期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
H石油平台立管腐蚀失效分析 被引量:2
1
作者 侯岱宗 张勇 +3 位作者 郭勇 王亮 徐萌 汪海波 《全面腐蚀控制》 2012年第7期57-59,67,共4页
本文通过分析立管材质和腐蚀产物,对石油平台立管的失效进行全面分析,并对飞溅区立管的腐蚀防护提出保护措施。
关键词 海洋腐蚀 飞溅区 失效
下载PDF
Prediction of casing wear in extended-reach drilling 被引量:21
2
作者 Gao Deli Sun Lianzhong Lian Jihong 《Petroleum Science》 SCIE CAS CSCD 2010年第4期494-501,共8页
Intermediate casings in the build sections are subject to severe wear in extended-reach drilling. This paper presents a new method for predicting the depth of a wear groove on the intermediate casing. According to ene... Intermediate casings in the build sections are subject to severe wear in extended-reach drilling. This paper presents a new method for predicting the depth of a wear groove on the intermediate casing. According to energy principle and dynamic accumulation of casing wear by tool joints, a model is established to calculate the wear area on the inner wall of the casing. The relationship functions between the wear groove depth and area are obtained based on the geometry relationship between the drillstring and the wear section and the assumption that the casing wear groove is crescent-shaped. The change of casing wear groove depth versus drilling footage under different-sized drillstrings is also discussed. A mechanical model is proposed for predicting casing wear location, which is based on the well trajectory and drillstring movement. The casing wear groove depth of a planned well is predicted with inversion of the casing wear factor from the drilled well and necessarily revised to improve the prediction accuracy for differences between the drilled well and the planned well. The method for predicting casing wear in extended-reach drilling is verified through actual case study. The effect of drillstring size on casing wear should be taken into account in casing wear prediction. 展开更多
关键词 Extended-reach drilling casing wear casing wear location inversion calculation
下载PDF
Experience on offshore cathodic protection retrofitting in the northern South China Sea 被引量:3
3
作者 L. Patterson A. Amorelli +1 位作者 D. Condanni B. Bazzoni 《Acta Oceanologica Sinica》 SCIE CAS CSCD 2003年第4期679-688,共10页
Platforms I and II are steel structures located in offshore areas southeast of the Zhujiang (Pearl) River Delta, the northern South China Sea,. in about 110 in water depth. The jackets, with aluminum sacrificial anode... Platforms I and II are steel structures located in offshore areas southeast of the Zhujiang (Pearl) River Delta, the northern South China Sea,. in about 110 in water depth. The jackets, with aluminum sacrificial anodes for cathodic protection (CP) of the immersed zone, were launched in March 1995. In May 096 a CP survey showed that, after almost one year of service, a low polarization level had been achieved and some extended unprotected zones existed; mainly in the deepest part of the Platform II. Further to this, a joint activity was decided in order to assess the need of a possible retrofitting of the CP systems. The results of the activity carried out are dealt with, including technical and economical comparisons amongst several retrofitting options, both with sacrificial anodes and with impressed current systems. The adopted solution is illustrated and data are reported on the level of protection presently achieved. 展开更多
关键词 cathodic protection retrofitting OFFSHORE the South China Sea
下载PDF
惠州油田大位移井水力参数设计难点及对策研究
4
作者 郭晓乐 连吉弘 +1 位作者 胡家品 张华 《重庆科技学院学报:自然科学版》 CAS
结合大位移井特点建立一套适用于大位移井的水力学分析体系。以惠州油田某大位移井为例,分析大位移井水力参数设计存在的问题及相关指标变化规律。受设备和地层限制,311mm井段钻进时通常无法满足理论最小排量要求。提出两种解决办法:... 结合大位移井特点建立一套适用于大位移井的水力学分析体系。以惠州油田某大位移井为例,分析大位移井水力参数设计存在的问题及相关指标变化规律。受设备和地层限制,311mm井段钻进时通常无法满足理论最小排量要求。提出两种解决办法:一是使用大尺寸钻杆;二是加大洗井频率。 展开更多
关键词 大位移井 水力参数 井眼 洗井
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部