期刊文献+
共找到1,432篇文章
< 1 2 72 >
每页显示 20 50 100
Analysis of unlined pressure shafts and tunnels of selected Norwegian hydropower projects 被引量:2
1
作者 Chhatra Bahadur Basnet Krishna Kanta Panthi 《Journal of Rock Mechanics and Geotechnical Engineering》 CSCD 2018年第3期486-512,共27页
Norwegian hydropower industry has more than 100 years of experiences in constructing more than4000 km-long unlined pressure shafts and tunnels with maximum static head of 1047 m(equivalent to almost 10.5 MPa) reache... Norwegian hydropower industry has more than 100 years of experiences in constructing more than4000 km-long unlined pressure shafts and tunnels with maximum static head of 1047 m(equivalent to almost 10.5 MPa) reached at unlined pressure tunnel of Nye Tyin project. Experiences gained from construction and operation of these unlined pressure shafts and tunnels were the foundation to develop design criteria and principles applied in Norway and some other countries. In addition to the confinement criteria, Norwegian state-of-the-art design principle for unlined pressure shaft and tunnel is that the minor principal stress at the location of unlined pressure shaft or tunnel should be more than the water pressure in the shaft or tunnel. This condition of the minor principal stress is prerequisite for the hydraulic jacking/splitting not to occur through joints and fractures in rock mass. Another common problem in unlined pressure shafts and tunnels is water leakage through hydraulically splitted joints or pre-existing open joints. This article reviews some of the first attempts of the use of unlined pressure shaft and tunnel concepts in Norway, highlights major failure cases and two successful cases of significance, applies Norwegian criteria to the cases and reviews and evaluates triggering factors for failure.This article further evaluates detailed engineering geology of failure cases and also assesses common geological features that could have aggravated the failure. The minor principal stress is investigated and quantified along unlined shaft and tunnel alignment of six selected project cases by using threedimensional numerical model. Furthermore, conditions of failure through pre-existing open joints by hydraulic jacking and leakage are assessed by using two-dimensional fluid flow analysis. Finally, both favorable and unfavorable ground conditions required for the applicability of Norwegian confinement criteria in locating the unlined pressure shafts and tunnels for geotectonic environment different from that of Norway are highlighted. 展开更多
