The electrical energy produced must be consumed at the same time, hence the need to achieve a balance between supply and demand. Therefore, the production, transport, and distribution systems together constitute an el...The electrical energy produced must be consumed at the same time, hence the need to achieve a balance between supply and demand. Therefore, the production, transport, and distribution systems together constitute an electricity network. The distribution networks are designed to deliver energy to consumers. Unacceptable voltage drops are observed in the distribution networks of developing countries such as Burkina Faso. A study was carried out on the distribution network of the city of Bobo-Dioulasso in Burkina Faso. It allowed for experimentation with the “Megger MPQ1000” network analyzer to evaluate the quality of the voltage supplied to households. To this end, tests were carried out in a public distribution station and at a few subscribers in the Sarfalao district of the city of Bobo-Dioulasso. These tests were used to assess the percentage of voltage drops. These values, which are higher than 8% of the nominal voltage, are not regulatory. The load curves of the consumers in the district were also drawn. Indeed, the period of the high load is between 19:00 and 23:00 Local Time (LT), while the period of the medium and low load is between 00:00 and 18:00 LT.展开更多
Telegraph equations are derived from the equations of transmission line theory. They describe the relationships between the currents and voltages on a portion of an electric line as a function of the linear constants ...Telegraph equations are derived from the equations of transmission line theory. They describe the relationships between the currents and voltages on a portion of an electric line as a function of the linear constants of the conductor (resistance, conductance, inductance, capacitance). Their resolution makes it possible to determine the variation of the current and the voltage as a function of time at each point of the line. By adopting a general sinusoidal form, we propose a new exact solution to the telegraphers’ partial differential equations. Different simulations have been carried out considering the parameter of the 12/20 (24) kV Medium Voltage Cable NF C 33,220. The curves of the obtained solution better fit the real voltage curves observed in the electrical networks in operation.展开更多
Residential photovoltaic (PV) systems connected to the grid are used for self-consumption. Any surplus production is fed into the grid and contributes to improving the voltage. Several techniques are developed to mode...Residential photovoltaic (PV) systems connected to the grid are used for self-consumption. Any surplus production is fed into the grid and contributes to improving the voltage. Several techniques are developed to model their connection. However, studies on methods of injecting energy production into the Low Voltage (LV) network are nowadays a problem. This paper proposes a mathematical model to determine the current to be injected and calculate each node’s voltage. The current equation is a recurrence relation with an initial condition. This initial condition is for the case of a single PV system connected to the LV grid. The equation can also be written in matrix form. Similarly, the voltage solution is a recurrence relation. It also has an initial condition for the first node. Both mathematical formulae with the proposed initial conditions are consistent and can be used for the determination of the current and voltage of the different nodes in the grid.展开更多
文摘The electrical energy produced must be consumed at the same time, hence the need to achieve a balance between supply and demand. Therefore, the production, transport, and distribution systems together constitute an electricity network. The distribution networks are designed to deliver energy to consumers. Unacceptable voltage drops are observed in the distribution networks of developing countries such as Burkina Faso. A study was carried out on the distribution network of the city of Bobo-Dioulasso in Burkina Faso. It allowed for experimentation with the “Megger MPQ1000” network analyzer to evaluate the quality of the voltage supplied to households. To this end, tests were carried out in a public distribution station and at a few subscribers in the Sarfalao district of the city of Bobo-Dioulasso. These tests were used to assess the percentage of voltage drops. These values, which are higher than 8% of the nominal voltage, are not regulatory. The load curves of the consumers in the district were also drawn. Indeed, the period of the high load is between 19:00 and 23:00 Local Time (LT), while the period of the medium and low load is between 00:00 and 18:00 LT.
文摘Telegraph equations are derived from the equations of transmission line theory. They describe the relationships between the currents and voltages on a portion of an electric line as a function of the linear constants of the conductor (resistance, conductance, inductance, capacitance). Their resolution makes it possible to determine the variation of the current and the voltage as a function of time at each point of the line. By adopting a general sinusoidal form, we propose a new exact solution to the telegraphers’ partial differential equations. Different simulations have been carried out considering the parameter of the 12/20 (24) kV Medium Voltage Cable NF C 33,220. The curves of the obtained solution better fit the real voltage curves observed in the electrical networks in operation.
文摘Residential photovoltaic (PV) systems connected to the grid are used for self-consumption. Any surplus production is fed into the grid and contributes to improving the voltage. Several techniques are developed to model their connection. However, studies on methods of injecting energy production into the Low Voltage (LV) network are nowadays a problem. This paper proposes a mathematical model to determine the current to be injected and calculate each node’s voltage. The current equation is a recurrence relation with an initial condition. This initial condition is for the case of a single PV system connected to the LV grid. The equation can also be written in matrix form. Similarly, the voltage solution is a recurrence relation. It also has an initial condition for the first node. Both mathematical formulae with the proposed initial conditions are consistent and can be used for the determination of the current and voltage of the different nodes in the grid.