期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Performance of seven highway construction contracting methods analyzed by project size 被引量:1
1
作者 Yuanxin ZHANG Abdol CHINI +2 位作者 R.Edward MINCHIN Jr. Lourdes PTSCHELINZEW dev shah 《Frontiers of Engineering Management》 2018年第2期240-250,共11页
The conventional Design-Bid-Build(DBB)construction contracting method has had various drawbacks exposed in highway construction practice, including lack of communication, inefficient design, antagonizing relationships... The conventional Design-Bid-Build(DBB)construction contracting method has had various drawbacks exposed in highway construction practice, including lack of communication, inefficient design, antagonizing relationships, and increased disputes. To mitigate the negative aspects of DBB, several alternative contracting methods and alternative project delivery systems have been devised and introduced to the industry over the past30 years. Five such innovations were tested by a research team from the University of Florida under the sponsorship of the Florida Department of Transportation(FDOT). To perform a realistic assessment, this study categorized FDOT projects built between 2006 and 2015 into groups according to current contract amounts. Both absolute and relative metrics were defined and employed. For comparison purposes, a collective analysis on all gathered data was performed. Additionally, the influence of outliers on the results was examined. The results showed that analyses based on individual cost categories are more convincing because large projects tend to impose stronger influence on the analyses. In addition, outliers must be identified and screened to reach realistic and reliable conclusions. With regard to the actual performance of the contracting methods, each performs differently within different cost categories. 展开更多
关键词 alternative contracting methods time cost performance evaluation
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部