期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Kicks Controlling Techniques Efficiency in Term of Time
1
作者 ali k. darwesh Thorkild Maack Rasmussen Nadhir Al-Ansari 《Engineering(科研)》 2017年第5期482-492,共11页
Kicks are the result of under balance drilling operation. Time consumed to control the kicks will be different in depending on the controlling technique. Drilling fluid considered as a first barrier to control formati... Kicks are the result of under balance drilling operation. Time consumed to control the kicks will be different in depending on the controlling technique. Drilling fluid considered as a first barrier to control formation pressure and well kicks. Any advance in drilling fluids leads to more controlled operation in term of time. This paper will follow the general increasing profile of pressure before entering the reservoir. Both methods of well controlling technique;circulating techniques and non-circulating have been implemented in many oil blocks. The process of designing and casing selection, setting depth and many other issues is predominately dependent on the utilization of accurate values of formation pressure. Formation pressures used to design safe mud weights to overcome fracturing the formation and prevent well kicks. Hence the emphasis has been placed on the practical utilization of kicks pressure near the reservoir. The presented relationships will help the engineer to better understand lithological columns and reduce potential hole problems during the kick appearance. Selecting the best well controlling practical method can lead to not harming the reservoir and more production later. Changes in some drilling fluid properties have been proposed with increasing the depth without damaging the reservoir. Suggestions in relation to the casing setting point of the intermediate section are also proposed. Standard equations with proper modification for gases and safety margin have been proposed for the future drilling operation in oil fields above the reservoir. 展开更多
关键词 Driller TECHNIQUE ENGINEER TECHNIQUE DRILLING Fluid KICKS RESERVOIR
下载PDF
Evaluation of Limestone Interval in the Drilled Surface Section of Bn-1 Oil Well
2
作者 ali k. darwesh Thorkild Maack Rasmussen Nadhir Al-Ansari 《Engineering(科研)》 2016年第8期515-524,共11页
The first exploration oil well in any oil block consumes in general more time and cost than the other wells in the same block. Evaluating the drilled wells serves to improve the future operations. This paper evaluates... The first exploration oil well in any oil block consumes in general more time and cost than the other wells in the same block. Evaluating the drilled wells serves to improve the future operations. This paper evaluates the drilled surface section through real field data for the first exploration oil well drilled in one of the oil blocks, in Kurdistan north of Iraq. The surface section of the well was drilled with the conventional method to penetrate many different geological formations with tight intervals. Drilling efficiency and the difficulties encountered are discussed and explained using various data sources. All daily drilling reports concerning a specific interval were studied. This includes weight on bit, string rotation, mud pump flow and penetration rate. Evaluation was carried out by analyzing the used controllable drilling parameters with the formations features. Penetration of the Pila Spi formation (Middle Eocene) was the most difficult formation in the drilled section. Microsoft Office 365 Pro Plus used in making graphs and Excel tables. Evaluations showed that the conventional technology used left many negative effects, like increase in None Productive Time NPT, cost and ground water pollution. Simultaneous Casing Drilling method proposed as an alternative method for the future campaign. 展开更多
关键词 Oil Exploration DRILLING CASING TORQUE Penetration Rate Formation SPUD
下载PDF
Time Optimizing near the Pay Zone
3
作者 ali k. darwesh Thorkild Maack Rasmussen Nadhir Al-Ansari 《Engineering(科研)》 2017年第10期848-859,共12页
Well control techniques are used in oil and gas drilling operations to control bottom hole pressure and avoid any fluid influx from formation to the well. These techniques are highly important near the pay zone in ter... Well control techniques are used in oil and gas drilling operations to control bottom hole pressure and avoid any fluid influx from formation to the well. These techniques are highly important near the pay zone in term of time. Controlling formation fluid pressure and thereby the formations behavior in a predictable fashion will help toward more optimized environmental friendly drilling operation. Time consumed to control the formation fluid pressure will range between few hours to many days. This paper discusses hydrostatic pressure distribution and changes near the pay zone for one oil blocks in Kurdistan, in the northern part of Iraq. Obtaining homogeneous increase in some drilling fluid properties will help the engineer to better interpret sampling of the lithological columns and reduce potential hole problems and operation time. 展开更多
关键词 FLUID Pressure WELL Control DRILLING FLUID Formation PAY ZONE
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部