期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Theory on real-time control of construction quality and progress and its application to high arc dam 被引量:18
1
作者 ZHONG DengHua1, REN BingYu1, LI MingChao1, WU BinPing1 & LI MingChuan2 1 Department of Hydraulic and Hydroelectric Engineering, School of Civil Engineering, Tianjin University, Tianjin 300072, china 2 ertan hydropower development company, ltd., chengdu 610051, china 《Science China(Technological Sciences)》 SCIE EI CAS 2010年第10期2611-2618,共8页
A complete scheme for solving the key scientific problems associated with high-standard,high-intensity continuous construction of high arch dams was presented. First,based on a coupling analysis of construction system... A complete scheme for solving the key scientific problems associated with high-standard,high-intensity continuous construction of high arch dams was presented. First,based on a coupling analysis of construction system decomposition and coordination for a high arc dam,a mathematical model for real-time control of construction quality and progress that considers complex constraints was developed. Second,a method of progress control was proposed based on a dynamic simulation. Third,a dynamic quality control mechanism was established based on construction information collected using a PDA. Fourth,a system for integrating collected information,progress simulation and quality control analyses under a network environment was developed. Finally,these methods were applied to a practical project to show that each aspect of a construction process can be managed effectively and that real-time monitoring and feedback control can be realized. Our methods provide new theoretical principles and technical measures for quality and progress control in the high arc dam construction process. 展开更多
关键词 CONSTRUCTION quality CONSTRUCTION PROGRESS dynamic simulation REAL-TIME control network HIGH ARC DAM
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部