Norwegian hydropower industry has more than 100 years of experiences in constructing more than4000 km-long unlined pressure shafts and tunnels with maximum static head of 1047 m(equivalent to almost 10.5 MPa) reache...Norwegian hydropower industry has more than 100 years of experiences in constructing more than4000 km-long unlined pressure shafts and tunnels with maximum static head of 1047 m(equivalent to almost 10.5 MPa) reached at unlined pressure tunnel of Nye Tyin project. Experiences gained from construction and operation of these unlined pressure shafts and tunnels were the foundation to develop design criteria and principles applied in Norway and some other countries. In addition to the confinement criteria, Norwegian state-of-the-art design principle for unlined pressure shaft and tunnel is that the minor principal stress at the location of unlined pressure shaft or tunnel should be more than the water pressure in the shaft or tunnel. This condition of the minor principal stress is prerequisite for the hydraulic jacking/splitting not to occur through joints and fractures in rock mass. Another common problem in unlined pressure shafts and tunnels is water leakage through hydraulically splitted joints or pre-existing open joints. This article reviews some of the first attempts of the use of unlined pressure shaft and tunnel concepts in Norway, highlights major failure cases and two successful cases of significance, applies Norwegian criteria to the cases and reviews and evaluates triggering factors for failure.This article further evaluates detailed engineering geology of failure cases and also assesses common geological features that could have aggravated the failure. The minor principal stress is investigated and quantified along unlined shaft and tunnel alignment of six selected project cases by using threedimensional numerical model. Furthermore, conditions of failure through pre-existing open joints by hydraulic jacking and leakage are assessed by using two-dimensional fluid flow analysis. Finally, both favorable and unfavorable ground conditions required for the applicability of Norwegian confinement criteria in locating the unlined pressure shafts and tunnels for geotectonic environment different from that of Norway are highlighted.展开更多
West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze...West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze River to the upper reaches of the Yellow River. It is to be constructed in 3 stages, of which the 1st stage project includes delivering 4 billion m3 of water by gravity from two tributaries of Yalong River and three tributaries of Dadu River. The project consists of 5 dams,7 tunnels and a channel in series,with the dam height of 63~123 m and water transfer length of 260.3 km,of which the tunnels measure 244.1 km. The special climatic,environmental and geologic conditions make the project much more complicated in construction,especially 3 tunnels with the length longer than 50 km each create challenges to the technical requirements of engineering survey,design and construction.展开更多
Immersed tunnel is an important part of the Hong Kong–Zhuhai–Macao Bridge(HZMB) project. In immersed tunnel floating, translation which includes straight and transverse movements is the main working mode. To decide ...Immersed tunnel is an important part of the Hong Kong–Zhuhai–Macao Bridge(HZMB) project. In immersed tunnel floating, translation which includes straight and transverse movements is the main working mode. To decide the magnitude and direction of the towing force for each tug, a particle swarm-based translation control method is presented for non-power immersed tunnel element. A sort of linear weighted logarithmic function is exploited to avoid weak subgoals. In simulation, the particle swarm-based control method is evaluated and compared with traditional empirical method in the case of the HZMB project. Simulation results show that the presented method delivers performance improvement in terms of the enhanced surplus towing force.展开更多
The complicated geological conditions and geological hazards are challenging problems during tunnel construction,which will cause great losses of life and property.Therefore,reliable prediction of geological defective...The complicated geological conditions and geological hazards are challenging problems during tunnel construction,which will cause great losses of life and property.Therefore,reliable prediction of geological defective features,such as faults,karst caves and groundwater,has important practical significances and theoretical values.In this paper,we presented the criteria for detecting typical geological anomalies using the tunnel seismic prediction(TSP) method.The ground penetrating radar(GPR) signal response to water-bearing structures was used for theoretical derivations.And the 3D tomography of the transient electromagnetic method(TEM) was used to develop an equivalent conductance method.Based on the improvement of a single prediction technique,we developed