期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Comparative analysis of cast-in-place post-tensioned and steel-concrete composite bridge bent caps 被引量:1
1
作者 Nur Yazdani Francisco D.B.Ruiz 《Journal of Modern Transportation》 2017年第3期194-204,共11页
The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two altern... The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two alternative solutions for the pier cap on one of the bridge crossings over IH-35E in the IH-635 project were analyzed in this case study, a cast-in-place post-tensioned concrete cap and an innovative prefabricated steel-concrete com- posite cap. The approach was to use an estimation of direct costs for material and labor and consideration of con- struction time schedules. A supplementary numerical modeling confirmed that both alternatives behave elasti- cally under imposed loads. The direct cost of material and labor for the two alternatives were close. However, the composite alternative required 13 days less construction time, resulting in substantial cost savings from traffic closing in the very busy traffic corridor. Traffic closing costs were substantially higher than the direct costs, especially for the post-tensioned cap. The quantification of the benefits allows more confidence in the utilization of the composites caps, leading to faster completion of bridge projects and substantial economic savings. 展开更多
关键词 Bridge pier cap Bridge bent - Post-tensionedstructure Steel-concrete cap Cost estimation Construction schedule Traffic closing cost
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部