期刊文献+
共找到2,141篇文章
< 1 2 108 >
每页显示 20 50 100
Experimental study and numerical analysis on bearing behaviors of super-long rock-socketed bored pile groups 被引量:2
1
作者 高睿 胡念 朱斌 《Journal of Southeast University(English Edition)》 EI CAS 2010年第4期597-602,共6页
A centrifuge modeling test and a three-dimensional finite element analysis(FEA)of super-long rock-socketed bored pile groups of the Tianxingzhou Bridge are proposed.Based on the similarity theory,different prototypi... A centrifuge modeling test and a three-dimensional finite element analysis(FEA)of super-long rock-socketed bored pile groups of the Tianxingzhou Bridge are proposed.Based on the similarity theory,different prototypical materials are simulated using different indicators in the centrifuge model.The silver sand,the shaft and the pile cap are simulated according to the natural density,the compressive stiffness and the bending stiffness,respectively.The finite element method(FEM)is implemented and analyzed in ANSYS,in which the stress field during the undisturbed soil stage,the boring stage,the concrete-casting stage and the curing stage are discussed in detail.Comparisons in terms of load-settlement,shaft axial force distribution and lateral friction between the numerical results and the test data are carried out to investigate the bearing behaviors of super-long rock-socketed bored pile groups under loading and unloading conditions.Results show that there is a good agreement between the centrifuge modeling tests and the FEM.In addition,the load distribution at the pile top is complicated,which is related to the stiffness of the cap,the corresponding assumptions and the analysis method.The shaft axial force first increases slightly with depth then decreases sharply,and the rate of decrease in rock is greater than that in sand and soil. 展开更多
关键词 super-long rock-socketed pile bored pile groups centrifuge modeling test finite element analysis
下载PDF
Reversible Oxygen-Rich Functional Groups Grafted 3D Honeycomb-Like Carbon Anode for Super-Long Potassium Ion Batteries 被引量:8
2
作者 Na Cheng Wang Zhou +2 位作者 Jilei Liu Zhigang Liu Bingan Lu 《Nano-Micro Letters》 SCIE EI CAS CSCD 2022年第9期132-146,共15页
Studies have found that oxygen-rich-containing functional groups in carbon-based materials can be used as active sites for the storage performance of K^(+),but the basic storage mechanism is still unclear.Herein,we co... Studies have found that oxygen-rich-containing functional groups in carbon-based materials can be used as active sites for the storage performance of K^(+),but the basic storage mechanism is still unclear.Herein,we construct and optimize 3D honeycomb-like carbon grafted with plentiful COOH/C=O functional groups(OFGC)as anodes for potassium ion batteries.The OFGC electrode with steady structure and rich functional groups can effectively contribute to the capacity enhancement and the formation of stable solid electrolyte interphase(SEI)film,achieving a high reversible capacity of 230 mAh g^(-1) at 3000 mA g^(-1) after 10,000 cycles(almost no capacity decay)and an ultra-long cycle time over 18 months at 100 mA g^(-1).The study results revealed the reversible storage mechanism between K^(+)and COOH/C=O functional groups by forming C-O-K compounds.Meanwhile,the in situ electrochemical impedance spectroscopy proved the highly reversible and rapid de/intercalation kinetics of K+in the OFGC electrode,and the growth process of SEI films.In particular,the full cells assembled by Prussian blue cathode exhibit a high energy density of 113 Wh kg^(-1) after 800 cycles(calculated by the total mass of anode and cathode),and get the light-emitting diodes lamp and ear thermometer running. 展开更多
关键词 Honeycomb-like super-long Carbon anode Potassium-ion batteries
下载PDF
Realizing super-long Cu_2O nanowires arrays for high-efficient water splitting applications with a convenient approach 被引量:2
