期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
粗轧机压下电动辊缝偏差常见问题及调整方法 被引量:1
1
作者 陈志比 黎峰 谢永华 《中文科技期刊数据库(全文版)工程技术》 2021年第9期99-100,共2页
随着钢铁行业的不断发展,轧机作为主要的轧钢设备也在不断地更新和发展。1780热连轧轧机是现代热连轧轧机的典型代表,其中粗轧机采用电动压下系统,结构简单、维护方便、调整范围大、调整迅速,能够满足轧制精度的要求。文章介绍了柳钢178... 随着钢铁行业的不断发展,轧机作为主要的轧钢设备也在不断地更新和发展。1780热连轧轧机是现代热连轧轧机的典型代表,其中粗轧机采用电动压下系统,结构简单、维护方便、调整范围大、调整迅速,能够满足轧制精度的要求。文章介绍了柳钢1780热连轧粗轧机压下装置电动辊缝,重点阐述了粗轧机压下电动辊缝偏差造成的原因及维护方法,为电动辊缝系统处于良好的运行状态提供了科学的管理方法。 展开更多
关键词 粗轧机 压下装置 辊缝 管理与维护
下载PDF
BEPCII Injector Linac Upgrade and Beam Instabilities 被引量:2
2
作者 王书鸿 裴国玺 +10 位作者 池云龙 陈延伟 曹建社 孔祥成 赵风利 侯泪 刘渭滨 耿哲峤 裴士伦 邓秉林 陈志比 《Chinese Physics Letters》 SCIE CAS CSCD 2008年第5期1636-1639,共4页
The upgrade project of the Beijing Electron Positron Collider (BEPCII) and its injector linac is working well. The linac upgrade aims at a higher injection rate of 5OmA/min into the storage ring, which requires an i... The upgrade project of the Beijing Electron Positron Collider (BEPCII) and its injector linac is working well. The linac upgrade aims at a higher injection rate of 5OmA/min into the storage ring, which requires an injected beam with low emittance, low energy spread and high beam orbit and energy stabilities. This goal is finally reached recently by upgrading the linac components and by dealing with rich and practical beam physics, which are described in this study. 展开更多
关键词 II-LINAC PHASING SYSTEM DESIGN ORBIT
下载PDF
BEPCⅡ Linac Beam Commissioning and Operation
3
作者 王书鸿 裴国玺 +13 位作者 池云龙 陈延伟 曹建社 孔祥成 赵风利 侯汨 陈志比 刘渭滨 邓秉林 耿哲峤 裴士伦 沈莉 乐琪 叶强 《Chinese Physics C》 SCIE CAS CSCD 北大核心 2008年第z1期215-217,共3页
The BEPCⅡ injector linac upgrade goal aims at higher beam energy with smaller beam emittance and energy spread to meet the colliding luminosity upgrade by two orders of magnitude.This paper describes the beam commiss... The BEPCⅡ injector linac upgrade goal aims at higher beam energy with smaller beam emittance and energy spread to meet the colliding luminosity upgrade by two orders of magnitude.This paper describes the beam commissioning and operation.The beam energy,energy spread,current,transmission and emittance have met the design goal.The beam orbit and energy instabilities have been studied and a steady beam operation has been realized. 展开更多
关键词 BEPCⅡ-linac UPGRADE beam commissioning operation
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部