The 1.6GeV synchrotron of China Spallation Neutron Source(CSNS)project is a Rapid Cycling Synchrotron (RCS),which accelerates a high-intensity proton beam from 80MeV to 1.6GeV at a repetition rate of 25Hz.The RCS magn...The 1.6GeV synchrotron of China Spallation Neutron Source(CSNS)project is a Rapid Cycling Synchrotron (RCS),which accelerates a high-intensity proton beam from 80MeV to 1.6GeV at a repetition rate of 25Hz.The RCS magnet system consists of 24 dipole magnets(main dipoles),48 quadrupole magnets(main quadrupoles),16 sextupole magnets,some tune shift quadrupoles and corrector magnets.All the magnets are of large aperture for a high beam power of 0.1MW,one design issue is the fringe field at pole end.And the main dipoles and main quadrupoles work at 25Hz repetition rate,the eddy current is an additional issue.In this paper the magnet design of the two kinds of main magnets will be described.展开更多
The BEPCⅡis the upgrade project of the Beijing Electron Positron Collider(BEPC).According to the BEPCⅡdouble ring design scheme,a new ring will be added in the existing BEPC tunnel.The machine will provide electron ...The BEPCⅡis the upgrade project of the Beijing Electron Positron Collider(BEPC).According to the BEPCⅡdouble ring design scheme,a new ring will be added in the existing BEPC tunnel.The machine will provide electron and positron beams with an energy range from 1.0GeV to 2.1GeV for high energy physics research,and an electron beam of 2.SGeV,250mA for synchrotron radiation.So actually there are three storage rings for the BEPCⅡmachine.Due to the limited space of the existing BEPC tunnel and the requirement of high luminosity,the antechamber type vacuum chamber is used,that makes the BEPCⅡmagnets'design and fabrication very difficult.In the paper the general features of the design and fabrication of several kinds of main magnets for the BEPCⅡstorage ring and its interaction region are introduced.And the magnetic field measurement results are presented.展开更多
The design, fabrication and field measurement of 11 DC curved dipole magnets for the PEFP Beam Line have been completed. In this paper, a design method for a complex end chamfer using OPERA-3D is proposed. The convent...The design, fabrication and field measurement of 11 DC curved dipole magnets for the PEFP Beam Line have been completed. In this paper, a design method for a complex end chamfer using OPERA-3D is proposed. The conventional method for estimating chamfer shape is extended and applied to a curved dipole magnet by a coordinate transformation. Using the interface with CAD software, the complex end chamfer is modeled and fully determined by 3D simulation to meet the field uniformity requirement. The magnetic field measurement results are in good agreement with the simulation. The design considerations, field simulation results, end chamfer development process and measurement results are presented in detail.展开更多
文摘The 1.6GeV synchrotron of China Spallation Neutron Source(CSNS)project is a Rapid Cycling Synchrotron (RCS),which accelerates a high-intensity proton beam from 80MeV to 1.6GeV at a repetition rate of 25Hz.The RCS magnet system consists of 24 dipole magnets(main dipoles),48 quadrupole magnets(main quadrupoles),16 sextupole magnets,some tune shift quadrupoles and corrector magnets.All the magnets are of large aperture for a high beam power of 0.1MW,one design issue is the fringe field at pole end.And the main dipoles and main quadrupoles work at 25Hz repetition rate,the eddy current is an additional issue.In this paper the magnet design of the two kinds of main magnets will be described.
文摘The BEPCⅡis the upgrade project of the Beijing Electron Positron Collider(BEPC).According to the BEPCⅡdouble ring design scheme,a new ring will be added in the existing BEPC tunnel.The machine will provide electron and positron beams with an energy range from 1.0GeV to 2.1GeV for high energy physics research,and an electron beam of 2.SGeV,250mA for synchrotron radiation.So actually there are three storage rings for the BEPCⅡmachine.Due to the limited space of the existing BEPC tunnel and the requirement of high luminosity,the antechamber type vacuum chamber is used,that makes the BEPCⅡmagnets'design and fabrication very difficult.In the paper the general features of the design and fabrication of several kinds of main magnets for the BEPCⅡstorage ring and its interaction region are introduced.And the magnetic field measurement results are presented.
文摘The design, fabrication and field measurement of 11 DC curved dipole magnets for the PEFP Beam Line have been completed. In this paper, a design method for a complex end chamfer using OPERA-3D is proposed. The conventional method for estimating chamfer shape is extended and applied to a curved dipole magnet by a coordinate transformation. Using the interface with CAD software, the complex end chamfer is modeled and fully determined by 3D simulation to meet the field uniformity requirement. The magnetic field measurement results are in good agreement with the simulation. The design considerations, field simulation results, end chamfer development process and measurement results are presented in detail.