关键词 Hydropower projects Unlined pressure shafts and tunnels Minor principal stress Hydraulic jacking Water leakage
下载PDF
LONG AND DEEP DIVERSION TUNNELS OF 1^(ST) STAGE PROJECT IN WEST ROUTE OF SOUTH-NORTH WATER TRANSFER PROJECT
2
作者 Shen Fengsheng,Liu Xin (Reconnaissance,Planning,Design and Research Institute,Yellow River Construction Commission, Ministry of Water Resources, Zhengzhou 450003 China) 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2003年第9期1527-1532,共6页
West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze... West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze River to the upper reaches of the Yellow River. It is to be constructed in 3 stages, of which the 1st stage project includes delivering 4 billion m3 of water by gravity from two tributaries of Yalong River and three tributaries of Dadu River. The project consists of 5 dams,7 tunnels and a channel in series,with the dam height of 63~123 m and water transfer length of 260.3 km,of which the tunnels measure 244.1 km. The special climatic,environmental and geologic conditions make the project much more complicated in construction,especially 3 tunnels with the length longer than 50 km each create challenges to the technical requirements of engineering survey,design and construction. 展开更多
关键词 南水北调工程 西线工程 引水隧洞 TBM
下载PDF
Particle Swarm-Based Translation Control for Immersed Tunnel Element in the Hong Kong–Zhuhai–Macao Bridge Project 被引量:2
3
作者 LI Jun-jun YANG Xiao-jun +2 位作者 XIAO Ying-jie XU Bo-wei WU Hua-feng 《China Ocean Engineering》 SCIE EI CSCD 2018年第1期32-40,共9页
Immersed tunnel is an important part of the Hong Kong–Zhuhai–Macao Bridge(HZMB) project. In immersed tunnel floating, translation which includes straight and transverse movements is the main working mode. To decide ... Immersed tunnel is an important part of the Hong Kong–Zhuhai–Macao Bridge(HZMB) project. In immersed tunnel floating, translation which includes straight and transverse movements is the main working mode. To decide the magnitude and direction of the towing force for each tug, a particle swarm-based translation control method is presented for non-power immersed tunnel element. A sort of linear weighted logarithmic function is exploited to avoid weak subgoals. In simulation, the particle swarm-based control method is evaluated and compared with traditional empirical method in the case of the HZMB project. Simulation results show that the presented method delivers performance improvement in terms of the enhanced surplus towing force. 展开更多
