期刊文献+
共找到3,120篇文章
< 1 2 156 >
每页显示 20 50 100
Fatigue Crack Propagation Law of Corroded Steel Box Girders in Long Span Bridges
1
作者 Ying Wang Longxiao Chao +1 位作者 Jun Chen Songbai Jiang 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第7期201-227,共27页
In order to investigate the fatigue performance of orthotropic anisotropic steel bridge decks,this study realizes the simulation of the welding process through elastic-plastic finite element theory,thermal-structural ... In order to investigate the fatigue performance of orthotropic anisotropic steel bridge decks,this study realizes the simulation of the welding process through elastic-plastic finite element theory,thermal-structural sequential coupling,and the birth-death element method.The simulated welding residual stresses are introduced into the multiscale finite element model of the bridge as the initial stress.Furthermore,the study explores the impact of residual stress on crack propagation in the fatigue-vulnerable components of the corroded steel box girder.The results indicate that fatigue cracks at the weld toe of the top deck,the weld root of the top deck,and the opening of the transverse diaphragm will not propagate under the action of a standard vehicle load.However,the inclusion of residual stress leads to the propagation of these cracks.When considering residual stress,the fatigue crack propagation paths at the weld toe of the transverse diaphragm and the U-rib weld toe align with those observed in actual bridges.In the absence of residual stress,the cracks at the toe of the transverse diaphragm with a 15%mass loss rate are categorized as type I cracks.Conversely,when residual stress is considered,these cracks become I-II composite cracks.Residual stress significantly alters the cumulative energy release rate of the three fracturemodes.Therefore,incorporating the influence of residual stress is essential when assessing the fatigue performance of corroded steel box girders in long-span bridges. 展开更多
关键词 Residual stress crack propagation corroded steel box girder cumulative energy release rate
下载PDF
Estimating extreme temperature differences in steel box girder using long-term measurement data 被引量:5
2
作者 丁幼亮 王高新 《Journal of Central South University》 SCIE EI CAS 2013年第9期2537-2545,共9页
The extreme temperature differences in fiat steel box girder of a cable-stayed bridge were studied.Firstly,by using the long-term measurement data collected by the structural health monitoring system installed on the ... The extreme temperature differences in fiat steel box girder of a cable-stayed bridge were studied.Firstly,by using the long-term measurement data collected by the structural health monitoring system installed on the Runyang Cable-stayed Bridge,the daily variations as well as seasonal ones of measured temperature differences in the box girder cross-section area were summarized.The probability distribution models of temperature differences were further established and the extreme temperature differences were estimated with a return period of 100 years.Finally,the temperature difference models in cross-section area were proposed for bridge thermal design.The results show that horizontal temperature differences in top plate and vertical temperature differences between top plate and bottom plate are considerable.All the positive and negative temperature differences can be described by the weighted sum of two Weibull distributions.The maximum positive and negative horizontal temperature differences in top plate are 10.30 ℃ and -13.80 ℃,respectively.And the maximum positive and negative vertical temperature differences between top plate and bottom plate are 17.30 ℃ and-3.70 ℃,respectively.For bridge thermal design,there are two vertical temperature difference models between top plate and bottom plate,and six horizontal temperature difference models in top plate. 展开更多
关键词 structural health monitoring cable-stayed bridge steel box girder temperature difference extreme value analysis
下载PDF