3
作者 Nasori Nasori Tianyi Dai +6 位作者 Xiaohao Jia Agus Rubiyanto Dawei Cao Shengchun Qu Zhanguo Wang Zhijie Wang Yong Lei 《Journal of Semiconductors》 EI CAS CSCD 2019年第5期55-60,共6页
Nanowire(NW) structures is an alternative candidate for constructing the next generation photoelectrochemical water splitting system, due to the outstanding optical and electrical properties. NW photoelectrodes compar... Nanowire(NW) structures is an alternative candidate for constructing the next generation photoelectrochemical water splitting system, due to the outstanding optical and electrical properties. NW photoelectrodes comparing to traditional semiconductor photoelectrodes shows the comparatively shorter transfer distance of photo-induced carriers and the increase amount of the surface reaction sites, which is beneficial for lowering the recombination probability of charge carriers and improving their photoelectrochemical(PEC) performances. Here, we demonstrate for the first time that super-long Cu_2O NWs, more than 4.5 μm,with highly efficient water splitting performance, were synthesized using a cost-effective anodic alumina oxide(AAO) template method. In comparison with the photocathode with planar Cu_2O films, the photocathode with Cu_2O NWs demonstrates a significant enhancement in photocurrent, from –1.00 to –2.75 mA/cm^2 at –0.8 V versus Ag/AgCl. After optimization of the photoelectrochemical electrode through depositing Pt NPs with atomic layer deposition(ALD) technology on the Cu_2O NWs, the plateau of photocurrent has been enlarged to –7 mA/cm^2 with the external quantum yield up to 34% at 410 nm. This study suggests that the photoelectrode based on Cu_2O NWs is a hopeful system for establishing high-efficiency water splitting system under visible light. 展开更多
关键词 super-long nanowires P-TYPE CU2O AAO template PHOTOELECTROCHEMICAL water splitting
下载PDF
Axial bearing behavior of super-long piles in deep soft clay over stiff layers 被引量:3
4
作者 邹新军 赵明华 《Journal of Central South University》 SCIE EI CAS 2013年第7期2008-2016,共9页
In order to find out the bearing behavior of super-long piles located in deep soft clay over stiff layers around Dongting Lake, China, a test pile was first designed with the field loading test finished afterward. Bas... In order to find out the bearing behavior of super-long piles located in deep soft clay over stiff layers around Dongting Lake, China, a test pile was first designed with the field loading test finished afterward. Based on the measured test results, load transfer mechanism and bearing behavior of the pile shaft were discussed in detail. Then, by introducing a bi-linear model for shaft friction and the tri-linear model for pile tip resistance, respectively, the governing differential equation of pile soil system was set up by the load transfer method with the analytical solutions derived as well, taking into account the effect by stratified feature and various bearing conditions of subsoil, material nonlinearity, and the sediment under pile tip. Furthermore, formulas to determine the axial capacity of super-long piles by the pile top settlement were advised and applied to analyze the test pile. Good agreement between the predicted load settlement variations and the measured data is obtained to verify the validity of the present method. The results also show that, the axial bearing capacity of super-long piles should be controlled by the allowable pile top settlement, and buckling stability of the pile shaft should be paid attention as well. 展开更多
关键词 super-long pile SETTLEMENT load transfer model axial load capacity field test
下载PDF
Buckling analysis of super-long rock-socketed filling piles in soft soil area by element free Galerkin method 被引量:2
5
作者 邹新军 赵明华 刘光栋 《Journal of Central South University of Technology》 EI 2007年第6期858-863,共6页