a technical system for reliable prediction of geological defective features by analyzing the advantages and disadvantages of all prediction methods.The procedure of the application of this system was introduced in detail.For prediction,the selection of prediction methods is an important and challenging work.The analytic hierarchy process(AHP) was developed for prediction optimization.We applied the newly developed prediction system to several important projects in China,including Hurongxi highway,Jinping II hydropower station,and Kiaochow Bay subsea tunnel.The case studies show that the geological defective features can be successfully detected with good precision and efficiency,and the prediction system is proved to be an effective means to minimize the risks of geological hazards during tunnel construction.展开更多
Based on the Wuhan Yangtse River Tunnel Project, the low-penetration fiber concrete used in the protecting layer of Wuhan Yangtse River Tunnel tube has been studied in this paper. With the effect of silica fume, slag ...Based on the Wuhan Yangtse River Tunnel Project, the low-penetration fiber concrete used in the protecting layer of Wuhan Yangtse River Tunnel tube has been studied in this paper. With the effect of silica fume, slag and polypropylene fiber on the anti-penetration of tunnel concrete by means of NEL test, XRD and SEM, some conclusions has been drawn. The affection on the anti-penetration capability of the four factors is capacity of silica fume>portion of short and long fiber> fiber VOL Portion>length of Fiber. Fiber capacity of 0.15% is still not good enough for the anti-penetration capability of concrete. While that of 0.5% has exceed the maximum, and the fiber tends to assemble together. Silica fume may greatly enhance the anti-penetration capability of concrete, while the relationship between them is not direct proportion. The average of chloric ion pervasion coefficient with 8% capacity of silica fume is the lowest. Slag may reacted with other component to generate lots of C-A-H. When reacted with free chloride ion, C-A-H may form friedel salt which may also enhance the Anti-penetration capability of concrete.展开更多
This paper introduced the construction of the pumped-storage power station (PSPS). In the excava- tion of underground power house, the principle of excavation in thin layer and support in time with real time monitor...This paper introduced the construction of the pumped-storage power station (PSPS). In the excava- tion of underground power house, the principle of excavation in thin layer and support in time with real time monitoring are adopted. The excavation blasting parameters are adjusted timely. Through these, the excavation quality can be guaranteed, the surrounding rock can be prevented from being damaged and the deformation of power house side wall can be controlled. Five security defense lines have been adopted to solve anti-seepage and drainage in the major underground projects.展开更多
文摘Norwegian hydropower industry has more than 100 years of experiences in constructing more than4000 km-long unlined pressure shafts and tunnels with maximum static head of 1047 m(equivalent to almost 10.5 MPa) reached at unlined pressure tunnel of Nye Tyin project. Experiences gained from construction and operation of these unlined pressure shafts and tunnels were the foundation to develop design criteria and principles applied in Norway and some other countries. In addition to the confinement criteria, Norwegian state-of-the-art design principle for unlined pressure shaft and tunnel is that the minor principal stress at the location of unlined pressure shaft or tunnel should be more than the water pressure in the shaft or tunnel. This condition of the minor principal stress is prerequisite for the hydraulic jacking/splitting not to occur through joints and fractures in rock mass. Another common problem in unlined pressure shafts and tunnels is water leakage through hydraulically splitted joints or pre-existing open joints. This article reviews some of the first attempts of the use of unlined pressure shaft and tunnel concepts in Norway, highlights major failure cases and two successful cases of significance, applies Norwegian criteria to the cases and reviews and evaluates triggering factors for failure.This article further evaluates detailed engineering geology of failure cases and also assesses common geological features that could have aggravated the failure. The minor principal stress is investigated and quantified along unlined shaft and tunnel alignment of six selected project cases by using threedimensional numerical model. Furthermore, conditions of failure through pre-existing open joints by hydraulic jacking and leakage are assessed by using two-dimensional fluid flow analysis. Finally, both favorable and unfavorable ground conditions required for the applicability of Norwegian confinement criteria in locating the unlined pressure shafts and tunnels for geotectonic environment different from that of Norway are highlighted.