关键词 immersed tunnel element translation control Hong Kong–Zhuhai–Macao Bridge(HZMB) project particle swarm optimization
下载PDF
Predicting geological hazards during tunnel construction 被引量:26
4
作者 Shucai Li Shuchen Li Qingsong Zhang Yiguo Xue Bin Liu Maoxin Su Zhechao Wang Shugang Wang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2010年第3期232-242,共11页
The complicated geological conditions and geological hazards are challenging problems during tunnel construction,which will cause great losses of life and property.Therefore,reliable prediction of geological defective... The complicated geological conditions and geological hazards are challenging problems during tunnel construction,which will cause great losses of life and property.Therefore,reliable prediction of geological defective features,such as faults,karst caves and groundwater,has important practical significances and theoretical values.In this paper,we presented the criteria for detecting typical geological anomalies using the tunnel seismic prediction(TSP) method.The ground penetrating radar(GPR) signal response to water-bearing structures was used for theoretical derivations.And the 3D tomography of the transient electromagnetic method(TEM) was used to develop an equivalent conductance method.Based on the improvement of a single prediction technique,we developed a technical system for reliable prediction of geological defective features by analyzing the advantages and disadvantages of all prediction methods.The procedure of the application of this system was introduced in detail.For prediction,the selection of prediction methods is an important and challenging work.The analytic hierarchy process(AHP) was developed for prediction optimization.We applied the newly developed prediction system to several important projects in China,including Hurongxi highway,Jinping II hydropower station,and Kiaochow Bay subsea tunnel.The case studies show that the geological defective features can be successfully detected with good precision and efficiency,and the prediction system is proved to be an effective means to minimize the risks of geological hazards during tunnel construction. 展开更多
关键词 tunnel projects geological hazards comprehensive prediction tunnel seismic prediction(TSP) ground penetrating radar(GPR) transient electromagnetic method(TEM) analytic hierarchy process(AHP)
下载PDF
Application of Low-penetration Concrete as the Protecting Layer in Wuhan Yangtse River Tunnel Tube
5
作者 杨雷 《Journal of Wuhan University of Technology(Materials Science)》 SCIE EI CAS 2006年第z1期157-161,共5页