In order to discuss the buckling stability of super-long rock-socketed filling piles widely used in bridge engineering in soft soil area such as Dongting Lake, the second stability type was adopted instead of traditio... In order to discuss the buckling stability of super-long rock-socketed filling piles widely used in bridge engineering in soft soil area such as Dongting Lake, the second stability type was adopted instead of traditional first type, and a newly invented numerical analysis method, i.e. the element-free Galerkin method (EFGM), was introduced to consider the non-concordant deformation and nonlinearity of the pile-soil interface. Then, based on the nonlinear elastic-ideal plastic pile-soil interface model, a nonlinear iterative algorithm was given to analyze the pile-soil interaction, and a program for buckling analysis of piles by the EFGM (PBAP-EFGM) and arc length method was worked out as well. The application results in an engineering example show that, the shape of pile top load-settlement curve obtained by the program agrees well with the measured one, of which the difference may be caused mainly by those uncertain factors such as possible initial defects of pile shaft and the eccentric loading during the test process. However, the calculated critical load is very close with the measured ultimate load of the test pile, and the corresponding relative error is only 5.6%, far better than the calculated values by linear and nonlinear incremental buckling analysis (with a greater relative error of 37.0% and 15.4% respectively), which also verifies the rationality and feasibility of the present method. 展开更多
关键词 super-long rock-socketed filling pile buckling analysis element free Galerkin method critical load
下载PDF
Challenges and Thoughts on Risk Management and Control for the Group Construction of a Super-Long Tunnel by TBM 被引量:16
6
作者 Mingjiang Deng 《Engineering》 2018年第1期112-122,共11页
The total length of the second stage of the water supply project in the northern areas of the Xinjiang Uygur Autonomous Region is 540 km, of which the total length of the tunnels is 516 km. The total tun- neling milea... The total length of the second stage of the water supply project in the northern areas of the Xinjiang Uygur Autonomous Region is 540 km, of which the total length of the tunnels is 516 km. The total tun- neling mileage is 569 km, which includes 49 slow-inclined shafts and vertical shafts. Among the tunnels constructed in the project, the Ka-Shuang tunnel, which is a single tunnel with a length of 283 kin, is cur- rently the longest water-conveyance tunnel in the world. The main tunnel of the Ka-Shuang tunnel is divided into 18 tunnel-boring machine (TBM) sections, and 34 drilling-and-blasting sections, with 91 tunnel faces. The construction of the Ka-Shuang tunnel has been regarded as an unprecedented challenge for project construction management, risk control, and safe and efficient construction; it has also pre- sented higher requirements for the design, manufacture, operation, and maintenance of the TBMs and their supporting equipment. Based on the engineering characteristics and adverse geological conditions, it is necessary to analyze the major problems confronted by the construction and systematically locate disaster sources. In addition, the risk level should be reasonably ranked, responsibility should be clearly identified, and a hierarchical-control mechanism should be established. Several techniques are put for- ward in this paper to achieve the objectives mentioned above; these include advanced geological prospecting techniques, intelligent tunneling techniques combined with the sensing and fusion of infor- mation about rock parameters and mechanical parameters, monitoring and early-warning techniques, and modern information technologies. The application of these techniques offers scientific guidance for risk control and puts forward technical ideas about improving the efficiency of safe tunneling. These techniques and ideas have great significance for the development of modern tunneling technolo- gies and research into major construction equipment. 展开更多
