Studied the principle of transient electromagnetic method in coalmine and solved the computation of the whole time apparent resistivity and the relation between apparent resistivity and exploration depth and so on. St...Studied the principle of transient electromagnetic method in coalmine and solved the computation of the whole time apparent resistivity and the relation between apparent resistivity and exploration depth and so on. Studied the work method of transient electromagnetic method in coalmine and obtained reasonable arrangement way. Studied data processing and explanation method of transient electromagnetic method and obtained high quality electric section. Finally the purpose to detect water-bearing body and water-bearing structure in front of roadway in advance, and detect the water-bearing property of the roof and floor rock layer of coal face were realized by use of transient electromagnetic method.展开更多
Analyzed roof rock layer structure and rock layer thickness of -550 level west main roadway and proposed that the stability of calcareous rock layer was the premise of mining successfully. According to different roof ...Analyzed roof rock layer structure and rock layer thickness of -550 level west main roadway and proposed that the stability of calcareous rock layer was the premise of mining successfully. According to different roof condition and rock pillar size of main roadway, different reinforcement plans were used to strengthen the stability of rock layer. By studying the influence rule and influence scope of dynamic pressure of main roadway wall rock because of fully mechanized coal face extracting, that the size of rock pillar was the key of affecting wall rock distorting was proposed. Scientific basis was provided for determining the size of reasonable rock pillar, selecting reasonable extracting support plan and reinforcement measures under different wall rock conditions.展开更多
文摘Studied the principle of transient electromagnetic method in coalmine and solved the computation of the whole time apparent resistivity and the relation between apparent resistivity and exploration depth and so on. Studied the work method of transient electromagnetic method in coalmine and obtained reasonable arrangement way. Studied data processing and explanation method of transient electromagnetic method and obtained high quality electric section. Finally the purpose to detect water-bearing body and water-bearing structure in front of roadway in advance, and detect the water-bearing property of the roof and floor rock layer of coal face were realized by use of transient electromagnetic method.
文摘Analyzed roof rock layer structure and rock layer thickness of -550 level west main roadway and proposed that the stability of calcareous rock layer was the premise of mining successfully. According to different roof condition and rock pillar size of main roadway, different reinforcement plans were used to strengthen the stability of rock layer. By studying the influence rule and influence scope of dynamic pressure of main roadway wall rock because of fully mechanized coal face extracting, that the size of rock pillar was the key of affecting wall rock distorting was proposed. Scientific basis was provided for determining the size of reasonable rock pillar, selecting reasonable extracting support plan and reinforcement measures under different wall rock conditions.