文摘West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze River to the upper reaches of the Yellow River. It is to be constructed in 3 stages, of which the 1st stage project includes delivering 4 billion m3 of water by gravity from two tributaries of Yalong River and three tributaries of Dadu River. The project consists of 5 dams,7 tunnels and a channel in series,with the dam height of 63~123 m and water transfer length of 260.3 km,of which the tunnels measure 244.1 km. The special climatic,environmental and geologic conditions make the project much more complicated in construction,especially 3 tunnels with the length longer than 50 km each create challenges to the technical requirements of engineering survey,design and construction.
基金financially supported by the Ministry of Education of Humanities and Social Science Project(Grant Nos.15YJC630145 and 15YJC630059)the Natural Science Foundation of Shanghai Science and Technology Committee(Grant No.15ZR1420200)
文摘Immersed tunnel is an important part of the Hong Kong–Zhuhai–Macao Bridge(HZMB) project. In immersed tunnel floating, translation which includes straight and transverse movements is the main working mode. To decide the magnitude and direction of the towing force for each tug, a particle swarm-based translation control method is presented for non-power immersed tunnel element. A sort of linear weighted logarithmic function is exploited to avoid weak subgoals. In simulation, the particle swarm-based control method is evaluated and compared with traditional empirical method in the case of the HZMB project. Simulation results show that the presented method delivers performance improvement in terms of the enhanced surplus towing force.
基金Supported by National Natural Science Foundation of China (50625927,50727904)the National Basic Research Program (973) of China (2007CB209407)Ministry of Communications’Scientific and Technological Program of Transportation Development in Western China(2009318000008)
文摘The complicated geological conditions and geological hazards are challenging problems during tunnel construction,which will cause great losses of life and property.Therefore,reliable prediction of geological defective features,such as faults,karst caves and groundwater,has important practical significances and theoretical values.In this paper,we presented the criteria for detecting typical geological anomalies using the tunnel seismic prediction(TSP) method.The ground penetrating radar(GPR) signal response to water-bearing structures was used for theoretical derivations.And the 3D tomography of the transient electromagnetic method(TEM) was used to develop an equivalent conductance method.Based on the improvement of a single prediction technique,we developed a technical system for reliable prediction of geological defective features by analyzing the advantages and disadvantages of all prediction methods.The procedure of the application of this system was introduced in detail.For prediction,the selection of prediction methods is an important and challenging work.The analytic hierarchy process(AHP) was developed for prediction optimization.We applied the newly developed prediction system to several important projects in China,including Hurongxi highway,Jinping II hydropower station,and Kiaochow Bay subsea tunnel.The case studies show that the geological defective features can be successfully detected with good precision and efficiency,and the prediction system is proved to be an effective means to minimize the risks of geological hazards during tunnel construction.
文摘Based on the Wuhan Yangtse River Tunnel Project, the low-penetration fiber concrete used in the protecting layer of Wuhan Yangtse River Tunnel tube has been studied in this paper. With the effect of silica fume, slag and polypropylene fiber on the anti-penetration of tunnel concrete by means of NEL test, XRD and SEM, some conclusions has been drawn. The affection on the anti-penetration capability of the four factors is capacity of silica fume>portion of short and long fiber> fiber VOL Portion>length of Fiber. Fiber capacity of 0.15% is still not good enough for the anti-penetration capability of concrete. While that of 0.5% has exceed the maximum, and the fiber tends to assemble together. Silica fume may greatly enhance the anti-penetration capability of concrete, while the relationship between them is not direct proportion. The average of chloric ion pervasion coefficient with 8% capacity of silica fume is the lowest. Slag may reacted with other component to generate lots of C-A-H. When reacted with free chloride ion, C-A-H may form friedel salt which may also enhance the Anti-penetration capability of concrete.
文摘This paper introduced the construction of the pumped-storage power station (PSPS). In the excava- tion of underground power house, the principle of excavation in thin layer and support in time with real time monitoring are adopted. The excavation blasting parameters are adjusted timely. Through these, the excavation quality can be guaranteed, the surrounding rock can be prevented from being damaged and the deformation of power house side wall can be controlled. Five security defense lines have been adopted to solve anti-seepage and drainage in the major underground projects.