关键词 super-long tunnelsGroup construction by TBMRisk management and controlTechnical measures
下载PDF
Perturbation of symmetries for super-long elastic slender rods
7
作者 丁宁 方建会 《Chinese Physics B》 SCIE EI CAS CSCD 2011年第12期8-16,共9页
This paper analyses perturbations of Noether symmetry, Lie symmetry, and form invariance for super-long elastic slender rod systems. Criterion and structure equations of the symmetries after disturbance are proposed. ... This paper analyses perturbations of Noether symmetry, Lie symmetry, and form invariance for super-long elastic slender rod systems. Criterion and structure equations of the symmetries after disturbance are proposed. Considering perturbation of all infinitesimal generators, three types of adiabatic invariants induced by perturbation of symmetries for the system are obtained. 展开更多
关键词 super-long elastic slender rod SYMMETRY PERTURBATION adiabatic invariant
下载PDF
Structure properties and Noether symmetries for super-long elastic slender rod
8
作者 傅景礼 赵维加 翁玉权 《Chinese Physics B》 SCIE EI CAS CSCD 2008年第7期2361-2365,共5页
DNA is a nucleic acid molecule with double-helical structures that are special symmetrical structures attracting great attention of numerous researchers. The super-long elastic slender rod, an important structural mod... DNA is a nucleic acid molecule with double-helical structures that are special symmetrical structures attracting great attention of numerous researchers. The super-long elastic slender rod, an important structural model of DNA and other long-train molecules, is a useful tool in analysing the symmetrical properties and the stabilities of DNA. This paper studies the structural properties of a super-long elastic slender rod as a structural model of DNA by using Kirchhoff's analogue technique and presents the Noether symmetries of the model by using the method of infinitesimal transformation. Baaed on Kirchhoff's analogue it analyses the generalized Hamilton canonical equations. The infinitesimal transfornaationa with rcspect to the radial coordinnte, the gonarnlizod coordinates, and the Cluasi-momenta of 5he model are introduced. The Noether gymmetries and conserved qugntities of the model are obtained. 展开更多
关键词 super-long elastic slender rod Kirchhoff's analogue Noether symmetry conserved quantity
下载PDF
Electrochemical Introduction of Active Sites into Super-long Carbon Nanotubes for Enhanced Capacitance
9
作者 HU Yue ZHAO Yang +4 位作者 LI Yan XIE Xue-jun LI Hui DAI Li-ming QU Liang-ti 《Chemical Research in Chinese Universities》 SCIE CAS CSCD 2012年第2期302-307,共6页
Electrochemical cyclic voltammetric(CV) scan was applied to inducing the partial oxidation and defects of carbon nanotubes(CNTs).The electrochemically induced functional groups and physical defects were demonstrat... Electrochemical cyclic voltammetric(CV) scan was applied to inducing the partial oxidation and defects of carbon nanotubes(CNTs).The electrochemically induced functional groups and physical defects were demonstrated to show positive effects on the nanotube capacitance,as exemplified by super-long CNT arrays as model for the easy fabrication of CNT electrodes.Specifically,the initial hydrophobic nanotube surface becomes hydrophilic and a ten-time enhancement in capacitance is observed with respect to the pristine CNT sample.Thus,the electrochemical CV pretreatment can be used as an effective approach to activate the CNT surface for an enhanced electrochemical performance in capacitors,and many other advanced devices beyond capacitors,such as electrochemical sensors and batteries. 展开更多
