The original version of this article unfortunately contained a mistake.In line 6,p.785,the data“0.06”should be“6.04×10^-6”,i.e.“The results showed that among these seven failures,the occurrence probabilities...The original version of this article unfortunately contained a mistake.In line 6,p.785,the data“0.06”should be“6.04×10^-6”,i.e.“The results showed that among these seven failures,the occurrence probabilities of the wheel out-of-round and the wheel flat are the highest,both are approximately 6.04×10^-6.”展开更多
基金Project supported by the Assets4Rail Project Funded by the Shift2Rail Joint Undertaking under the EU’s H2020 Program(No.826250)the China Scholarship Council(No.201707000113)。
文摘The original version of this article unfortunately contained a mistake.In line 6,p.785,the data“0.06”should be“6.04×10^-6”,i.e.“The results showed that among these seven failures,the occurrence probabilities of the wheel out-of-round and the wheel flat are the highest,both are approximately 6.04×10^-6.”