Fatigue Performance of Orthotropic Steel Decks in Super-Wide Steel Box Girder Considering Transverse Distribution of Vehicle Load 被引量:2
3
作者 Xudong Wang Changqing Miao +1 位作者 Mao Yang Youliang Ding 《Structural Durability & Health Monitoring》 EI 2021年第4期299-316,共18页
This study presents an investigation on the fatigue analysis of four types of details on orthotropic steel decks(OSDs)for a cable-stayed super-wide steel box girder bridge based on finite-element analysis(FEA)with veh... This study presents an investigation on the fatigue analysis of four types of details on orthotropic steel decks(OSDs)for a cable-stayed super-wide steel box girder bridge based on finite-element analysis(FEA)with vehicle transverse distribution model(VTDM).A high-fidelity 3D FE model verified by the static load test is established to satisfy the fatigue analysis accuracy.The stress behavior of super-wide steel box girders under the vehicle load at different lane locations is investigated.Then,considering the effect of VTDM,the fatigue life analysis of four typical details is performed using the Miner cumulative damage rule.The results show that the vehicle transverse location has a great influence on the stress behavior of details with sharp influence surface,and the stress ranges in the outermost lane are larger than those in other lanes,indicating that the details of OSD in the outermost lane are prone to fatigue.The fatigue life analysis indicates that the diaphragm cutout is more prone to fatigue than other details,which should be carefully treated in bridge maintenance. 展开更多
关键词 Orthotropic steel deck steel box girder fatigue life vehicle transverse distribution model finite element analysis
下载PDF
The study of temperature effects on steel box girder for Taizhou Bridge 被引量:2
4
作者 Miao Changqing Feng Zhaoxiang +1 位作者 Wang Yichun Shi Changhua 《Engineering Sciences》 EI 2012年第3期81-87,共7页
Using the temperature gradient which was proposed by continuously measuring flat steel box girder of Runyang Bridge, temperature effects of flat steel box girder were studied for Taizhou Bridge. With three temperature... Using the temperature gradient which was proposed by continuously measuring flat steel box girder of Runyang Bridge, temperature effects of flat steel box girder were studied for Taizhou Bridge. With three temperature gradient models (JTG D60--2004 specification, BS5400 specification and the temperature gradient which was proposed in this paper), the stress of control sections was calculated by finite element program ANSYS. The calculated result indicated that the temperature gradient that was put forward in JTG D60-2004 specification and BS5400 specification for calculating the stress of fiat steel box girder was not suitable to apply to fiat steel box girder. The temperature gradient on flat steel box girder which was proposed in this paper was reasonable. 展开更多
关键词 suspension bridge flat steel box girder temperature gradient STRESS
下载PDF
Fatigue Performance Analysis and Evaluation for Steel Box Girder Based on Structural Health Monitoring System 被引量:1
5
作者 Meiling Zhuang Changqing Miao Rongfeng Chen 《Structural Durability & Health Monitoring》 EI 2020年第1期51-79,共29页
Taizhou Yangtze River Bridge as a long-span suspension bridge,the finite element model(FEM)of it is established using the ANSYS Software.The beam4 element is used to simulate the main beam to establish the“spine beam... Taizhou Yangtze River Bridge as a long-span suspension bridge,the finite element model(FEM)of it is established using the ANSYS Software.The beam4 element is used to simulate the main beam to establish the“spine beam”model of the Taizhou Yangtze River Bridge.The calculated low-order vibration mode frequency of the FEM is in good agreement with the completion test results.The model can simulate the overall dynamic response of the bridge.Based on the vehicle load survey,the Monte Carlo method is applied to simulate the traffic load flow.Then the overall dynamic response analysis of FEM is car-ried out.Taking the bending