期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Energy and Emergy Analysis to Evaluate Sustainability of Small Wastewater Treatment Plants: Application to a Constructed Wetland and a Sequencing Batch Reactor
1
作者 gerard merlin Thierry Lissolo 《Journal of Water Resource and Protection》 2010年第12期997-1009,共13页
The aim of this study is to assess the sustainability of two wastewater treatment systems by energy and emergy analyses. The first system is a Sequencing Batch Reactor (SBR) which is a concrete and electricity depende... The aim of this study is to assess the sustainability of two wastewater treatment systems by energy and emergy analyses. The first system is a Sequencing Batch Reactor (SBR) which is a concrete and electricity dependent intensive process. The second is a constructed wetland, usually considered as an extensive process. The two studied facilities have similar treatment capacity and removal efficiencies. This study sheds new light on the comparison of wastewater treatment plants. We defined a new unit, the “Functional Efficiency Index” (or FEI) to describe the energetic efficiency of the facilities, expressed in kJ per year and per kg of removed COD. The energy analysis showed that, after its construction, the constructed wetland system uses only renewable energy, in marked contrast to the SBR, totally dependent on electricity which is considered here as a non renewable. The emergy analysis showed no significant differences between the two processes, but energy and emergy indices are in favour of the constructed wetland process and thus confirm its sustainability. 展开更多
关键词 CONSTRUCTED WETLAND EMERGY Analysis SBR ENERGY Sustainable Development
下载PDF
Lab-Scale Performance Evaluation of Vertical Flow Reed Beds for the Treatment of Chlorobenzene Contaminated Groundwater
2
作者 gerard merlin Nathalie Cottin 《Journal of Environmental Protection》 2012年第8期847-855,共9页
Chlorinated Benzenes (CBs) that were released into the environment contaminate groundwater at many existing and former industrial sites. A research program was initiated to investigate the ecoremediation of CBs contam... Chlorinated Benzenes (CBs) that were released into the environment contaminate groundwater at many existing and former industrial sites. A research program was initiated to investigate the ecoremediation of CBs contaminated groundwater using subsurface flow constructed wetlands. Four lab-scale experiments were performed to evaluate re- moval efficiency with different operation conditions. The first experiment was achieved with two different solid-state materials: a peat and a lava stone (pozzolana). In order to stimulate biological activity, organic matter coming from an aged Vertical Flow Constructed Wetlands (VFCW) was added to the media. Mass balance was determined to assess the fate of these pollutants in this system. The biofiltres of the second experiment were constructed with the same materials but bioaugmentation was realized by adding organic matter of VFCW or by bacteria inoculums. Peat and pozzolana biofiltres planted with Phragmites australis constituted the third experiment to evaluate the effect of plants. Bioaugmen- tation was constituted by the addition of OM coming from aged VFCW. Compost mixed with pozzolana was the solid-state material of the fourth experiment. Columns were made of two stages. The first stage was unplanted and the second stage was planted with Phragmites. Peat has been replaced by compost, a renewable material. Lab-scale biofil- tres remove CBs with an efficiency of 70% - 99%, depending on studied media and conditions. Greater efficiency was observed with bioaugmented media. Volatilization was very low (<0.2%) and the detection of chlorides in water indi- cated the occurrence of biodegradation. The experiments have shown that organic solid-state materials (compost or peat) are useful for groundwater remediation, with higher treatment efficiency than pozzolana material. Bioaugmentation increased biological activity. Clogging of biofiltres have been observed and can be reduced by the presence of plants or by a resting period of 14 - 21 days (requiring alternative feedings on several filters). 展开更多
关键词 ORGANOCHLORINE Constructed WETLANDS PHYTOREMEDIATION BIOAUGMENTATION MICROPOLLUTANTS
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部