[Objective] The study aimed to discuss the application of a stereo constructed wetland to the treatment of slightly polluted source water. [Method] In this study, a new stereo constructed wetland mode was put forward,...[Objective] The study aimed to discuss the application of a stereo constructed wetland to the treatment of slightly polluted source water. [Method] In this study, a new stereo constructed wetland mode was put forward, and a pilot project of water ecological purification in Xinsheng River, the diversion channel of Shijiuyang Waterwork in Jiaxing City, were analyzed. Afterwards, the impact factors of water purification by the technology were discussed from water quality and quantity, season and climate, species configuration, management and maintenance. [Result] Under three different hydraulic loading conditions, the pilot project effectively improved water SD and DO level, and reduced SS, CODCr, NH3-N, TN and TP significantly in summer and autumn, so that effluent water quality reached surface water standard at Grade III. [Conclusion] The stereo constructed wetland mode composed of constructed wetland and underwater forest used to treat slightly polluted source water is feasible and has a good promotion prospect.展开更多
In order to provide parameters for numerical analyses of the huge Three-Gorge concrete dam (2309 m long by 175 m height), complete tensile stress-deformation curves for large-size plain concrete specimens were measure...In order to provide parameters for numerical analyses of the huge Three-Gorge concrete dam (2309 m long by 175 m height), complete tensile stress-deformation curves for large-size plain concrete specimens were measured and studied by per-forming uniaxial tensile tests on large-size unnotched specimens (250 mm×250 mm×1400 mm). The specimens were prepared with the three-graded-aggregate materials provided by the client of the Three-Gorge project. To prevent a failure occurring near the ends of the unnotched specimens, both the ends of each specimen (450 mm in length) were cast using a higher-strength concrete than the middle part (i.e., active part). Tensile tests were completed on a specially-designed tensile testing machine, which can be easily re-assembled to accommodate different-size specimens. To make the specimens fail stably, a cyclic loading scheme was adopted after the peak strength was reached. Four of five tests in this study were successful, and four complete tensile stress-deformation curves were obtained. It was found that the post-peak curve of the large-size specimens used in this study is more gradual than those for the small-size specimens reported in the literature.展开更多
基金Supported by National Science and Technology Project of Water Pollution Control and Management(2008ZX07421-001)
文摘[Objective] The study aimed to discuss the application of a stereo constructed wetland to the treatment of slightly polluted source water. [Method] In this study, a new stereo constructed wetland mode was put forward, and a pilot project of water ecological purification in Xinsheng River, the diversion channel of Shijiuyang Waterwork in Jiaxing City, were analyzed. Afterwards, the impact factors of water purification by the technology were discussed from water quality and quantity, season and climate, species configuration, management and maintenance. [Result] Under three different hydraulic loading conditions, the pilot project effectively improved water SD and DO level, and reduced SS, CODCr, NH3-N, TN and TP significantly in summer and autumn, so that effluent water quality reached surface water standard at Grade III. [Conclusion] The stereo constructed wetland mode composed of constructed wetland and underwater forest used to treat slightly polluted source water is feasible and has a good promotion prospect.
文摘In order to provide parameters for numerical analyses of the huge Three-Gorge concrete dam (2309 m long by 175 m height), complete tensile stress-deformation curves for large-size plain concrete specimens were measured and studied by per-forming uniaxial tensile tests on large-size unnotched specimens (250 mm×250 mm×1400 mm). The specimens were prepared with the three-graded-aggregate materials provided by the client of the Three-Gorge project. To prevent a failure occurring near the ends of the unnotched specimens, both the ends of each specimen (450 mm in length) were cast using a higher-strength concrete than the middle part (i.e., active part). Tensile tests were completed on a specially-designed tensile testing machine, which can be easily re-assembled to accommodate different-size specimens. To make the specimens fail stably, a cyclic loading scheme was adopted after the peak strength was reached. Four of five tests in this study were successful, and four complete tensile stress-deformation curves were obtained. It was found that the post-peak curve of the large-size specimens used in this study is more gradual than those for the small-size specimens reported in the literature.