moment of the main beam as the control index,the fatigue sensitive section in the steel box girder of FEM is analyzed.Based on the strain time history data of steel box girder recorded by the structural health mon-itoring system(SHM),the true stress response of steel box girder under vehicle load is extracted.Taking the cumulative fatigue damage increment as the evalua-tion index,the fati gue performance evaluation of the steel box girders is con-ducted based on the collected health monitoring data.The fatigue effect of the beam section near the steel tower,especially the first section of the middle tower,is the key section of the fatigue analysis by health morning system,which is con-sistent with the calculation results of FEM. 展开更多
关键词 steel box girder FATIGUE stress response Monte Carlo method structural health monitoring system
下载PDF
Study in the design and manufacture process of the elastic cable anchor box in steel box girder of Taizhou Bridge 被引量:1
6
作者 Gu Bifeng Chen Ce Ding Lei 《Engineering Sciences》 EI 2011年第2期64-68,共5页
Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety c... Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety coefficient of the middle saddle, and improve the stress conditions of the middle pylon and decrease the deflection in the middle of the main girder, as well as the longitudinal displacement of the main girder caused by live loads. The anchorage boxes of the elastic cable are installed in the wind fairing outside the vertical web plate of the box girder. Two anchor boxes form a pair and are arranged parallelly. Eight anchor boxes are installed in the bridge. In this paper, the design scheme and the technical difficulties in manufacturing are briefly discussed with the precision control techniques. 展开更多
关键词 Taizhou Bridge steel box girder the elastic cables DESIGN manufacture techniques
下载PDF
GMA material design and construction quality control for asphalt pavement of steel box girder: Case study of the Hong Kong–Zhuhai–Macao Bridge 被引量:2
7
作者 Xiaoning Zhang 《Journal of Road Engineering》 2021年第1期63-72,共10页
To improve the quality of the Hong Kong–Zhuhai–Macao Bridge paving project,a new paving layer material,Guss-mastic asphalt(GMA),was proposed in this paper by combining the advantages of two types of cast asphalt mix... To improve the quality of the Hong Kong–Zhuhai–Macao Bridge paving project,a new paving layer material,Guss-mastic asphalt(GMA),was proposed in this paper by combining the advantages of two types of cast asphalt mixtures:mastic asphalt(MA)and Guss asphalt(GA).Based on the characteristics of GMA,to simulate its actual production process,this study developed a small-simulated cooker mixing equipment.Moreover,the flow degree,60C dynamic stability,and impact toughness were proposed to be used to evaluate the construction and ease,high temperature stability,and fatigue resistance of GMA cast asphalt mixtures,respectively.Moreover,the quality control standards for GMA paving materials by indoor tests,field trial mix GMA material performance tests,and accelerated loading tests were finalized.The study showed that the developed simulated cooker yielded consistent mixing results in the same working environment as the engineering cooker device.Increasing the coarse aggregate incorporation rate,coarsening the mastic epure(ME)gradation composition,and using a smaller oil to stone ratio can reduce the flowability of the GMA materials to varying degrees.The four-point bending fatigue life and impact toughness of the different GMA materials are correlated well.A mobility of<20 s,60C dynamic stability of 400–800 times/mm,15C impact toughness of400 N⋅mm,and cooker car mixing temperature control standard of 210C–230C form an appropriate control index system for the design and production of GMA cast asphalt mixtures.Simultaneously,accelerated loading tests verified the accuracy and reliability of the quality control index system that has been used in the GMA paving project of the Hong Kong–Zhuhai–Macao Bridge deck and has achieved good application results. 展开更多
