期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Distinct element modelling of fracture plan control in continuum and jointed rock mass in presplitting method of surface mining 被引量:4
1
作者 Sharafisafa Mansour Aliabadian Zeinab +1 位作者 alizadeh rezvan Mortazavi Ali 《International Journal of Mining Science and Technology》 SCIE EI 2014年第6期871-881,共11页
Controlled blasting techniques are used to control overbreak and to aid in the stability of the remaining rock formation. Presplitting is one of the most common methods which is used in many open pit mining and surfac... Controlled blasting techniques are used to control overbreak and to aid in the stability of the remaining rock formation. Presplitting is one of the most common methods which is used in many open pit mining and surface blast design. The purpose of presplitting is to form a fracture plane across which the radial cracks from the production blast cannot travel. The purpose of this study is to investigate of effect of presplitting on the generation of a smooth wall in continuum and jointed rock mass. The 2D distinct element code was used to simulate the presplitting in a rock slope. The blast load history as a function of time was applied to the inner wall of each blasthole. Important parameters that were considered in the analysis were stress tensor and fracturing pattern. The blast loading magnitude and blasthole spacing and jointing pattern were found to be very significant in the final results. 展开更多
关键词 计划控制 岩体裂隙 预裂 露天采矿 元模型 控制爆破技术 炮眼间距 爆炸载荷
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部