Application of Snapback Chronometry Method in Calculation of Regulation
1
作者 Ivan Marovie elvis zic Nikga Jajac 《Journal of Civil Engineering and Architecture》 2011年第3期273-277,共5页
Work study is an area of construction production rationalization in which with scientific, logical, holistic and system analysis methods of the process we gain optimum in way of work and time of work. Chronometry meth... Work study is an area of construction production rationalization in which with scientific, logical, holistic and system analysis methods of the process we gain optimum in way of work and time of work. Chronometry method is one of the work study methods which is appropriate for recording shorter cyclic processes and is based on statistical sampling theory. Determination of cyclic times and work performances of standard cyclic construction machines (SCCM) is one of key assumptions of dynamic planning of machine work on every construction site. Calculation methods of SCCM work performances arc one of basic research objects in the field of construction organization and technology. Study shows applied chronometry method in work of standard cyclic construction machine. Goal of this study is to accomplish regulation through measured time cycle and compare measured effects with effects obtained with standard methodology of calculating hydraulic excavator practical achievement for gaining regulation in order to determine main reasons which effect work performance on site. 展开更多
关键词 Work study work performance snapback chronometry method standard cyclic construction machine (SCCM) regulation.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部