关键词 Asphalt pavement Material design GMA steel box girder Construction quality control
下载PDF
Stress and noises of steel box girders in Sutong Bridge
8
作者 Xue Tao Chen Zhijian Dong Xuewu 《Engineering Sciences》 EI 2008年第4期53-59,共7页
Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in th... Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in the fluctuant and complex state and many meteorological factors,such as sunshine radiation,temperature and wind,have important influence on the change of stress of the steel box girders. According to the real-time weather data,the stress data after the process of wavelet denoising from representative measuring points in different weather conditions is picked to establish the stress response brought by meteorological factors with Layered Separation method,thereby basically eliminating the influence of meteorological factors on the stress of main girders,so that accurate and reliable stress data can be got for steel box girders adjustment and cable-tensioned construction control. 展开更多
关键词 Sutong Bridge cable-stayed bridge steel box girder wavelet denoising meteorological factor Layered Separation method
下载PDF
Research on overall assembling and welding process of steel box girder tuyere blocks of Taizhou Bridge
9
作者 Yan Shiguang Li Hongtao Wang Chao 《Engineering Sciences》 EI 2012年第3期21-25,共5页
This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding... This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding stress release in tuyere block assembling and welding without increasing the number of turns of the blocks and overhead welding, thus avoiding possible structural deformation due to excessive accumulation of internal welding stress, greatly reducing the repeated deformation and correction work during assembling and welding, and ensuring the weld seam quality and overall dimensions of tuvere blocks of Taizhou Bridze. 展开更多
关键词 Taizhou Bridge steel box girder TUYERE PROCESS
下载PDF
Design of steel box girder for Taizhou Yangtze River Highway Bridge
10
作者 Ding Lei Shan Hongwei Zhou Qing Zheng Benhui 《Engineering Sciences》 EI 2011年第2期57-63,共7页
Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technica... Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technically mature besides beautiful appearance. Straight web plates of the steel box girder in longitudinal direction are proposed in order to ensure the integrity of the steel box girder, and to keep the stress of the steel box girder continuous in the middle pylon, as well as to reduce the gradient of the middle pylon columns. The cross section of the box girder has one box with three cells. Solid-web diaphragm plate with good integrity and high torsional stiffness is adopted. The lifting lugs are utilized in the anchors of suspender cable. In this paper, selection of the cross section of the steel box girder, the general structure design, local structure design and main structure calculation results of Taizhou Yangtze River Bridge are introduced emphatically. 展开更多
关键词 Taizhou Yangtze River Highway Bridge three-pylon suspension bridge steel box girder DESIGN
下载PDF
Research on Construction Process of Steel Box Girder Bridge and Its Stress Analysis
11
作者 ChengKANG 《International Journal of Technology Management》 2015年第3期104-106,共3页
The paper introduce the construction method of large segment hosting and its difficulty, and drawing up corresponding liner and stress monitoring plan. The paper gives the calculation method of shear area for such a b... The paper introduce the construction method of large segment hosting and its difficulty, and drawing up corresponding liner and stress monitoring plan. The paper gives the calculation method of shear area for such a big cantilever thin-walled steel box girder section, namely the shear coefficient computation theory of Professor Hu Haichang, and the use of this shear area perfect beam element model, structure model and the experiment prove that the shell model is more consistent, given a certain reference for similar section project. 展开更多
