Three stages of complex technological monitoring for the increase of high-temperature-permafrost soil bearing capacity are described. The feasibility of process monitoring to improve the targeted strength properties o...Three stages of complex technological monitoring for the increase of high-temperature-permafrost soil bearing capacity are described. The feasibility of process monitoring to improve the targeted strength properties of subgrade bases on frozen soils is demonstrated. The rationale for the necessity of predictive modeling of freeze-thaw actions during the subgrade construction period is provided.展开更多
This paper reviews construction and technological solutions for roadbeds in talik areas of permafrost soil, and proposes an integrated technology for prevention and elimination of taliks during construction periods. I...This paper reviews construction and technological solutions for roadbeds in talik areas of permafrost soil, and proposes an integrated technology for prevention and elimination of taliks during construction periods. It also summarizes the expe- rience of process regulation scheduling and soil conditions monitoring during construction.展开更多
基金supported by Federal State-Funded Educational Institution of Higher Vocational Education "Moscow State University of Railway Engineering" (MGUPS (MIIT)), JSC "Yamaltransstroy" and LLC "Transstroymekhanisatsiya"
文摘Three stages of complex technological monitoring for the increase of high-temperature-permafrost soil bearing capacity are described. The feasibility of process monitoring to improve the targeted strength properties of subgrade bases on frozen soils is demonstrated. The rationale for the necessity of predictive modeling of freeze-thaw actions during the subgrade construction period is provided.
基金supported by Federal State-Funded Educational Institution of Higher Vocational Education, Moscow State University of Railway Engineering (MGUPS(MIIT)) and JSC "SGK-transstroy Yamal"
文摘This paper reviews construction and technological solutions for roadbeds in talik areas of permafrost soil, and proposes an integrated technology for prevention and elimination of taliks during construction periods. It also summarizes the expe- rience of process regulation scheduling and soil conditions monitoring during construction.