and the inverted arch is divided into two buffer zones and one stable zone.In the progress of the replacement of the definitive lining,the plastic zone does not change.Regarding the reinforcement measures,with the increase in the grouting range,the grouting efficiency decreases,and the effect of the temporary steel arch on controlling the overall deformation is not obvious.The length of the replacement of the single section should be determined according to the geological conditions of the replacement section and the monitoring data during construction.The research results can provide a reference for sim-ilar projects for the replacement of the definitive lining.展开更多
基金Supported by the National Natural Science Foundation of China (50279054 and 10772199)
文摘In this paper, the bolt- and cable-supported structures mainly refer to anchored cables, anchored bolts, soil nails and other commonly used reinforcing and supporting structures in geotechnical engineering, as well as reinforced soil structures in permanent works. They are often used in combination, or formed into composite bolt-and cable-supported structures, with other traditional construction methods and relevant measures. Distinct characteristics of such structures are that they are most often invisible, exposed to more severe underground corrosive environments and with strict durability requirements. A number of serious durability problems of underground structures are discussed and major achievements and advances in China and abroad in terms of durability and reinforcement measures for underground structures are reviewed, followed by comprehensive analyses. Some suggestions for those problems are put forward.
基金National Natural Science Foundation of China under Grant No.51609040Natural Science Foundation of Fujian Province under Grant No.2016J05112Natural Science Foundation of Fujian Province under Grant No.2015J01158
文摘The Hybrid A-Frame Micropile/MSE (mechanically stabilized earth) Wall suitable for mountain roadways is put forward in this study: a pair of vertical and inclined micropiles goes through the backfill region of a highway MSE Wall from the road surface and are then anchored into the foundation. The pile cap and grade beam are placed on the pile tops, and then a road barrier is connected to the grade beam by connecting pieces. The MSE wall's global stability, local stability and impact resistance of the road barrier can be enhanced simultaneously by this design. In order to validate the serviceability of the hybrid A-frame micropile/MSE wall and the reliability of the numerical method, scale model tests and a corresponding numerical simulation were conducted. Then, the seismic performance of the MSE walls before and after reinforcement with micropiles was studied comparatively through numerical methods. The results indicate that the hybrid A-frame micropile/ MSE wall can effectively control earthquake-induced deformation, differential settlement at the road surface, bearing pressure on the bottom and acceleration by means of a rigid-soft combination of micropiles and MSE. The accumulated displacement under earthquakes with amplitude of 0.1-0.5 g is reduced by 36.3%-46.5%, and the acceleration amplification factor on the top of the wall is reduced by 13.4%, 15.7% and 19.3% based on 0.1, 0.3 and 0.5 g input earthquake loading, respectively, In addition, the earthquake-induced failure mode of the MSE wall in steep terrain is the sliding of the MSE region along the backslope, while the micropiles effectively control the sliding trend. The maximum earthquake-induced pile bending moment is in the interface between MSE and slope foundation, so it is necessary to strengthen the reinforcement of the pile body in the interface. Hence, it is proven that the hybrid A-frame micropile/MSE wall system has good seismic performance.
基金National Natural Science Foundation of China under Grant Nos.51179093 and 91215301Specialized Research Fund for the Doctoral Program of Higher Education under Grant No.20130002110032
文摘This study aims to analyze seismic damage of reinforced outlet piers of arch dams by the nonlinear finite element (FE) sub-model method. First, the dam-foundation system is modeled and analyzed, in which the effects of infinite foundation, contraction joints, and nonlinear concrete are taken into account. The detailed structures of the outlet pier are then simulated with a refined FE model in the sub-model analysis. In this way the damage mechanism of the plain (unreinforced) outlet pier is analyzed, and the effects of two reinforcement measures (i.e., post-tensioned anchor cables and reinforcing bar) on the dynamic damage to the outlet pier are investigated comprehensively. Results show that the plain pier is damaged severely by strong earthquakes while implementation of post-tensioned anchor cables strengthens the pier effectively. In addition, radiation damping strongly alleviates seismic damage to the piers.
