期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
High-precision nonisothermal transient wellbore drift flow model suitable for the full flow pattern domain and full dip range 被引量:1
1
作者 Wen-Qiang Lou Da-Lin sun +5 位作者 Xiao-Hui sun Peng-Fei Li Ya-Xin Liu Li-Chen Guan bao-jiang sun Zhi-Yuan Wang 《Petroleum Science》 SCIE EI CAS CSCD 2023年第1期424-446,共23页
A reliable multiphase flow simulator is an important tool to improve wellbore integrity and production decision-making.To develop a multiphase flow model with high adaptability and high accuracy,we first build a multi... A reliable multiphase flow simulator is an important tool to improve wellbore integrity and production decision-making.To develop a multiphase flow model with high adaptability and high accuracy,we first build a multiphase flow database with 3561 groups of data and developed a drift closure relationship with stable continuity and high adaptability.Second,a high-order numerical scheme with strong fault capture ability is constructed by effectively combining MUSCL technology,van Albada slope limiter and AUSMV numerical scheme.Finally,the energy equation is coupled into the AUSMV numerical scheme of the drift flow model in the form of finite difference.A transient non-isothermal wellbore multiphase flow model with wide applicability is formed by integrating the three technologies,and the effects of various factors on the calculation accuracy are studied.The accuracy of the simulator is verified by comparing the measurement results with the blowout experiment of a full-scale experimental well. 展开更多
关键词 Drift closure relation Non-isothermal model HIGH-PRECISION Multiphase flow solver Wellbore pressure control
下载PDF
Numerical simulation of cementing displacement interface stability of extended reach wells 被引量:5
2
作者 王金堂 孙宝江 +2 位作者 李昊 王志远 高永海 《Journal of Hydrodynamics》 SCIE EI CSCD 2018年第3期420-432,共13页
The well cementing is important during the extended reach well drilling and the completion, whereas the displacement efficiency and the interface stability are important to guarantee the success of the cementing. In t... The well cementing is important during the extended reach well drilling and the completion, whereas the displacement efficiency and the interface stability are important to guarantee the success of the cementing. In this paper, the interface stability of the cement slurry is simulated using the computational fluid dynamics software. The calculation results indicate that during the displacement, the length of the displacement interface increases with the increase of the deviation angle. The larger the eccentricity, the more significant the velocity difference, along with a longer displacement interface length, a less stable interface, and a lower displacement efficiency. Therefore, to guarantee the cementing quality and maintain a high displacement efficiency, the eccentricity should be controlled within 0.5. Application of a casing centralizer will dramatically improve the interface stability, decrease the dilution zone length of the interface and thus, is beneficial to the slurry cementing and displacement. The simulations are verified with an average absolute deviation less than 3.76% and the 45? helix angle of the rigid centralizer is recommended. Combining the data of an extended reach well on-site, methods are proposed for improving the displacement efficiency and the interface stability during the well cementing and displacement with complex boreholes. These numerical methods can be used to provide some theoretical guidance for designing the cementing of an extended reach well. 展开更多
关键词 Extended reach well hole annulus interface stability displacement efficiency numerical simulation
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部