期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Assessing the effect of well completion types on productivity in a class 1G gas hydrate reservoir under pseudo steady state
1
作者 ellis ekhator Master of Science in Engineering Boyun Guo 《Petroleum》 CSCD 2021年第4期414-426,共13页
This work focuses on the assessment of the effect of well completion types on gas productivity in subsea gas hydrate reservoirs of class 1G type where the gas hydrates have decomposed into gas and water.Three types of... This work focuses on the assessment of the effect of well completion types on gas productivity in subsea gas hydrate reservoirs of class 1G type where the gas hydrates have decomposed into gas and water.Three types of vertical well completions are considered:frac-packed well with vertical hydraulic fracture;frac-packed well with horizontal hydraulic fracture,and a cased-hole gravel-packed well.Sensitivity analysis was conducted with analytical well inflow models to determine factors that affect the gas well productivity.The results of the analyses indicated that proppant mass pumped during fracture treatment slightly improves well productivity for frac-packed natural gas hydrate wells.Well productivity increases nonlinearly with fracture productivity up to a threshold value of 50,000 md for fracpacked well with horizontal fracture,above which further increase in fracture conductivity would create no benefit.With a proppant mass of 50,000 Ibm and a corresponding proppant volume of 504 ft3,commercial gas production rates of 14.9 MMscf/d,5.621 MMscf/d,and 11.35 MMscf/d are possible for frac-packed well with vertical fracture,frac-packed well with horizontal fracture,and cased-hole gravelpacked well,respectively.Because hydraulic fracture orientation depends on the in-situ formation stress,whether a well should be hydraulic-fractured or not depends on in-situ formation stress. 展开更多
关键词 Mathematical model Gas hydrate wells Frac-packing Well productivity Sand control
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部