Based on the Wuhan Yangtse River Tunnel Project, the low-penetration fiber concrete used in the protecting layer of Wuhan Yangtse River Tunnel tube has been studied in this paper. With the effect of silica fume, slag ... Based on the Wuhan Yangtse River Tunnel Project, the low-penetration fiber concrete used in the protecting layer of Wuhan Yangtse River Tunnel tube has been studied in this paper. With the effect of silica fume, slag and polypropylene fiber on the anti-penetration of tunnel concrete by means of NEL test, XRD and SEM, some conclusions has been drawn. The affection on the anti-penetration capability of the four factors is capacity of silica fume>portion of short and long fiber> fiber VOL Portion>length of Fiber. Fiber capacity of 0.15% is still not good enough for the anti-penetration capability of concrete. While that of 0.5% has exceed the maximum, and the fiber tends to assemble together. Silica fume may greatly enhance the anti-penetration capability of concrete, while the relationship between them is not direct proportion. The average of chloric ion pervasion coefficient with 8% capacity of silica fume is the lowest. Slag may reacted with other component to generate lots of C-A-H. When reacted with free chloride ion, C-A-H may form friedel salt which may also enhance the Anti-penetration capability of concrete. 展开更多
关键词 tunnel project grads-design fiber concrete waterproof layer
下载PDF
Project risk control of underground engineering geological disaster in pumped-storage power station
6
作者 Luo Shaoji 《Engineering Sciences》 EI 2014年第3期2-8,共7页
This paper introduced the construction of the pumped-storage power station (PSPS). In the excava- tion of underground power house, the principle of excavation in thin layer and support in time with real time monitor... This paper introduced the construction of the pumped-storage power station (PSPS). In the excava- tion of underground power house, the principle of excavation in thin layer and support in time with real time monitoring are adopted. The excavation blasting parameters are adjusted timely. Through these, the excavation quality can be guaranteed, the surrounding rock can be prevented from being damaged and the deformation of power house side wall can be controlled. Five security defense lines have been adopted to solve anti-seepage and drainage in the major underground projects. 展开更多
关键词 PSPS tunnel : project RISK CONTROL drainage CONTROL SYSTEM
下载PDF
基于改进DBN的大断面矩形顶管穿越铁路风险评估 被引量:1
7
作者 麻建飞 凌小康 +2 位作者 杜文选 贺少辉 崔光耀 《中国安全生产科学技术》 CAS CSCD 北大核心 2024年第4期20-26,共7页