关键词 Energy storage Electrochemical capacitor super-long carbon nanotube ELECTROCHEMISTRY DEFECT
下载PDF
Seismic performance evaluation for super-long span cable-stayed bridges
10
作者 Ye Aijun Wu Shouchang 《Engineering Sciences》 EI 2009年第1期23-29,共7页
Based on the capacity/demand(C/D)analysis of bridge components,and life cycle and performance based seismic design principles,a practical approach is developed for the seismic performance evaluation of super-long span... Based on the capacity/demand(C/D)analysis of bridge components,and life cycle and performance based seismic design principles,a practical approach is developed for the seismic performance evaluation of super-long span cable-stayed bridges.According to the approach,the seismic performance evaluation of the Sutong Bridge,which is a cable-stayed bridge with a main span of 1 088 m,is completed,and the practicality of the approach is validated.The earthquake resistance level for super-long span cable-stayed bridges is discussed,including the earthquake level,its corresponding structural performance and check indices.And a set of formula for capacity/demand ratio calculation of bridge components is proposed. 展开更多
关键词 super-long span cable-stayed bridges seismic performance capacity/demand analysis
下载PDF
Migration law of respirable dust on a super-long fully mechanized double-shearer working face
11
作者 Jia Min Fu Yingpeng +3 位作者 Yuan Yong Wei Hongmin Sun Song Li Jie 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第6期1109-1115,共7页
In order to understand the migration law of respirable dust and gain reasonable design parameters for dust control on a super-long double-shearer fully mechanized working face, this paper describes research carried ou... In order to understand the migration law of respirable dust and gain reasonable design parameters for dust control on a super-long double-shearer fully mechanized working face, this paper describes research carried out using a numerical simulation package(Fluent) based on gas-solid coupling dispersed multiphase flow model and field measurement to research different technology modes, dust distribution law at different intervals where shearers work in opposite directions on the lower 9303 face, No. 2 Jining Mine,Yankuang Coal Mining Co. Results show that the concentration of dust 3–6 m away from the shearers working in the same directions was large, while the impact area of respirable dust near the shearer increased significantly to 5–6 m with the distance between two shearers working in opposite directions.The concentration of dust on a double-shearer face was considerably higher than that of a face with one shear under the combined effect of wind speed on the face and disturbed wind around the shearer, while the dust concentration near the shearer on the return side was considerably higher than that on the inlet side. The concentration of dust on a double-shearer face along the airflow declined slowly so that dust was hard to control. Simulation results confirmed the results of field measurement, which could provide reference for dust prevention design. 展开更多
关键词 super-long working face Double-shearer Respirable dust Migration law Numerical simulation
下载PDF
Predictive analysis of stress regime and possible squeezing deformation for super-long water conveyance tunnels in Pakistan
12
作者 Wang Chenghu Bao Linhai 《International Journal of Mining Science and Technology》 SCIE EI 2014年第6期825-831,共7页
