期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Program Evaluation and Review Technique (PERT) in Construction Schedule Risk Assessment 被引量:1
1
作者 andrew bates F.H.(Bud)Griffis 《中国城市经济》 2012年第3期246-249,共4页
Construction project scheduling is one of the most critical factors for project success measurement.Not only for the project planning but for construction process management,the scheduling is the basic tool for commun... Construction project scheduling is one of the most critical factors for project success measurement.Not only for the project planning but for construction process management,the scheduling is the basic tool for communication between the owner and the project manager.By developing the schedule before the project starts,the owner knows in advance that the expected timeline of the project.By preparing construction process scheduling,the owner and general contractor can better manage the subcontractors,sub-trades progress,materials storage and deliveries,labors schedule and equipment set up which will eventually save time,money and hassle.Basically,Critical Path Method(CPM) is commonly used in the construction industry.CPM is a deterministic method that assumes that through the network,there is at least one path that determines the project duration and that the path is the critical path.CPM does not consider the uncertainty in the activities;rather it assumes that each activity can be finished in the given situation.Program Evaluation and Review Technique(PERT) is a stochastic technique which is based on the assumption that the duration of a single activity can be described by a probability density function.PERT takes into account the uncertainty during the construction process and has been created out of the need to plan,schedule and control complex projects with many uncertainties.The PERT approach is stated in some books and papers,but there is no deep investigation on the application in the schedule risk assessment.This paper investigates the PERT work process and takes a valuable try on the construction schedule risk assessment by using case studies.The utilization in the estimate the construction liquidated damage with the uncertainties is performed,which also can be used in the insurance company to calculate the insurance premium. 展开更多
关键词 Construction Management SCHEDULING CPM PERT COST RISK Analysis
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部