为了评估大断面矩形顶管隧道下穿铁路风险,采用解释结构模型法建立大断面矩形顶管下穿铁路风险评估体系,构建改进动态贝叶斯网络(DBN)风险预测模型,采用模糊集理论、专家评估法等得到大断面矩形顶管穿越铁路风险值。研究结果表明:改进的... 为了评估大断面矩形顶管隧道下穿铁路风险,采用解释结构模型法建立大断面矩形顶管下穿铁路风险评估体系,构建改进动态贝叶斯网络(DBN)风险预测模型,采用模糊集理论、专家评估法等得到大断面矩形顶管穿越铁路风险值。研究结果表明:改进的DBN模型可实现大断面矩形顶管穿越铁路工程的工前风险评估、风险控制预案提前布置、现场施工风险动态评估和反馈;改进DBN模型的风险预测与专家预测结果一致;有限元-动态贝叶斯网络(FEM-DBN)模型的预测风险值较现场监测-动态贝叶斯网络(OSM-DBN)模型稍大,可为穿越工程提供更多安全储备。研究结果可为大断面顶管穿越铁路施工风险控制提供参考。 展开更多
关键词 隧道工程 风险评估 穿越工程 数值模拟 现场监测
下载PDF
岩溶隧洞突涌水灾害风险评价研究 被引量:1
8
作者 江新 陈婧 +3 位作者 赵力 张腾飞 邱国坤 李骏骁 《人民长江》 北大核心 2024年第4期169-177,共9页
受复杂地质条件的影响,岩溶隧洞在施工过程中极易发生突涌水灾害。为准确评估岩溶隧洞突涌水风险等级,将结构方程模型(SEM)与改进的模糊综合评价法(FCEM)相结合,构建岩溶隧洞突涌水风险评价模型。从地形地貌、气象水文、地层因素、地质... 受复杂地质条件的影响,岩溶隧洞在施工过程中极易发生突涌水灾害。为准确评估岩溶隧洞突涌水风险等级,将结构方程模型(SEM)与改进的模糊综合评价法(FCEM)相结合,构建岩溶隧洞突涌水风险评价模型。从地形地貌、气象水文、地层因素、地质构造、岩溶水文地质、施工因素6个方面深入研究;利用SEM确定各指标标准化路径系数并求得其权重,运用改进FCEM法对岩溶隧洞突涌水风险等级进行评价;以滇中引水工程昆呈隧洞为应用实例,利用Crystal Ball软件验证模型的有效性。结果表明:昆呈隧洞有90%的几率处于52~73分值区间范围内(Ⅲ级风险),与现场实际情况一致,表明基于SEM-改进FCEM法构建的岩溶隧洞突涌水风险评价模型具有一定的适用性;其中岩溶水文地质、地质构造、气象水文是该隧洞的主要影响因素,施工中应加强对这几方面的监控和量测,避免发生突涌水灾害。研究成果可为类似岩溶隧洞工程提供参考。 展开更多
关键词 岩溶隧洞 突涌水 结构方程模型(SEM) 改进模糊综合评价法(FCEM) 蒙特卡洛模拟 昆呈隧洞 滇中引水工程
下载PDF
硬梁包水电站方变圆大断面隧洞开挖技术
9
作者 张国平 《四川水力发电》 2024年第5期33-36,共4页
硬梁包水电站引水隧洞进口方变圆大断面洞室开挖通过先进行安全治理、锁口支护、超前预支护等措施后再进入洞段施工,先进行导洞开挖,再利用导洞开挖取得的技术参数和其所揭示的实际地质情况完成扩挖和分段分层开挖,施工时大量采用光爆... 硬梁包水电站引水隧洞进口方变圆大断面洞室开挖通过先进行安全治理、锁口支护、超前预支护等措施后再进入洞段施工,先进行导洞开挖,再利用导洞开挖取得的技术参数和其所揭示的实际地质情况完成扩挖和分段分层开挖,施工时大量采用光爆和预裂爆破技术与工艺,抓住质量关键并严格过程控制,有效地保证了工程控制目标,效果明显,所取得的经验可为类似工程施工借鉴。 展开更多
关键词 硬梁包水电站 引水隧洞 方变圆大断面 隧洞开挖技术
下载PDF
基于节段模型测力方法的塔式起重机风荷载特性研究
10
作者 李寿科 雷佳妍 +4 位作者 杨易归 林斌 郭凡 彭雄 孙洪鑫 《铁道科学与工程学报》 EI CAS CSCD 北大核心 2024年第7期2884-2896,共13页
塔式起重机被广泛应用于铁道工程和土木工程施工过程,属于高耸结构体系,风荷载是塔式起重机结构设计的控制性荷载。为完善《塔式起重机设计规范》(GB/T 13752—2017)和《建筑结构荷载规范》(GB 50009—2012)中的塔式起重机斜风向设计风... 塔式起重机被广泛应用于铁道工程和土木工程施工过程,属于高耸结构体系,风荷载是塔式起重机结构设计的控制性荷载。为完善《塔式起重机设计规范》(GB/T 13752—2017)和《建筑结构荷载规范》(GB 50009—2012)中的塔式起重机斜风向设计风荷载计算方法,解决风向、吊臂、平衡臂位置等因素对塔式起重机遮挡和干扰引起的设计风荷载计算问题。选取平头塔式起重机为研究对象,对塔身、吊臂、平衡臂进行多工况的节段模型测力风洞试验,研究湍流强度、节段干扰和遮挡等因素对塔式起重机节段风荷载特性的影响规律,研究不同风向下节段阻力系数分布规律,对比标准化阻力系数与当前主要规范的异同,进而探讨节段斜风向标准化阻力系数计算方法。研究结果表明湍流强度对节段阻力系数影响较小,可忽略,而平衡臂和吊臂相邻节段的干扰会减小测试节段的阻力系数;在斜风向下,由于吊臂和平衡臂之间存在相邻节段干扰,国内外规范方法的计算值均会大于干扰工况的节段风洞试验值;当前主要国家规范规定的垂直风向塔身、吊臂、平衡臂阻力系数与风洞试验测得的阻力系数值较为接近,基于风洞试验结果给出典型风向的塔式起重机各节段的风荷载系数取值可用于结构设计;基于风洞试验测试结果推导的塔式起重机斜风向风荷载计算方法具有较好的拟合效果。研究成果可推荐相关工程应用,可为相关规范的修改或补充提供参考。 展开更多
关键词 塔式起重机 风洞试验 节段模型 阻力系数 有效投影面积 角度风荷载
下载PDF
瓦斯隧道施工通风风机选型及经济研究 被引量:1
11
作者 韩涛 《铁路工程技术与经济》 2024年第4期37-42,共6页