The prediction of the stress field of deep-buried tunnels is a fundamental problem for scientists and engineers. In this study, the authors put forward a systematic solution for this problem. Databases from the World ... The prediction of the stress field of deep-buried tunnels is a fundamental problem for scientists and engineers. In this study, the authors put forward a systematic solution for this problem. Databases from the World Stress Map and the Crustal Stress of China, and previous research findings can offer prediction of stress orientations in an engineering area. At the same time, the Andersonian theory can be used to analyze the possible stress orientation of a region. With limited in-situ stress measurements, the Hock-Brown Criterion can be used to estimate the strength of rock mass in an area of interest by utilizing the geotechnical investigation data, and the modified Sheorey's model can subsequently be employed to predict the areas' stress profile, without stress data, by taking the existing in-situ stress measurements as input parameters. In this paper, a case study was used to demonstrate the application of this systematic solution. The planned Kohala hydropower plant is located on the western edge of Qinghai-Tibet Plateau. Three hydro-fracturing stress measurement campaigns indicated that the stress state of the area is SH - Sh 〉 Sv or SH 〉Sv 〉 Sh. The measured orientation of Sn is NEE (N70.3°-89°E), and the regional orientation of SH from WSM is NE, which implies that the stress orientation of shallow crust may be affected by landforms. The modified Sheorey model was utilized to predict the stress profile along the water sewage tunnel for the plant. Prediction results show that the maximum and minimum horizontal principal stres- ses of the points with the greatest burial depth were up to 56.70 and 40.14 MPa, respectively, and the stresses of areas with a burial depth of greater than 500 m were higher. Based on the predicted stress data, large deformations of the rock mass surrounding water conveyance tunnels were analyzed. Results showed that the large deformations will occur when the burial depth exceeds 300 m. When the burial depth is beyond 800 m, serious squeezing deformations will occur in the surrounding rock masses, thus requiring more attention in the design and construction. Based on the application efficiency in this case study, this prediction method proposed in this paper functions accurately. 展开更多
关键词 super-long water conveyance tunnel In-situ stress state Squeezing deformation Prediction analysis Kohala hydropower plant
下载PDF
Key Technologies for Design of Changqing Yellow River Super-long Bridge of Zhengzhou Ji'nan HSR
13
作者 ZUO Jiaqiang ZHANG Shang +3 位作者 MA Chenlong WANG Zongfeng ZHANG Hai ZHENG Mingda(Translated) 《Chinese Railways》 2023年第2期3-11,共9页
Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge de... Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge. 展开更多
关键词 Zhengzhou-Ji'nan HSR Changqing Yellow River super-long Bridge partial cable stayed bridge multi-tower cable-stayed bridge multiple span and long connection bridge design
下载PDF
R■D Base of Super-long Afterglow Phosphors Established in Linxi
14
《China Rare Earth Information》 2005年第9期3-3,共1页
关键词 D Base of super-long Afterglow Phosphors Established in Linxi BASE
下载PDF
Parameter effects on the dynamic characteristics of a super-long-span triple-tower suspension bridge 被引量:14
15
作者 Hao WANG Ke-guan ZOU Ai-qun LI Chang-ke JIAO 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2010年第5期305-316,共12页
A 3D finite element model for the Taizhou Yangtze River Bridge,the first triple-tower long-span suspension bridge in China,is established based on the nonlinear finite element software ABAQUS,and the dynamic character... A 3D finite element model for the Taizhou Yangtze River Bridge,the first triple-tower long-span suspension bridge in China,is established based on the nonlinear finite element software ABAQUS,and the dynamic characteristics of the bridge are analyzed using the LANCZOS eigenvalue solution method. The study focuses on the effects of the vertical,lateral and torsional stiffness of the steel box girder,the rigid central buckle and the elastic restraints