期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
装备维修保障资源配置综述 被引量:1
1
作者 齐小刚 方魁 +2 位作者 宋卫星 王亚洲 刘立芳 《智能系统学报》 CSCD 北大核心 2022年第2期221-232,共12页
装备维修资源配置优化方法的研究对提升维修保障效率具有不可估量的作用,然而当前装备维修保障系统的维修资源的研究已经不能满足多中心系统高效保障的实际需求。因此,本文详细分析了装备维修保障维修资源配置优化问题的相关研究。首先... 装备维修资源配置优化方法的研究对提升维修保障效率具有不可估量的作用,然而当前装备维修保障系统的维修资源的研究已经不能满足多中心系统高效保障的实际需求。因此,本文详细分析了装备维修保障维修资源配置优化问题的相关研究。首先概述了多中心装备保障系统主要包括维修任务预测、维修资源配置和多中心维修任务调度3个任务模块,并以此确定了维修保障资源配置流程。然后重点针对维修人员和维修备件资源配置优化问题参数、理论方法以及研究现状进行了综述。最后针对多中心维修保障系统资源研究的缺陷对未来发展趋势进行了展望,形成一种新的研究思路,为后续开展多中心系统资源配置优化研究提供参考。 展开更多
关键词 多中心系统 装备维修保障 任务预测 资源配置 任务调度 维修人员 备件 优化方法
下载PDF
Effect of interlayer cooling time on the temperature field of 5356-TIG wire arc additive manufacturing 被引量:10
2
作者 赵鹏康 方魁 +2 位作者 唐成 牛建平 郭美玲 《China Welding》 CAS 2021年第2期17-24,共8页
In the paper, the finite element model(FEM) of wire arc additive manufacturing(WAAM) by TIG method was established by the ABAQUS soft, and the phase transformation latent heat was considered in the model. The evolutio... In the paper, the finite element model(FEM) of wire arc additive manufacturing(WAAM) by TIG method was established by the ABAQUS soft, and the phase transformation latent heat was considered in the model. The evolution rules of temperature field at the interlayer with the cooling time of 10 s, 30 s and 50 s were obtained by the model. The WAAM experiment were performed by 5356 aluminum alloy welding wire with φ1.2 mm, and the simulated temperature field were varified by the thermocouple. The result shows that the highest temperature at the molten pool center increases with the increased interlayers at the same interlayer cooling time;the highest temperature drops gradually and the decline is smaller with the increased interlayer cooling time at the same layer. No remelting occurs at the top layer, and at least two remelting times occur in the other layers, resulting in complex temperature field evolution. 展开更多
关键词 5356 aluminum alloy wire arc additive manufacturing temperature field interlayer cooling time
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部