Composite sucker rod has been extensively used due to its high strength, light weight and corrosion resistive nature. However, such composite sucker rod is diffcult for conventional non-destructive evaluation(NDE) tec...Composite sucker rod has been extensively used due to its high strength, light weight and corrosion resistive nature. However, such composite sucker rod is diffcult for conventional non-destructive evaluation(NDE) techniques to inspect because of its complex material and/or structure. It is thus useful to embark research on developing novel NDE technique to comply the inspection requirement. This work demonstrates the feasibility of using the capacitive imaging(CI) technique for the inspection of composite sucker rod. Finite element(FE) models were constructed in COMSOL to simulate the detection of defects in the glass-fiber layer and on the carbon core surface. An FE Model based inversion method is proposed to obtain the profile of the carbon core. Preliminary CI experimental results are then presented, including the detection of surface wearing defect in the glass-fiber layer, and obtaining the profile of the carbon core. A set of accelerated aging experiments were also carried out and the results indicate that the CI technique is potentially useful in evaluating the ageing status of such composite sucker rod. The CI technique described in this work shows great potential to target some challenging tasks faced in the non-destructive evaluation of composite sucker rod, including quality control, defect detection and ageing assessment.展开更多
The Circular Electron Positron Collider(CEPC)is a large scientific project initiated and hosted by China,fostered through extensive collaboration with international partners.The complex comprises four accelerators:a 3...The Circular Electron Positron Collider(CEPC)is a large scientific project initiated and hosted by China,fostered through extensive collaboration with international partners.The complex comprises four accelerators:a 30 GeV Linac,a 1.1 GeV Damping Ring,a Booster capable of achieving energies up to 180 GeV,and a Collider operating at varying energy modes(Z,W,H,and tt).The Linac and Damping Ring are situated on the surface,while the subterranean Booster and Collider are housed in a 100 km circumference underground tunnel,strategically accommodating future expansion with provisions for a potential Super Proton Proton Collider(SPPC).The CEPC primarily serves as a Higgs factory.In its baseline design with synchrotron radiation(SR)power of 30 MW per beam,it can achieve a luminosity of 5×10^(34)cm^(-2)s^(-1)per interaction point(IP),resulting in an integrated luminosity of 13 ab^(-1)for two IPs over a decade,producing 2.6 million Higgs bosons.Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons,facilitating precise measurements of Higgs coupling at sub-percent levels,exceeding the precision expected from the HL-LHC by an order of magnitude.This Technical Design Report(TDR)follows the Preliminary Conceptual Design Report(Pre-CDR,2015)and the Conceptual Design Report(CDR,2018),comprehensively detailing the machine's layout,performance metrics,physical design and analysis,technical systems design,R&D and prototyping efforts,and associated civil engineering aspects.Additionally,it includes a cost estimate and a preliminary construction timeline,establishing a framework for forthcoming engineering design phase and site selection procedures.Construction is anticipated to begin around 2027-2028,pending government approval,with an estimated duration of 8 years.The commencement of experiments and data collection could potentially be initiated in the mid-2030s.展开更多
Typhoon Lekima(2019)struck Zhejiang Province on 10 August 2019 as a supertyphoon,which severely impacted Zhejiang Province.The typhoon killed 45 people and left three others missing,and the total economic loss reached...Typhoon Lekima(2019)struck Zhejiang Province on 10 August 2019 as a supertyphoon,which severely impacted Zhejiang Province.The typhoon killed 45 people and left three others missing,and the total economic loss reached 40.71 billion yuan.This paper reports a postdisaster survey that focuses on the storm precipitation,flooding,landslides,and weather services associated with Typhoon Lekima(2019)along the southeastern coastline of Zhejiang Province.The survey was conducted by a joint survey team from the Shanghai Typhoon Institute and local meteorological bureaus from 26 to 28 August,2019,approximately two weeks after the disaster.Based on this survey and subsequent analyses of the results,we hope to develop countermeasures to prevent future tragedies.展开更多
JUNO is a multi-purpose neutrino observatory under construction in the south of China.This publication presents new sensitivity estimates for the measurement of the △m_(31)^(2),△m_(21)^(2),sin^(2)θ_(12),and sin^(2)...JUNO is a multi-purpose neutrino observatory under construction in the south of China.This publication presents new sensitivity estimates for the measurement of the △m_(31)^(2),△m_(21)^(2),sin^(2)θ_(12),and sin^(2)θ_(13) oscillation parameters using reactor antineutrinos,which is one of the primary physics goals of the experiment.The sensitivities are obtained using the best knowledge available to date on the location and overburden of the experimental site,the nuclear reactors in the surrounding area and beyond,the detector response uncertainties,and the reactor antineutrino spectral shape constraints expected from the TAO satellite detector.It is found that the △m_(21)^(2) and sin^(2)θ_(12) oscillation parameters will be determined to 0.5%precision or better in six years of data collection.In the same period,the △m_(31)^(2) parameter will be determined to about 0.2%precision for each mass ordering hypothesis.The new precision represents approximately an order of magnitude improvement over existing constraints for these three parameters.展开更多
基金Supported by National Natural Science Foundation of China(Grant Nos.51675536,51574276)Fundamental Research Funds for the Central Universities of China(Grant No.18CX02084A)Innovative Talents Program of Far East NDT New Technology&Application Forum
文摘Composite sucker rod has been extensively used due to its high strength, light weight and corrosion resistive nature. However, such composite sucker rod is diffcult for conventional non-destructive evaluation(NDE) techniques to inspect because of its complex material and/or structure. It is thus useful to embark research on developing novel NDE technique to comply the inspection requirement. This work demonstrates the feasibility of using the capacitive imaging(CI) technique for the inspection of composite sucker rod. Finite element(FE) models were constructed in COMSOL to simulate the detection of defects in the glass-fiber layer and on the carbon core surface. An FE Model based inversion method is proposed to obtain the profile of the carbon core. Preliminary CI experimental results are then presented, including the detection of surface wearing defect in the glass-fiber layer, and obtaining the profile of the carbon core. A set of accelerated aging experiments were also carried out and the results indicate that the CI technique is potentially useful in evaluating the ageing status of such composite sucker rod. The CI technique described in this work shows great potential to target some challenging tasks faced in the non-destructive evaluation of composite sucker rod, including quality control, defect detection and ageing assessment.