为准确掌握隧道施工通风造价投资情况,保证隧道施工过程成本的有效管控,依托某隧道现场施工,计算分析了两种隧道在不同海拔下的需风量、管路阻力及风机配置情况,并根据不同隧道风机配置的不同引起的铁路工程定额基价的不同,详细阐述了... 为准确掌握隧道施工通风造价投资情况,保证隧道施工过程成本的有效管控,依托某隧道现场施工,计算分析了两种隧道在不同海拔下的需风量、管路阻力及风机配置情况,并根据不同隧道风机配置的不同引起的铁路工程定额基价的不同,详细阐述了通风成本造价投资的差异,得出了以下结论:1)不同隧道间风机供风量差异较大,风机功率相差约20%,因此在现场施工过程中应根据实际情况计算风机输入功率并合理配置风机;2)风机功率差与每昼夜通风时间差导致通风机械台班单价以及台班数量存在差异,瓦斯工区较非瓦斯工区增加82.18万元。3)随着海拔的升高,风机供风量增幅较为显著,两种隧道的通风费用增幅分别为78.4%和89.1%,均有较大增幅,因此高原地区隧道施工时还需更为严格地控制通风成本。 展开更多
关键词 高海拔 瓦斯隧道 通风方案 工程造价
下载PDF
高地应力环境下跨活断层隧道抗错断铰接设计试验研究
12
作者 张佳威 崔臻 +1 位作者 张翔宇 曹俊 《岩土力学》 EI CAS CSCD 北大核心 2024年第11期3333-3344,共12页
当活动断层发生错动时,穿越活动断层的隧道会发生不同程度的破坏。以往的研究大多未考虑隧道埋深、高应力对跨活断层隧道的影响,结果不太能贴切实际。充分讨论了解决深埋隧道抗错断问题的必要性,通过跨活断层隧道模型试验,对比深埋隧道... 当活动断层发生错动时,穿越活动断层的隧道会发生不同程度的破坏。以往的研究大多未考虑隧道埋深、高应力对跨活断层隧道的影响,结果不太能贴切实际。充分讨论了解决深埋隧道抗错断问题的必要性,通过跨活断层隧道模型试验,对比深埋隧道与浅埋隧道的破坏差异,并通过深埋铰接隧道错断试验,分析了隧道外部应力变化、衬砌应变与破坏形态。结果表明:(1)在深埋与浅埋环境下隧道整体变形皆呈“S”型变形,破坏较严重的区域都集中在断层带位置,其中深埋隧道的破坏模式主要以剪切拉伸破坏为主,产生了较大的挤压变形,破坏区域较大,而浅埋隧道主要以剪切破坏为主,在跨断层位置隧道被剪断。(2)在对深埋隧道进行铰接设计后,隧道由“S”型变形转化成“阶梯”型,隧道应变与外部岩体应力峰值得到降低,破坏程度显著减小。(3)通过对隧道衬砌裂纹分布分析,发现无铰接隧道为贯穿型破坏,裂纹影响至整个衬砌,铰接隧道裂纹影响范围约占隧道总长的66.6%,短铰接节段隧道裂纹影响范围约占隧道总长的33.3%,故深埋环境下采用更短的铰接节段对隧道的抗错断效果更佳。(4)通过对比前人研究的浅埋铰接隧道得出,浅埋铰接隧道在断层带外也会发生变形,而深埋铰接隧道破坏主要集中在断层带内位置,因此对于深埋隧道抗错断保护措施应当多集中在断层带位置。 展开更多
关键词 隧道工程 跨活断层 高地应力 铰接设计 模型试验
下载PDF
隧道爆破炮孔激光投射装置研发与应用
13
作者 杨俐 宋向荣 +2 位作者 杨林 杨钊 陈培帅 《施工技术(中英文)》 CAS 2024年第12期102-106,共5页
为解决传统钻爆法隧道爆破炮孔人工粗略定位或采用全站仪定位少数炮孔点导致炮孔放样效果差的问题,基于激光投射技术,研发主控芯片控制激光单元、分光器和光栅协同,实现炮孔激光快速投射,并通过现场试验验证。工程试验结果表明:本装置... 为解决传统钻爆法隧道爆破炮孔人工粗略定位或采用全站仪定位少数炮孔点导致炮孔放样效果差的问题,基于激光投射技术,研发主控芯片控制激光单元、分光器和光栅协同,实现炮孔激光快速投射,并通过现场试验验证。工程试验结果表明:本装置可将复杂图形一次性以点+线结合的方式投射至掌子面;掌子面凹凸变化在20cm以内,各炮孔定位偏差在3cm以内,可满足现场作业要求;相对于常规全站仪放样而言,在施工便捷性方面有相当大优势,可规范现场炮孔放样作业。 展开更多
关键词 隧道工程 爆破 炮孔 激光投射 应用
下载PDF
隧道盾构管片非接触式全周形貌测量方法研究
14
作者 鲁志鹏 吴鑫林 +3 位作者 陈稳 张忆 龙葳 张心源 《工程建设与设计》 2024年第21期66-69,共4页
针对隧道盾构管片几何质量检测的需求,提出了非接触式全周形貌测量方法。首先,遥控移动载体移动至测点,投影仪投射散斑图像,工业相机捕获并计算得到的点云数据;然后,采集多个测点;最后,将各局部点云数据进行拼接,获得被测物体的全周形... 针对隧道盾构管片几何质量检测的需求,提出了非接触式全周形貌测量方法。首先,遥控移动载体移动至测点,投影仪投射散斑图像,工业相机捕获并计算得到的点云数据;然后,采集多个测点;最后,将各局部点云数据进行拼接,获得被测物体的全周形貌。该快速半自动的检测方法可获得隧道盾构管片全周尺寸,精度达到0.2%。 展开更多
关键词 隧道工程 盾构管片 非接触 移动载体 摄影测量 投影散斑
下载PDF
圆形地连墙接缝刚度弱化对地面沉降的影响
15
作者 王汉辉 闵征辉 许建聪 《人民长江》 北大核心 2024年第11期190-197,共8页
目前,在土岩组合地层中深大圆形竖井的设计和施工方面经验尚缺。为了确保罗田水库—铁岗水库输水隧洞深78 m、直径34.9 m的圆形竖井施工安全和顺利进行,采用大型有限元软件ABAQUS建立了精细化的三维弹塑性有限元数值模型,分析了地连墙... 目前,在土岩组合地层中深大圆形竖井的设计和施工方面经验尚缺。为了确保罗田水库—铁岗水库输水隧洞深78 m、直径34.9 m的圆形竖井施工安全和顺利进行,采用大型有限元软件ABAQUS建立了精细化的三维弹塑性有限元数值模型,分析了地连墙施工过程中周边地层的变形特性。通过将是否考虑地连墙接缝刚度弱化的数值计算结果与实测值进行比较,探究了地连墙接缝刚度弱化对墙顶、地表和箱涵的沉降影响。研究结果表明:对于距离竖井较近的地面、箱涵及地连墙墙顶的沉降,考虑地连墙接缝刚度弱化的数值计算结果与实测值的最大平均相对误差分别为10.11%,1.728%和16.49%,较为相符;而接缝刚度无弱化的数值计算结果与实测值的最大平均相对误差为83.02%,3.395%和139.6%,相差较大。研究结果可为超深大直径竖井及地连墙设计提供参考。 展开更多
