Seasonal variability coupled with the intermittency of renewable energy sources makes reservoir hydroelectric plants an interesting option to consider in hybrid energy systems, especially in cases of dams that have no...Seasonal variability coupled with the intermittency of renewable energy sources makes reservoir hydroelectric plants an interesting option to consider in hybrid energy systems, especially in cases of dams that have not been completed or have been abandoned and which still have some potential for reuse. The Laranjeiras dam was completed in the 1960s and the original project for hydroelectric power generation was not completed, made impossible by economic changes during the construction years. A recent study proposed the implementation of a hydroelectric photovoltaic hybrid system with lower horsepower to allow the dam to be made useful again. This paper presents the results of the computational simulations with the software Homer, considering the operation of the hydroelectric component (of the proposed hybrid system) with reservoir, playing the role of energy storage device when the production exceeds the demand at a given moment, reducing the loss of energy due to unavailability of demand. The study suggested to implement a hydroelectric power plant with power house at the base of the dam that has a height of 20 m, operating at a minimum flow of 9171 L/s, with reservoir operating as a device for energy storage, operating with a photovoltaic system of 360 kW, and a power limit for the purchase of energy from the grid equal to 200 kW, providing consumer loads up to 40 MWh per day, with cost of energy equal to US$0.021 per kWh and a capital cost of US$3285.617.展开更多
The search for alternatives to traditional sources of electric energy opens the way for a new market in the world, and for Brazil in particular. Still in its first steps, but with immense potential, the generation of ...The search for alternatives to traditional sources of electric energy opens the way for a new market in the world, and for Brazil in particular. Still in its first steps, but with immense potential, the generation of energy from solar irradiation and hydroelectric plants in hybrid systems is an important alternative. On the other hand, single source power systems, when designed to meet a particular demand without fail, lead to low market acceptance due to the availability of resources and low efficiency in performance that rewards high initial investment costs. One solution to balance and optimize energy supply is the use of more than one energy resource when sources can be complementary. Among several possible combinations reported in several studies, the hybrid photovoltaic hydroelectric system is considered to be an optimal and interesting combination. In this context, the present article makes a technical and economic pre-feasibility analysis of a hydroelectric photovoltaic hybrid system, operating photovoltaic panels on floating structures on the water surface to allow the use of the Laranjeiras dam. The study was conducted based on simulations with HOMER. The solution indicated as optimal was the installation of a hybrid energy system, implementing a hydroelectric power plant at the base of the dam, with 1497 kW of installed capacity, operating simultaneously with a set of photovoltaic modules, on the water surface of the dam, with 180 kW of installed capacity, and a power limit for the purchase and sale to the grid equal to 400 kW, to supply the demand of consumer loads up to 40 MWh per day. This combination would result in an initial cost of US$3984.885 per kW and an energy cost of US$0.026 per kWh.展开更多
文摘Seasonal variability coupled with the intermittency of renewable energy sources makes reservoir hydroelectric plants an interesting option to consider in hybrid energy systems, especially in cases of dams that have not been completed or have been abandoned and which still have some potential for reuse. The Laranjeiras dam was completed in the 1960s and the original project for hydroelectric power generation was not completed, made impossible by economic changes during the construction years. A recent study proposed the implementation of a hydroelectric photovoltaic hybrid system with lower horsepower to allow the dam to be made useful again. This paper presents the results of the computational simulations with the software Homer, considering the operation of the hydroelectric component (of the proposed hybrid system) with reservoir, playing the role of energy storage device when the production exceeds the demand at a given moment, reducing the loss of energy due to unavailability of demand. The study suggested to implement a hydroelectric power plant with power house at the base of the dam that has a height of 20 m, operating at a minimum flow of 9171 L/s, with reservoir operating as a device for energy storage, operating with a photovoltaic system of 360 kW, and a power limit for the purchase of energy from the grid equal to 200 kW, providing consumer loads up to 40 MWh per day, with cost of energy equal to US$0.021 per kWh and a capital cost of US$3285.617.
文摘The search for alternatives to traditional sources of electric energy opens the way for a new market in the world, and for Brazil in particular. Still in its first steps, but with immense potential, the generation of energy from solar irradiation and hydroelectric plants in hybrid systems is an important alternative. On the other hand, single source power systems, when designed to meet a particular demand without fail, lead to low market acceptance due to the availability of resources and low efficiency in performance that rewards high initial investment costs. One solution to balance and optimize energy supply is the use of more than one energy resource when sources can be complementary. Among several possible combinations reported in several studies, the hybrid photovoltaic hydroelectric system is considered to be an optimal and interesting combination. In this context, the present article makes a technical and economic pre-feasibility analysis of a hydroelectric photovoltaic hybrid system, operating photovoltaic panels on floating structures on the water surface to allow the use of the Laranjeiras dam. The study was conducted based on simulations with HOMER. The solution indicated as optimal was the installation of a hybrid energy system, implementing a hydroelectric power plant at the base of the dam, with 1497 kW of installed capacity, operating simultaneously with a set of photovoltaic modules, on the water surface of the dam, with 180 kW of installed capacity, and a power limit for the purchase and sale to the grid equal to 400 kW, to supply the demand of consumer loads up to 40 MWh per day. This combination would result in an initial cost of US$3984.885 per kW and an energy cost of US$0.026 per kWh.