文摘Electrochemical techniques of the corrosion measurements of reinforcing steeI in concrete have been evaluated. These techniques include half-cell potential measurements, impressed voltage method, impressed current method and potentiostatic polarization technique. The results of corrosion behaviour of the steel in both 5%NaCl and 5%MgSO4 show that each electrochemical technique provides some information about the condition of the steel bar or the corrosivity of the environment being evaluated, yet none provides a complete data regarding the corrosion resistance of reinforcing steel in aggressive media
基金financial support was provided by National Natural Science Foundation of China(U2243213)Jianqiao Han reports financial support was provided by National Natural Science Foundation of China(42177327)Jianqiao Han reports financial support was provided by National Natural Science Foundation of China(U2243212).
文摘Check dams are widely used throughout the world to tackle soil and water lOSS.However,the ffequency of extreme rainfall events has increased owing to global climate change and the main structure of check dam is gradually aging.which lead to an increase in the failure risk ofcheck dams.Thus.it is necessary to carry out the study on failure risk diagnosis and assessment of check dams.In the study,machine learning algorithms(ML).including random forests(RF).support vector machine(SVM),and logistic regression(LR).were used to integrate the environmental and engineering factors and then assess the risk of check dam failure due to the“7.26”rainstorm on Iuly 26.2017,in the Chabagou watershed.10cated in the hilly—gully region of the Loess Plateau.China.To veri~the generalizability of the model in this study。these models were used for the Wangmaogou catchment north of the Loess Plateau.The accuracy assessment by the receiver operating Characteristic fROCl curve indicated that the RF model with an area under the ROC curve fAUCl greater than 0.89 was the most precise model and had a higher general—ization ability.In addition.the model dataset was relatively smalI and easy to obtain.which make the risk modeling of check dam failure in the study has the potential for application in other regions.In the RF model.each factor selected was confirmed to be important,and the importance values for engineering factors were generally higher than those for the environmental factors.The risk map of check dam failure in the RF modelindicated that 56.34%of check dams in the study area had very high and high risks of dam failure under high—intensity rainfall in 2017.Based on the importance of factors and the risk map of check dam failure.the prevention and control measures for reducing the risk of check dam failure and promoting the construction of check dam are proposed.These proposals provide a scientific basis for the reinforcement of check dams and the future layout of check dams in the Chinese Loess Plateau.
基金supported by the National Natural Science Foundation of China,China(Grant Nos.41972266,52104076,and 12102230)the China Postdoctoral Science Foundation,China(Grant No.2022M711862).
文摘Mountain road tunnels are prone to water leakage and lining corrosion under the complex geological conditions and corrosive envi-ronments,which will reduce the strength of the lining structure until it loses its load-bearing capacity;eventually,the definitive lining will need to be replaced.In this paper,a highway tunnel in a mountainous area in Southwest China is taken as an example.Field investi-gation found that the tunnel was seriously corroded by sulfate,the strength of the definitive lining decreased,and large-scale cracks and spalling appeared on the surface,so the operator decided to replace the definitive lining by the method of interval replacement.Based on the data obtained from drilling and coring,a numerical model of long-distance replacement of the definitive lining of the damaged tunnel is established.First,the back analysis of the calculation parameters is carried out,and the modified calculation results are com-pared with the field monitoring results for verification.Then,the deformation trend of the tunnel and the development of the plastic zone during the process of long-distance replacement of the definitive lining are studied.Finally,the construction scheme is optimized.Numer-ical analysis results show that the replacement of the definitive lining of the tunnel mainly leads to the settlement of the arch crown and the uplift of the inverted arch.The deformation of the tunnel shows two rapid growth stages and two stable stages during the replace-ment process;after replacement,the deformation of the arch crown and the inverted arch is divided into two buffer zones and one stable zone.In the progress of the replacement of the definitive lining,the plastic zone does not change.Regarding the reinforcement measures,with the increase in the grouting range,the grouting efficiency decreases,and the effect of the temporary steel arch on controlling the overall deformation is not obvious.The length of the replacement of the single section should be determined according to the geological conditions of the replacement section and the monitoring data during construction.The research results can provide a reference for sim-ilar projects for the replacement of the definitive lining.