[Objectives]To monitor the stability of open-pit coal mine slopes in real time and ensure the safety of coal mine production.[Methods]The automatic monitoring system of coal mine slope was explored in depth,and the co...[Objectives]To monitor the stability of open-pit coal mine slopes in real time and ensure the safety of coal mine production.[Methods]The automatic monitoring system of coal mine slope was explored in depth,and the core functions of the system were designed comprehensively.According to the design function of the automatic monitoring system,the slope automatic monitoring system was constructed.Besides,in accordance with the actual situation of the slope,the monitoring frequency of slopes was set scientifically,and the key indicators such as rainfall,deep displacement and surface displacement of the slopes were monitored in an all-round and multi-angle way.[Results]During the monitoring period,the overall condition of the slope remained good,and no landslides or other geological disasters occurred.At the same time,the overall rainfall in the slope area remained low.In terms of monitoring data,the horizontal displacement and settlement of the slopes increased first and then tended to be stable.Specifically,the maximum horizontal displacement during the monitoring period was 22.74 mm,while the maximum settlement was 18.65 mm.[Conclusions]The automatic slope monitoring system has obtained remarkable achievements in practical application.It not only improves the accuracy and efficiency of slope stability monitoring,but also provides valuable reference experience for similar projects.展开更多
In order to obtain high-precision GPS control point results and provide high-precision known points for various projects,this study uses a variety of mature GPS post-processing software to process the observation data...In order to obtain high-precision GPS control point results and provide high-precision known points for various projects,this study uses a variety of mature GPS post-processing software to process the observation data of the GPS control network of Guanyinge Reservoir,and compares the results obtained by several kinds of software.According to the test results,the reasons for the accuracy differences between different software are analyzed,and the optimal results are obtained in the analysis and comparison.The purpose of this paper is to provide useful reference for GPS software users to process data.展开更多
The existing land supply mode of opencast mining is"land requisition first,then transfer",which lacks an effective recovery and withdrawal mechanism,and the reclaimed mining land is difficult to withdraw.Acc...The existing land supply mode of opencast mining is"land requisition first,then transfer",which lacks an effective recovery and withdrawal mechanism,and the reclaimed mining land is difficult to withdraw.According to the regular rules of coal opencast mining and the periodic characteristics of land use,this paper puts forward a new mode of temporary land use for coal opencast mining.It is conducive to im-proving the quality and scale of land use and reclamation utilization of opencast coal mining,and is of great significance for exploring and for-mulating reasonable land use policies for mineral resources development projects.展开更多
In order to reduce the horizontal crossing transportation problems between coal trucks and stripping trucks,large and small vehicles,and transport trucks and belt conveyors at key points of open pit mine in production...In order to reduce the horizontal crossing transportation problems between coal trucks and stripping trucks,large and small vehicles,and transport trucks and belt conveyors at key points of open pit mine in production,the separate transportation mode of underpass bridge and overpass steel trestle is proposed to optimize the open pit development transportation system,so as to solve the practical problems that the horizontal cross of transport vehicles causes vehicle blockage,affects production schedule and production safety.The results show that the horizontal crossing road can be changed into a separate type of overpass steel trestle,which can realize the classified transportation of large and small vehicles,reduce the traffic density,make vehicles with different functions go their own way,eliminate the hidden danger of traffic accidents,and improve the production efficiency.展开更多
Taking Heidaigou Open-cast Mine and Haerwusu Open-cast Mine in Zhungeer mining area as the research objects,this paper deeply analyzes the current mining status of the two mines.Based on the existing working line leng...Taking Heidaigou Open-cast Mine and Haerwusu Open-cast Mine in Zhungeer mining area as the research objects,this paper deeply analyzes the current mining status of the two mines.Based on the existing working line length,mining technology,transportation system,equipment configuration,transportation access and many other factors,it systematically discusses the feasibility of straightening the working line of adjacent open-cast mines.Through in-depth theoretical analysis,it establishes the mathematical model of impact indicators and cost calculation,and it is concluded that the work line straightening can be technically achieved.However,from the perspective of economic benefits,straightening the working line does not show obvious advantages.展开更多