关键词 Construction control Long-span steel box continuous girder Large segment hosting
下载PDF
Temperature gradient and its effect on flat steel box girder of long-span suspension bridge 被引量:19
12
作者 MIAO ChangQing SHI ChangHua 《Science China(Technological Sciences)》 SCIE EI CAS 2013年第8期1929-1939,共11页
The temperature field variation law and distribution characteristics of an orthotropic flat steel box girder under sunny conditions were analyzed through a field temperature test on the steel box girder of the operati... The temperature field variation law and distribution characteristics of an orthotropic flat steel box girder under sunny conditions were analyzed through a field temperature test on the steel box girder of the operational Runyang Yangtze River Bridge(the suspension bridge part).Function optimization fitting and error analysis of the test data were conducted.A temperature gradient distribution curve applicable to a hexagonal flat steel box girder was proposed.Based on the measurement results,the temperature effect of an orthotropic flat steel box girder was analyzed using finite element method and the effects of different temperature gradient modes on the mechanical characteristics and stress distribution of the steel box girder were compared.Under sunny conditions,heat conduction in the flat steel box girder structure shows distinct "box-room effect" characteristics,and the actual temperature gradient distribution is inconsistent with the one suggested by the existing standards.The thermal stress of a steel box girder calculated from the measured temperature gradient mode exceeds that calculated from the standard,and the intensity approximates that under the action of designed vehicle loads.The temperature-induced stress is distributed centrally near the manufacturing welds of the orthotropic steel box girder,which should be considered in design,construction and research.Results from this study could supplement the existing bridge and culvert design standards. 展开更多
关键词 long-span bridge flat steel box girder temperature gradient temperature effect
原文传递
Geometric state transfer method for construction control of a large-segment steel box girder with hoisting installation 被引量:6
13
作者 Jin-feng WANG Hua-wei XIANG +2 位作者 Jiang-tao ZHANG Tian-mei WU Rong-qiao XU 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2020年第5期382-391,共10页
This paper aims to address the problem of geometric state control of large-segment steel box girders in offshore hoisting during the construction of large-span bridges. First, the geometric state control indexes of a ... This paper aims to address the problem of geometric state control of large-segment steel box girders in offshore hoisting during the construction of large-span bridges. First, the geometric state control indexes of a large-segment steel box girder are determined, such as the manufacturing parameters of the top and bottom slabs, the width of the annular joint, and the support position. Second, the geometric state equations and state transfer matrixes of large-segment steel box girders under different conditions are deduced by taking the mileage and elevation of control points as basic state variables. In application of the geometric state transfer method in the construction control of the Hong Kong-Zhuhai-Macao Bridge, the width of the annular joint and the position parameters for the support of the large-segment steel box girder are predicted precisely. Moreover, the manufacturing parameters of the top and bottom slabs of the steel box girders are calculated reliably. The measured values show that the width of the annular joint is basically the same with the difference of less than 2 mm, the eccentricity of bridge support is less than 20 mm, and the elevation error of the bridge deck is within-10 mm to +15 mm, which meets the construction accuracy. Using the geometric state transfer method, the rapid and accurate installation of the Hong Kong-Zhuhai-Macao Bridge has been realized, demonstrating that the precise control of the geometric state of a steel box girder with ectopic installation and multi-state transition can be realized by using the geometric state transfer method. 展开更多
