期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Optimization of gas lift system for well performance improvement in Asmari formation:A techno-economic perspective
1
作者 Hari Sreenivasan Jash Patel +3 位作者 dev jain Setu Patel Isaac Wilson Shanker Krishna 《Petroleum Research》 EI 2024年第1期115-124,共10页
Well productivity in the Asmari carbonate formation of southwest Iran has decreased in recent years as a result of production issues.The production rate must be maintained below 1500 STB/day to prevent water coning.In... Well productivity in the Asmari carbonate formation of southwest Iran has decreased in recent years as a result of production issues.The production rate must be maintained below 1500 STB/day to prevent water coning.In this study,a gas lift well is modeled using data from one of the producing wells of this field.Nodal analysis is performed using lift-gas injection rates and wellhead pressures at different reservoir pressures and water cut conditions to optimize production.Economic aspects are considered to optimize the artificial gas injection rates at different tubing head pressures and water cut conditions.Increasing the lift-gas injection rate from 0.4 MMscf/day to 1 MMscf/day enhances the oil production rate by 37.71%and 43.89%for 10%and 30%water cut conditions,respectively.Gas injection rates of 5.2 MMscf/day and 5.4 MMscf/day are determined to be economically optimal for 30%water cut with tubing head pressures of 260 psig and 270 psig,respectively. 展开更多
关键词 Production enhancement Artificial lift Gas lift Asmari carbonate formation Techno-economic analysis Well productivity
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部