To explore the optimal evaluation mechanism of open-cast mining procedure,this paper takes the actual operation status of Huolinhe No.1 Open-cast Mine as the research basis,and makes a deep analysis of the four repres...To explore the optimal evaluation mechanism of open-cast mining procedure,this paper takes the actual operation status of Huolinhe No.1 Open-cast Mine as the research basis,and makes a deep analysis of the four representative mining procedures proposed by this mine.A detailed and comprehensive evaluation system is constructed using rank-sum ratio(RSR)method.The system covers 17 key indicators and aims to evaluate the advantages and disadvantages of each scheme in an all-round and multi-angle manner.Through the calculation and analysis by RSR method,the comprehensive evaluation of the four types of mining procedure schemes is carried out,and finally the secondary river improvement project is determined as the optimal mining implementation scheme,and the joint mining scheme of the south and north areas is the alternative strategy.The research results of this paper are objective,clear and definite,can not only reveal the effectiveness and feasibility of RSR method in solving the problem of open-cast mining procedure optimization,but also provide a strong technical support and decision-making basis for the future production development of Huolinhe No.1 Open-cast Mine.Thus,this study is expected to further promote the scientific and refined process of mining operations.展开更多
This paper primarily concerns the effective coordination of the procedures and methods employed in open pit mining operations under the background of river management.The central objective of this study is to identify...This paper primarily concerns the effective coordination of the procedures and methods employed in open pit mining operations under the background of river management.The central objective of this study is to identify a viable approach for ensuring rational and efficient development of open pit mineral resources while simultaneously protecting and restoring the ecological environment of the river.This approach should facilitate the realization of a harmonious symbiosis between mining and river management.The intricate mutual influence relationship between river management and open pit mining is first analyzed in depth,which provides a solid foundation for the subsequent coordination strategy development.In light of the aforementioned considerations,a set of coordination procedures for open pit mining based on river management conditions is proposed.These procedures emphasize the integration of river protection into the overall layout of mining at the planning stage.The implementation of scientific mining schemes,accompanied by rigorous control of the scope and depth of mining operations,has proven to be an effective means of reducing the impact of mining activities on river environments.This approach has also facilitated the achievement of a balance and coordination between mining and river management.展开更多
In order to deal with the special spatio-temporal environmental changes encountered in the process of open-cast mining,taking Huolinhe No.1 Open-cast Mine as the research object,this paper studied its typical problems...In order to deal with the special spatio-temporal environmental changes encountered in the process of open-cast mining,taking Huolinhe No.1 Open-cast Mine as the research object,this paper studied its typical problems in river reconstruction and cultural relics protection.The study focused on eight key core aspects,including the design optimization of the spatial layout of the mining area,the accurate estimation of the mineral resources reserves,the scientific theoretical demonstration of the mining scale,the fine analysis and calculation of the stripping ratio,the comprehensive consideration of the transport distance and efficiency,the accurate judgment of the best time for the implementation of the transformation,the analysis and evaluation of the slope stability,and the overall planning of the production system.The results show that the extracted problem-solving strategies and scheme system for special mining conditions can not only provide specific and practical guidance for Huolinhe No.1 Open-cast Mine,but also serve as a valuable reference and practical reference for other open-cast mine enterprises facing similar challenges.展开更多
文摘[Objectives]To monitor the stability of open-pit coal mine slopes in real time and ensure the safety of coal mine production.[Methods]The automatic monitoring system of coal mine slope was explored in depth,and the core functions of the system were designed comprehensively.According to the design function of the automatic monitoring system,the slope automatic monitoring system was constructed.Besides,in accordance with the actual situation of the slope,the monitoring frequency of slopes was set scientifically,and the key indicators such as rainfall,deep displacement and surface displacement of the slopes were monitored in an all-round and multi-angle way.[Results]During the monitoring period,the overall condition of the slope remained good,and no landslides or other geological disasters occurred.At the same time,the overall rainfall in the slope area remained low.In terms of monitoring data,the horizontal displacement and settlement of the slopes increased first and then tended to be stable.Specifically,the maximum horizontal displacement during the monitoring period was 22.74 mm,while the maximum settlement was 18.65 mm.[Conclusions]The automatic slope monitoring system has obtained remarkable achievements in practical application.It not only improves the accuracy and efficiency of slope stability monitoring,but also provides valuable reference experience for similar projects.
文摘In order to obtain high-precision GPS control point results and provide high-precision known points for various projects,this study uses a variety of mature GPS post-processing software to process the observation data of the GPS control network of Guanyinge Reservoir,and compares the results obtained by several kinds of software.According to the test results,the reasons for the accuracy differences between different software are analyzed,and the optimal results are obtained in the analysis and comparison.The purpose of this paper is to provide useful reference for GPS software users to process data.