关键词 Large-segment steel box girder Offshore hoisting Construction control Geometric state Transfer matrix
原文传递
Refined analysis and construction parameter calculation for full-span erection of the continuous steel box girder bridge with long cantilevers 被引量:4
14
作者 Jin-feng WANG Tian-mei WU +2 位作者 Jiang-tao ZHANG Hua-wei XIANG Rong-qiao XU 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2020年第4期268-279,共12页
To accurately control the full-span erection of continuous steel box girder bridges with complex cross-sections and long cantilevers, both the augmented finite element method(A-FEM) and the degenerated plate elements ... To accurately control the full-span erection of continuous steel box girder bridges with complex cross-sections and long cantilevers, both the augmented finite element method(A-FEM) and the degenerated plate elements are adopted in this paper. The entire construction process is simulated by the A-FEM with the mesh-separation-based approximation technique, while the degenerated plate elements are constructed based on 3D isoparametric elements, making it suitable for analysis of a thin-walled structure. This method significantly improves computational efficiency by avoiding numerous degrees of freedom(DoFs) when analyzing complex structures. With characteristics of the full-span erection technology, the end-face angle of adjacent girder segments, the preset distance of girder segments from the design position, and the temperature difference are selected as control parameters, and they are calculated through the structural response of each construction stage. Engineering practice shows that the calculation accuracy of A-FEM is verified by field-measured results. It can be applied rapidly and effectively to evaluate the matching state of girder segments and the stress state of bearings as well as the thermal effect during full-span erection. 展开更多
关键词 Continuous steel box girder bridges Full-span erection Augmented finite element method(A-FEM) Construction control Construction parameter calculation
原文传递
Control measures for thermal effects during placement of span-scale girder segments on continuous steel box girder bridges 被引量:3
15
作者 Jin-feng WANG Jiang-tao ZHANG +1 位作者 Zhong-xuan YANG Rong-qiao XU 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2020年第4期255-267,共13页
In this study, we examined the thermal effects throughout the process of the placement of span-scale girder segments on a 6×110-m continuous steel box girder in the Hong Kong-Zhuhai-Macao Bridge. Firstly, when a ... In this study, we examined the thermal effects throughout the process of the placement of span-scale girder segments on a 6×110-m continuous steel box girder in the Hong Kong-Zhuhai-Macao Bridge. Firstly, when a span-scale girder segment is temporarily stored in the open air, temperature gradients will significantly increase the maximum reaction force on temporary supports and cause local buckling at the bottom of the girder segment. Secondly, due to the temperature difference of the girder segments before and after girth-welding, some residual thermal deflections will appear on the girder segments because the boundary conditions of the structure are changed by the girth-welding. Thirdly, the thermal expansion and thermal bending of girder segments will cause movement and rotation of bearings, which must be considered in setting bearings. We propose control measures for these problems based on finite element method simulation with field-measured temperatures. The local buckling during open-air storage can be avoided by reasonably determining the appropriate positions of temporary supports using analysis of overall and local stresses. The residual thermal deflections can be overcome by performing girth-welding during