connecting the towers and the steel box girder on the dynamic characteristics of the triple-tower suspension bridge. Our results show that,in general,the dynamic characteristics of the triple-tower suspension bridge are similar to those of two-tower suspension bridges. The vertical,lateral and torsional stiffness of the steel box girder have different effects on the dynamic characteristics of triple-tower suspension bridges. The elastic re-straints have a more significant effect on the dynamic characteristics than the central buckle,and decreasing the stiffness of the elastic restraints results in the appearance of a longitudinal floating vibration mode of the bridge. Also,rigid central buckles have a greater influence on the dynamic characteristics of triple-tower suspension bridges than on those of two-tower suspension bridges. The results obtained could serve as a valuable numerical reference for analyzing and designing super-long-span triple-tower suspension bridges. 展开更多
关键词 Suspension bridge Taizhou Bridge Triple-tower Dynamic characteristics super-long-span
原文传递
Modified super-long down-regulation protocol improves fertilization and pregnancy in patients with poor ovarian responses 被引量:3
16
作者 ZHANG Hui-juan SONG Xue-ru +1 位作者 LU Rui XUE Feng-xia 《Chinese Medical Journal》 SCIE CAS CSCD 2012年第16期2837-2840,共4页
Background The successful end-point of in vitro fertilization (IVF) treatment is for a woman to give live birth. This outcome is based on various factors including adequate number of retrieved eggs. Failure to recru... Background The successful end-point of in vitro fertilization (IVF) treatment is for a woman to give live birth. This outcome is based on various factors including adequate number of retrieved eggs. Failure to recruit adequate follicles, from which the eggs are retrieved, is called a "poor response". How to improve the clinical pregnancy rates of poor responders was one of the tough problems for IVF. Methods The study involved 51 patients who responded poorly to high dose gonadotropin treatment in their previous cycles at our reproductive center, between April 2010 and February 2012. The previous cycle (group A) received routine long protocol; the subsequent cycle (group B) received modified super-long down-regulation protocol. The primary outcome of the study was the number of oocytes fertilized. The increase in the pregnancy rate was the secondary outcome. Differences between the groups were assessed by using Student's t test and Z2 test where appropriate. Results The patients' average age was (36.64±3.85) years. The mean duration of ovarian stimulation cycles of the group A patients was longer than those of the group B patients. The total dose of follicle-stimulating hormone (FSH) was significantly lower in the subsequent cycle. The peak value of serum estradiol on human chorionic gonadotrophin (hCG) day was lower in group A as compared with group B. The number of metaphase II oocytes recovered was significantly higher in group B. The cleavage rate in group A was significantly lower than in group B, 49 patients in group B reached embryo transfer stage, while 46 patients in group A reached this stage. Patients in group B received significantly more embryos per transfer as compared with group A. More pregnancies and more clinical pregnancies with fetal heart activity were achieved in group B. Conclusions This comparative trial shows that poor responder women undergoing repeated assisted reproduction treatment using modified super-long down-regulation protocol achieve more oocytes, leading to higher fertilization rate, compared to women receiving routine long protocol. Our study also showed that clinical pregnancy rate was significantly improved. 展开更多
关键词 poor responder controlled ovarian hyperstimulation routine longprotocol modified super-long down-regulation protocol in vitro fertilization