文摘The existing land supply mode of opencast mining is"land requisition first,then transfer",which lacks an effective recovery and withdrawal mechanism,and the reclaimed mining land is difficult to withdraw.According to the regular rules of coal opencast mining and the periodic characteristics of land use,this paper puts forward a new mode of temporary land use for coal opencast mining.It is conducive to im-proving the quality and scale of land use and reclamation utilization of opencast coal mining,and is of great significance for exploring and for-mulating reasonable land use policies for mineral resources development projects.
文摘In order to reduce the horizontal crossing transportation problems between coal trucks and stripping trucks,large and small vehicles,and transport trucks and belt conveyors at key points of open pit mine in production,the separate transportation mode of underpass bridge and overpass steel trestle is proposed to optimize the open pit development transportation system,so as to solve the practical problems that the horizontal cross of transport vehicles causes vehicle blockage,affects production schedule and production safety.The results show that the horizontal crossing road can be changed into a separate type of overpass steel trestle,which can realize the classified transportation of large and small vehicles,reduce the traffic density,make vehicles with different functions go their own way,eliminate the hidden danger of traffic accidents,and improve the production efficiency.
文摘Taking Heidaigou Open-cast Mine and Haerwusu Open-cast Mine in Zhungeer mining area as the research objects,this paper deeply analyzes the current mining status of the two mines.Based on the existing working line length,mining technology,transportation system,equipment configuration,transportation access and many other factors,it systematically discusses the feasibility of straightening the working line of adjacent open-cast mines.Through in-depth theoretical analysis,it establishes the mathematical model of impact indicators and cost calculation,and it is concluded that the work line straightening can be technically achieved.However,from the perspective of economic benefits,straightening the working line does not show obvious advantages.
文摘To explore the optimal evaluation mechanism of open-cast mining procedure,this paper takes the actual operation status of Huolinhe No.1 Open-cast Mine as the research basis,and makes a deep analysis of the four representative mining procedures proposed by this mine.A detailed and comprehensive evaluation system is constructed using rank-sum ratio(RSR)method.The system covers 17 key indicators and aims to evaluate the advantages and disadvantages of each scheme in an all-round and multi-angle manner.Through the calculation and analysis by RSR method,the comprehensive evaluation of the four types of mining procedure schemes is carried out,and finally the secondary river improvement project is determined as the optimal mining implementation scheme,and the joint mining scheme of the south and north areas is the alternative strategy.The research results of this paper are objective,clear and definite,can not only reveal the effectiveness and feasibility of RSR method in solving the problem of open-cast mining procedure optimization,but also provide a strong technical support and decision-making basis for the future production development of Huolinhe No.1 Open-cast Mine.Thus,this study is expected to further promote the scientific and refined process of mining operations.
文摘This paper primarily concerns the effective coordination of the procedures and methods employed in open pit mining operations under the background of river management.The central objective of this study is to identify a viable approach for ensuring rational and efficient development of open pit mineral resources while simultaneously protecting and restoring the ecological environment of the river.This approach should facilitate the realization of a harmonious symbiosis between mining and river management.The intricate mutual influence relationship between river management and open pit mining is first analyzed in depth,which provides a solid foundation for the subsequent coordination strategy development.In light of the aforementioned considerations,a set of coordination procedures for open pit mining based on river management conditions is proposed.These procedures emphasize the integration of river protection into the overall layout of mining at the planning stage.The implementation of scientific mining schemes,accompanied by rigorous control of the scope and depth of mining operations,has proven to be an effective means of reducing the impact of mining activities on river environments.This approach has also facilitated the achievement of a balance and coordination between mining and river management.
文摘In order to deal with the special spatio-temporal environmental changes encountered in the process of open-cast mining,taking Huolinhe No.1 Open-cast Mine as the research object,this paper studied its typical problems in river reconstruction and cultural relics protection.The study focused on eight key core aspects,including the design optimization of the spatial layout of the mining area,the accurate estimation of the mineral resources reserves,the scientific theoretical demonstration of the mining scale,the fine analysis and calculation of the stripping ratio,the comprehensive consideration of the transport distance and efficiency,the accurate judgment of the best time for the implementation of the transformation,the analysis and evaluation of the slope stability,and the overall planning of the production system.The results show that the extracted problem-solving strategies and scheme system for special mining conditions can not only provide specific and practical guidance for Huolinhe No.1 Open-cast Mine,but also serve as a valuable reference and practical reference for other open-cast mine enterprises facing similar challenges.