Influence of dc Component during Inadvertent Operation of the High Voltage Generator Circuit Breaker during Mis-Synchronization 被引量:2
1
作者 Kadri Kadriu ali gashi +2 位作者 Ibrahim gashi ali Hamiti Gazmend Kabashi 《Energy and Power Engineering》 2013年第3期225-235,共11页
This paper analyses the synchronization problem of a generator onto power system without satisfying synchronization condition. The main focus of the paper is on the impact of the dc component of the current in the hig... This paper analyses the synchronization problem of a generator onto power system without satisfying synchronization condition. The main focus of the paper is on the impact of the dc component of the current in the high voltage circuit breaker during its close-open operating cycle. Using real time measurements of currents/voltages and angles during the close-opening cycle of high voltage generator circuit breaker and the impact of the dc component of current in context of interrupting large magnitude of current from the circuit breaker. In addition, the paper describes a study case model and the results of simulations performed using the software EMTP-ATP of an actual incident that occurred during the inadvertent synchronization of a large 339 MW, 24 kV generator to the grid. 展开更多
关键词 High Voltage GENERATOR Circuit BREAKER dc Component of CURRENT ASYNCHRONOUS Connection Delay CURRENT ZERO
下载PDF
Simulation the Wind Grid Code Requirements for Wind Farms Connection in Kosovo Transmission Grid 被引量:1
2
作者 ali gashi Gazmend Kabashi +2 位作者 Skender Kabashi Skender Ahmetaj Valon Veliu 《Energy and Power Engineering》 2012年第6期482-495,共14页
This paper presents aspects of study and simulation approach for planned wind power projects in Kosovo Power System in relation with Grid Code requirements. All generators, connected to the Kosovo Transmission System ... This paper presents aspects of study and simulation approach for planned wind power projects in Kosovo Power System in relation with Grid Code requirements. All generators, connected to the Kosovo Transmission System are required to comply with the Grid Code. The Grid Code was originally developed with conventional synchronous generators. Since Wind Turbine Generators don’t have the same characteristics as synchronous generators, it was considered appropriate to develop a new set of Grid Code provisions specifically for Wind Farm Power Stations in relation with specific characteristic of Kosovo Power System. With high excepted penetration of wind power, a simultaneous loss of Wind Farms generation will put in the risk the security and reliability of Power System. Therefore, the main requirements for Wind farm power stations concern the fault ride through capability, frequency operation range, and reactive power capability of wind turbines. In the case of grid faults wind turbines have to supply a definite reactive power depending on the instantaneous voltage level of connection point and they must return quickly to normal operation. 展开更多
关键词 Impact on the GRID of WIND Parks Fault RIDE Through PSS/E Dynamic SIMULATION WIND GRID Code WIND Turbine Generators