原文传递
Revised Super-long Down-regulation Protocol Improves the Outcome of Infertile Patients with Repeated Implantation Failure in IVF/ICSI-ET 被引量:2
17
作者 Min-feng SHI Tie ZHOU +10 位作者 Ying WANG Guang-hua CHEN Ming ZHU Jun OU Hui DU Tao-fei YAN Di SONG Ju-fen ZHENG Hui-qin ZHANG Ning HUI Ying-hao SUN 《Journal of Reproduction and Contraception》 CAS 2014年第2期89-96,共8页
Objective To investigate the outcome of revised super-long down-regulation protocol (RSDP) for in vitro fertilization / intracytoplasmic sperm injection-embryo transfer (1VF/1CS1-ET) in the special infertile pat... Objective To investigate the outcome of revised super-long down-regulation protocol (RSDP) for in vitro fertilization / intracytoplasmic sperm injection-embryo transfer (1VF/1CS1-ET) in the special infertile patients with repeated implantation failure (RIF). Methods Patients with RIF were divided into RSDP group and routine long downregulation protocol (RLDP) group. In RSDP group, gonadotropin releasing hormone agonist (GnRHa) was injected intramuscularly by 2.5 mg in mid-luteal phase for the ftrst time and 1.25 mg after 28 d; gonadotropin (Gn) was started 14 d later after the second GnRHa dose. IVF/ICSI-ET was performed according to the routine procedure. The clinical outcomes of RSDP group were compared with those of RLDP group. Results In RSDP group, the number of retrieved oocytes and valid embryos was significantly lower (P〈0.05); there were no significant differences about fertilization rate (P〉0. 05); both good-quality embryo rate and implantation rate were significantly increased (P〈0. 005); clinical pregnancy rate was obviously improved (P〈0. 05), as compared with RLDP group.Conclusion RSDP can improve the IVF outcomes significantly in RIF patients. 展开更多
关键词 implantation failure revised super-long down-regulation protocol (RSDP) routine long protocol in vitro fertilization (IVF)
原文传递
截至2023年底中国10km以上特长公路隧道统计与分析 被引量:5
18
作者 刘继国 崔庆龙 +1 位作者 李丹妮 罗刚 《隧道建设(中英文)》 CSCD 北大核心 2024年第1期189-198,I0057-I0066,共20页
在隧道行业相关单位的大力支持及既有统计数据的基础上,对截至2023年底中国已建成运营、正在建设、规划设计的共计74座长度10 km以上的特长公路隧道进行统计,其中,已建成运营特长公路隧道25座,正在建设特长公路隧道31座,规划设计特长公... 在隧道行业相关单位的大力支持及既有统计数据的基础上,对截至2023年底中国已建成运营、正在建设、规划设计的共计74座长度10 km以上的特长公路隧道进行统计,其中,已建成运营特长公路隧道25座,正在建设特长公路隧道31座,规划设计特长公路隧道18座。从隧道长度、所在省份、公路等级、地理位置、技术标准、施工工法、设计与施工单位等方面,对中国已建成运营、正在建设、规划设计的长度10 km以上的特长公路隧道建设情况进行分析,其中:长度在10~14.9 km的隧道共62座,长度在15~19.9 km的隧道共10座,长度大于20 km的隧道共2座;隧道主要集中在中国西南部,约占63%,四川省最多,其次是云南省;高速公路隧道达65座,占比约为88%;山岭公路隧道68座,水下隧道6座;隧道技术标准以双向4车道为主;隧道施工工法以钻爆法为主,近些年出现了TBM+钻爆组合工法;隧道设计单位主要有31家;隧道施工单位主要有52家。 展开更多
关键词 特长公路隧道 统计与分析
下载PDF
超长大跨度公铁合建桥梁结构体系研究 被引量:1
19
作者 王小飞 《铁道标准设计》 北大核心 2024年第1期87-95,共9页
新建甬舟铁路西堠门公铁两用大桥连接金塘岛和册子岛,桥位处海域宽2.7 km,最大水深93 m,地形复杂,桥梁设计难度大。为研究超长大跨度公铁合建桥梁合理结构体系,结合地形地质条件,选取主跨1500 m悬索桥、斜拉桥及斜拉悬索协作体系3种桥... 新建甬舟铁路西堠门公铁两用大桥连接金塘岛和册子岛,桥位处海域宽2.7 km,最大水深93 m,地形复杂,桥梁设计难度大。为研究超长大跨度公铁合建桥梁合理结构体系,结合地形地质条件,选取主跨1500 m悬索桥、斜拉桥及斜拉悬索协作体系3种桥型方案,对上部结构设计进行详细介绍,并从静力性能、动力性能、经济性能等方面对不同结构体系进行对比分析。研究表明:(1)与斜拉体系相比,协作体系桥可减小30%~50%的主梁内力和60%的桥塔内力,一定程度上解决了加劲梁承受巨大轴压力造成屈曲问题,并有效减小了桥塔规模;(2)与悬索桥相比,协作体系可减小50%的主缆内力,主缆钢丝和锚碇的工程量相应减小,施工难度得以降低,同时协作体系扭转频率更高,降低了结构在较低风速下发生涡激振动的可能性;(3)斜拉悬索协作体系能够充分发挥斜拉结构和悬索结构的组合优势,实现超大跨度的同时具有较大的纵向刚度和竖向刚度,满足铁路行车对结构刚度的要求;(4)对于主跨1500 m级超长大跨度公铁合建桥梁,斜拉悬索协作体系经济性更好。 展开更多
关键词 超长大跨度公铁合建桥 斜拉悬索协作体系 斜拉桥 悬索桥 桥梁结构体系
下载PDF
秦岭天台山超长公路隧道群关键技术创新与实践
20
作者 韩常领 富志鹏 +2 位作者 董长松 苟超 马志伟 《公路交通技术》 2024年第4期1-7,共7页
针对秦岭天台山超长公路隧道群在建设和运营过程中面临的工程建设难度大,运营管理复杂、安全风险高以及运营能耗高等诸多技术难题,围绕安全智慧运营、安全快速施工、单层衬砌支护、自然能源利用等方向,系统总结了秦岭山区特殊地质地形... 针对秦岭天台山超长公路隧道群在建设和运营过程中面临的工程建设难度大,运营管理复杂、安全风险高以及运营能耗高等诸多技术难题,围绕安全智慧运营、安全快速施工、单层衬砌支护、自然能源利用等方向,系统总结了秦岭山区特殊地质地形条件下32 km隧道群建设与运营过程中系列创新技术成果。主要结论:1)通过超长隧道群安全智慧运营技术创新与应用,破解山区超长连续公路隧道群运营安全保障难题;2)通过公路隧道安全快速施工技术创新与应用,突破超长大断面公路隧道机械化安全快速施工瓶颈;3)通过公路隧道单层衬砌支护技术创新与应用,构建硬质岩公路隧道单层衬砌支护体系;4)通过公路隧道利用自然能源技术推广应用,探索超长公路隧道绿色低碳运行。 展开更多
关键词 高速公路 超长隧道群 安全快速建造 智慧节能运营
下载PDF
上一页 1 2 108 下一页 到第
使用帮助 返回顶部