a period when the vertical temperature difference of the girder is within 1 °C, such as after 22:00. Some formulas are proposed to determine the pre-set distances for bearings, in which the movement and rotation of the bearings due to dead loads and thermal loads are considered. Finally, the feasibility of these control measures in the placement of span-scale girder segments on a real continuous girder was verified: no local buckling was observed during open-air storage;the residual thermal deflections after girth-welding were controlled within 5 mm and the residual pre-set distances of bearings when the whole continuous girder reached its design state were controlled within 20 mm. 展开更多
关键词 steel box girder Span-scale girder segments Construction process Thermal effects Control measures
原文传递
Study on the Mechanical Properties of Irregular Curved Steel Box Girder for City Viaduct
16
作者 XijunYin 《International Journal of Technology Management》 2014年第1期46-48,共3页
This paper deeply analyses the influence of different local tectonic on stress performance of spatial curved steel box Girder Bridge, using the finite element analysis software to establish space finite element model ... This paper deeply analyses the influence of different local tectonic on stress performance of spatial curved steel box Girder Bridge, using the finite element analysis software to establish space finite element model of this bridge, calculation and analysis were made on the bridge of the strength, stiffness. It has certain reference value for guiding engineering design, have a good foundation for the mechanical properties and stability of linear and nonlinear further study of curved steel box girder. 展开更多
关键词 elastic buckling analysis U rib bridge deck curved steel box girder
下载PDF
考虑风-温耦合的钢箱梁外形对温度效应影响研究
17
作者 黄旭 何佳骏 +2 位作者 丁文龙 朱金 李永乐 《重庆交通大学学报(自然科学版)》 北大核心 2025年第1期33-42,共10页
为了准确分析钢箱梁外形对截面温度特性的影响规律,提出了一种考虑钢箱梁周围局部风场与温度场相互作用的有限元分析方法,采用折减系数k来建立钢箱梁周围热边界层高度处风速U_(a)与远处气象站实测风速U的对应关系,对比分析了是否考虑风... 为了准确分析钢箱梁外形对截面温度特性的影响规律,提出了一种考虑钢箱梁周围局部风场与温度场相互作用的有限元分析方法,采用折减系数k来建立钢箱梁周围热边界层高度处风速U_(a)与远处气象站实测风速U的对应关系,对比分析了是否考虑风-温耦合对钢箱梁截面温度分布的影响,探讨了不同风嘴形式、截面宽高比、不同栏杆形式以及铺装厚度对钢箱梁截面温度分布的影响规律。研究表明:钢箱梁周围热边界层厚度处的风速U_(a)呈不均匀分布,且与远处风速U呈线性正相关;不考虑风-温耦合会明显低估钢箱梁顶板表面温度;钢箱梁截面的风嘴、截面宽高比、栏杆参数以及铺装厚度均会影响钢箱梁横截面的温度分布,改变截面的温差,因此,在桥梁的设计中,钢箱梁外形对截面温度分布的影响不可忽视。 展开更多
关键词 桥梁工程 钢箱梁 风-温耦合 数值模拟 热边界层
下载PDF
基于点云配准的钢箱梁数字化拼装方法
18
作者 王操 张子瑜 +3 位作者 吴军 梁钱 吉伯海 傅中秋 《现代交通与冶金材料》 2025年第1期15-21,共7页
基于全站仪检测结果修正钢箱梁模型并生成对应三维点云模型,利用RANSAC聚类算法,实现钢箱梁的拼接控制截面点云数据提取,并通过利用边缘准则(Angle Criterion)算法实现截面点云的边缘提取。结合拼接控制点集的快速四点一致配准(4PCS)和... 基于全站仪检测结果修正钢箱梁模型并生成对应三维点云模型,利用RANSAC聚类算法,实现钢箱梁的拼接控制截面点云数据提取,并通过利用边缘准则(Angle Criterion)算法实现截面点云的边缘提取。结合拼接控制点集的快速四点一致配准(4PCS)和快速全局配准(FGR)算法,完成钢箱梁拼接的配准拼装。结合实验室试验,通过拼装具有典型钢箱梁特征的钢结构试件,验证了本文提出钢箱梁智能化虚拟预拼装方法的精度和可行性。通过对比实体预拼装与虚拟预拼装在拼装效率和检测结果上的差异,分析了基于三维点云的装配式钢箱梁虚拟预拼装方法的诸多优势。 展开更多
关键词 钢箱梁 三维激光扫描 智能化 虚拟预拼装 三维点云数据
下载PDF
基于气象参数的钢箱梁竖向温度梯度模式
19
作者 张玉平 李思阳 +1 位作者 李传习 杨胜江 《公路交通科技》 北大核心 2025年第1期147-155,共9页
【目标】基于气象参数,利用统计分析和数值模拟相结合的方法,确定钢箱梁在日照环境下的温度梯度模式,以解决传统实桥温度试验方法工作量大、成本高的问题。【方法】以浙江省杭州江东大桥为例,根据热传导原理,借助有限元软件,建立了包含... 【目标】基于气象参数,利用统计分析和数值模拟相结合的方法,确定钢箱梁在日照环境下的温度梯度模式,以解决传统实桥温度试验方法工作量大、成本高的问题。【方法】以浙江省杭州江东大桥为例,根据热传导原理,借助有限元软件,建立了包含铺装层的钢箱梁二维数值模型,并将模型计算结果与实桥获取的少量温度测量数据进行对比,以验证模型的准确性和可靠性。【数据】基于杭州地区2014年至2016年夏季晴天及多云天的气象数据,借助有限元软件计算得到江东大桥带铺装层钢箱梁的日最大竖向正温差样本数据,并对样本数据进行统计分析,最终得到钢箱梁具有50 a重现期的竖向正温差标准值。【结果】温度计算值与实测值吻合较好,两者最大差值不超过1.5℃;江东大桥钢箱梁夏季晴天及多云天的日最大竖向正温差服从广义极值分布;江东大桥带铺装层钢箱梁竖向正温差标准值为16.82℃,该值小于按照相关桥梁设计规范计算得到的取值。【应用】不同地区气象条件差异使得规范统一的温度梯度模式无法完全涵盖中国所有区域,本研究方法为根据当地气象条件,得到适用于该地区钢箱梁的温度梯度模式提供了参考。 展开更多
关键词 桥梁工程 竖向温度梯度模式 数值分析 钢箱梁 概率模型
下载PDF
城区复杂条件下V形墩钢-混组合连续梁桥临时工程专项设计研究
20
作者 赵娥 黄辉 《科学技术创新》 2025年第2期142-145,共4页
本研究以双桥路道路工程施工为平台,开展城区复杂条件下V形墩钢-混组合连续梁桥支架体系研究。结合项目地形、地质特点及受限空间等多方面工况,利用三维建模及结构计算等手段综合考虑设计一套安全风险可控、经济价值高的临时工程体系,同... 本研究以双桥路道路工程施工为平台,开展城区复杂条件下V形墩钢-混组合连续梁桥支架体系研究。结合项目地形、地质特点及受限空间等多方面工况,利用三维建模及结构计算等手段综合考虑设计一套安全风险可控、经济价值高的临时工程体系,同时,结合施工工序,将下部结构V形墩、钢箱梁顶推、上部结构混凝土箱梁等主要结构的支架统筹考虑,周转利用,节约施工工期,降低施工成本。 展开更多
关键词 V形墩 一体化支架体系 受限空间 钢箱梁 拱圈拱架 地质条件
下载PDF
上一页 1 2 156 下一页 到第
使用帮助 返回顶部