关键词 圆形地连墙 接缝刚度弱化 沉降效应 精细化数值模拟 罗田水库—铁岗水库输水隧洞
下载PDF
特急曲线水利隧洞针梁台车设计与施工
16
作者 刘翔 刘云龙 +3 位作者 魏波 汤宇 尹来容 童昌 《施工技术(中英文)》 CAS 2024年第8期54-59,共6页
水利基础设施建设过程中,特急曲线水利隧洞具有弯多、弯急的特点。普通针梁台车在此类隧洞工程施工中,出现弯道碰壁、受压变形等诸多问题,传统施工装备与技术的适应性难题亟待解决。以金沙江向家坝灌区北总干渠一期工程望江岩隧洞衬砌... 水利基础设施建设过程中,特急曲线水利隧洞具有弯多、弯急的特点。普通针梁台车在此类隧洞工程施工中,出现弯道碰壁、受压变形等诸多问题,传统施工装备与技术的适应性难题亟待解决。以金沙江向家坝灌区北总干渠一期工程望江岩隧洞衬砌施工为依托,在传统全圆针梁台车既有设计方法的基础上,开展加大单次衬砌长度、整体快速拆合、优化结构形式、改变脱模方式、实现高通用性等方面研究;研制特急曲线水利隧洞全圆针梁台车,创新台车不同状态下的施工工法,解决了台车在曲线处行走时会触碰隧洞壁,台车过特急曲线隧洞需重复拆卸及安装,衬砌完成后上、下侧模在受力状态下出现模板反向咬合等问题,有效推动了特急曲线隧洞施工装备设计方法革新。实际应用结果表明,所开发的特急曲线水利隧洞全圆针梁台车及其相关施工技术大幅度提高了特急曲线水利隧洞施工效率,降低了施工成本,保证了施工安全和工程质量。 展开更多
关键词 水利工程 隧洞 台车 模板 设计 施工技术
下载PDF
敞开式TBM开挖隧洞围岩变形安全评价方法及应用 被引量:1
17
作者 刘登学 孔勇斌 +2 位作者 寇甲兵 黄书岭 张雨霆 《人民长江》 北大核心 2024年第6期182-187,共6页
当TBM开挖隧洞遭遇不良地质条件下的围岩大变形地质灾害时,通常会造成卡机或侵限等风险。开展TBM开挖隧洞围岩变形安全评价工作对降低卡机或侵限等风险具有重要的现实意义。通过分析敞开式TBM开挖隧洞围岩变形特点,建立了敞开式TBM开挖... 当TBM开挖隧洞遭遇不良地质条件下的围岩大变形地质灾害时,通常会造成卡机或侵限等风险。开展TBM开挖隧洞围岩变形安全评价工作对降低卡机或侵限等风险具有重要的现实意义。通过分析敞开式TBM开挖隧洞围岩变形特点,建立了敞开式TBM开挖隧洞围岩变形安全评价方法。该方法通过采用三维数值分析和围岩变形现场监测手段,可获得围岩在护盾区间以及出露护盾后的变形,从而实现敞开式TBM开挖隧洞围岩变形安全性判别。在滇中引水工程香炉山隧洞的工程应用表明,所提方法能够有效判别不同支护方案下的围岩变形安全性,从而为敞开式TBM开挖隧洞施工期支护方案实时调整提供依据。 展开更多
关键词 TBM 围岩变形 安全评价 卡机 侵限 香炉山隧洞 滇中引水工程
下载PDF
城市隧道下穿既有建筑的影响模式分析
18
作者 董文超 徐梁 《江西建材》 2024年第5期172-174,共3页
城市中心城区建构筑物密集,新建城市地下隧道下穿既有建筑物的情况增多,为确保既有建构筑物的安全,需对新旧结构之间的相互影响模式进行分析。文中依托某城市新建隧道工程,初步判定施工对周边既有建筑的影响模式,并根据有限元分析软件,... 城市中心城区建构筑物密集,新建城市地下隧道下穿既有建筑物的情况增多,为确保既有建构筑物的安全,需对新旧结构之间的相互影响模式进行分析。文中依托某城市新建隧道工程,初步判定施工对周边既有建筑的影响模式,并根据有限元分析软件,按照国家现行相关行业规范及标准,分析新建隧道工程施工过程及运营状态对既有建构筑物的影响程度,包括既有建筑基础的沉降、沉降差、地表变形三个方面。结果表明,采取合理的工程措施后,新建隧道工程对既有建构筑物的影响较小,且不影响既有建构筑物的正常使用,整体风险可控。 展开更多
关键词 新建隧道工程 既有建构筑物 影响模式 有限元
下载PDF
隧洞突涌松散介质注浆加固技术与效果评价
19
作者 刘俊峰 郝俊锁 邢飞 《中国水能及电气化》 2024年第1期3-12,28,共11页
为解决滇中引水工程中狮子山隧洞施工中遇到的突泥、突水问题,采用帷幕预注浆技术进行地层加固处治。针对2处地质构造和突涌介质堆积体不同的工程特性,提出了岩石碎屑高压喷射灌浆加固技术和泥质介质渗透性注浆加固技术,并对岩石碎屑高... 为解决滇中引水工程中狮子山隧洞施工中遇到的突泥、突水问题,采用帷幕预注浆技术进行地层加固处治。针对2处地质构造和突涌介质堆积体不同的工程特性,提出了岩石碎屑高压喷射灌浆加固技术和泥质介质渗透性注浆加固技术,并对岩石碎屑高压喷射注浆与泥质介质注浆加固机理、帷幕注浆设计方案、施工工艺和技术、注浆效果综合评价方法进行了深入研究论证。应用结果表明,隧洞突涌体纵向加固范围为30m,径向加固范围为轮廓线以外5m,注浆加固形成了稳定的复合承载帷幕体,确保了该隧洞突涌灾害处治科学可靠,实现了突涌洞段安全掘进。 展开更多
关键词 隧洞工程 突水突泥 注浆加固 评价
下载PDF
大型水工隧洞智慧信息系统平台建设
20
作者 张良 夏扬 王润泽 《水利水电技术(中英文)》 北大核心 2024年第S01期296-300,共5页
大型水工隧洞施工往往具有地质条件复杂、施工环境恶劣、技术标准及质量要求高的特点,传统的项目管理方法难以满足当前越来越高的目标管理需求。为提高水利施工企业技术创新能力,强化企业创新主体地位,推动水工隧洞施工技术与智能化平... 大型水工隧洞施工往往具有地质条件复杂、施工环境恶劣、技术标准及质量要求高的特点,传统的项目管理方法难以满足当前越来越高的目标管理需求。为提高水利施工企业技术创新能力,强化企业创新主体地位,推动水工隧洞施工技术与智能化平台深度融合。通过在大型水工隧洞建设智慧平台,在宏观上形成智能化体系,在施工过程中达到全程可视化监控、UWB人车实时定位、安全质量闭环管理、空气质量、爆破以及地质形变等高精度监测,促使大型水工隧洞实现施工规范化、管理科学化以及隐患可控化的战略项目。 展开更多
关键词 水工隧洞 工程管理 信息系统 智能化
下载PDF