期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
大型国际活动交通组织规划方法综述 被引量:4
1
作者 graham currie Amer Shalaby 赵莉 《城市交通》 2013年第4期81-95,43,共16页
探讨夏季奥运会采用的交通组织规划方法,同时总结世界上最大规模的特殊活动——沙特阿拉伯麦加朝觐/副朝交通组织规划经验。每年一度的麦加朝觐已经延续几个世纪,在最近几十年人数持续增长,朝圣者已增至600万人,包括朝觐一周内300万人... 探讨夏季奥运会采用的交通组织规划方法,同时总结世界上最大规模的特殊活动——沙特阿拉伯麦加朝觐/副朝交通组织规划经验。每年一度的麦加朝觐已经延续几个世纪,在最近几十年人数持续增长,朝圣者已增至600万人,包括朝觐一周内300万人和斋月期间100万人。目前,这项活动是历史上规模最大且定期举行的特殊活动,其规模预计还将大幅增长。奥运会是世界上第二大特殊活动,每4年举办一次,在主办城市持续2周。通常奥运会主办城市自身的交通压力已经非常巨大,在奥运会期间同时还要额外满足4万名奥运官员和运动员以及800万名观众的出行需求。因此,奥运会交通组织规划对于保障赛事顺利开展至关重要。通过描述这两项活动的背景和交通供需特征,概述已有交通组织规划方法,旨在分析和总结大型活动交通组织规划的经验教训,探讨可供选择的规划策略。 展开更多
关键词 交通组织规划 大型活动 交通需求管理 公共交通 奥运会 麦加朝觐 副朝
下载PDF
"Weather" transit is reliable? Using AVL data to explore tram performance in Melbourne,Australia 被引量:1
2
作者 Mahmoud Mesbah Johnny Lin graham currie 《Journal of Traffic and Transportation Engineering(English Edition)》 2015年第3期125-135,共11页
This paper uses automatic vehicle location (AVL) records to investigate the effect of weather conditions on the travel time reliability of on-road rail transit, through a case study of the Melbourne streetcar (tram... This paper uses automatic vehicle location (AVL) records to investigate the effect of weather conditions on the travel time reliability of on-road rail transit, through a case study of the Melbourne streetcar (tram) network. The datasets available were an extensive historica; AVL dataset as well as weather observations. The sample size used in the analysis included all trips made over a period of five years (2006-2010 inclusive), during the morning peak (7 am-9 am) for fifteen randomly selected radial tram routes, all traveling to the Melbourne CBD create a linear model Ordinary least square (OLS) regression analysis was conducted to with tram travel time being the dependent variable. An alternative formulation of the model is also compared. Travel time was regressed on various weather effects including precipitation, air temperature, sea level pressure and wind speed; as well as indicator variables for weekends, public holidays and route numbers to investigate a correlation between weather condition and the on-time performance of the trams. The results indicate that only precipitation and air temperature are significant in their effect on tram travel time. The model demonstrates that on average, an additional millimeter of precipitation during the peak period adversely affects the average travel time during that period by approximately 8 s, that is, rainfall tends to increase the travel time. The effect of air temperature is less intuitive, with the model indicating that trams adhere more closely to schedule when the temperature is different in absolute terms to the mean operating conditions (taken as 15 ℃). 展开更多
关键词 Automatic vehicle location Transit performance Weather condition Regression analysis
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部