基金support from diverse funding sources,including the National Key Program for S&T Research and Development of the Ministry of Science and Technology(MOST),Yifang Wang's Science Studio of the Ten Thousand Talents Project,the CAS Key Foreign Cooperation Grant,the National Natural Science Foundation of China(NSFC)Beijing Municipal Science&Technology Commission,the CAS Focused Science Grant,the IHEP Innovation Grant,the CAS Lead Special Training Programthe CAS Center for Excellence in Particle Physics,the CAS International Partnership Program,and the CAS/SAFEA International Partnership Program for Creative Research Teams.
文摘The Circular Electron Positron Collider(CEPC)is a large scientific project initiated and hosted by China,fostered through extensive collaboration with international partners.The complex comprises four accelerators:a 30 GeV Linac,a 1.1 GeV Damping Ring,a Booster capable of achieving energies up to 180 GeV,and a Collider operating at varying energy modes(Z,W,H,and tt).The Linac and Damping Ring are situated on the surface,while the subterranean Booster and Collider are housed in a 100 km circumference underground tunnel,strategically accommodating future expansion with provisions for a potential Super Proton Proton Collider(SPPC).The CEPC primarily serves as a Higgs factory.In its baseline design with synchrotron radiation(SR)power of 30 MW per beam,it can achieve a luminosity of 5×10^(34)cm^(-2)s^(-1)per interaction point(IP),resulting in an integrated luminosity of 13 ab^(-1)for two IPs over a decade,producing 2.6 million Higgs bosons.Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons,facilitating precise measurements of Higgs coupling at sub-percent levels,exceeding the precision expected from the HL-LHC by an order of magnitude.This Technical Design Report(TDR)follows the Preliminary Conceptual Design Report(Pre-CDR,2015)and the Conceptual Design Report(CDR,2018),comprehensively detailing the machine's layout,performance metrics,physical design and analysis,technical systems design,R&D and prototyping efforts,and associated civil engineering aspects.Additionally,it includes a cost estimate and a preliminary construction timeline,establishing a framework for forthcoming engineering design phase and site selection procedures.Construction is anticipated to begin around 2027-2028,pending government approval,with an estimated duration of 8 years.The commencement of experiments and data collection could potentially be initiated in the mid-2030s.
基金sponsored by the National Natural Science Foundation of China(Grant Nos.41705096,41775065)Key Program for International S&T Cooperation Projects of China(No.2017YFE0107700)+2 种基金National Key R&D Program of China(No.2017YFC1501604)Shanghai Science&Technology Research Program(No.19dz1200101)Fundamental Research Funds of the STI/CMA(No.2019JB06).
文摘Typhoon Lekima(2019)struck Zhejiang Province on 10 August 2019 as a supertyphoon,which severely impacted Zhejiang Province.The typhoon killed 45 people and left three others missing,and the total economic loss reached 40.71 billion yuan.This paper reports a postdisaster survey that focuses on the storm precipitation,flooding,landslides,and weather services associated with Typhoon Lekima(2019)along the southeastern coastline of Zhejiang Province.The survey was conducted by a joint survey team from the Shanghai Typhoon Institute and local meteorological bureaus from 26 to 28 August,2019,approximately two weeks after the disaster.Based on this survey and subsequent analyses of the results,we hope to develop countermeasures to prevent future tragedies.
基金Supported by the Chinese Academy of Sciencesthe National Key R&D Program of China+18 种基金the CAS Center for Excellence in Particle Physics,Wuyi Universitythe Tsung-Dao Lee Institute of Shanghai Jiao Tong University in Chinathe Institut National de Physique Nucléaire et de Physique de Particules(IN2P3)in Francethe Istituto Nazionale di Fisica Nucleare(INFN)in Italythe Italian-Chinese collaborative research program MAECI-NSFCthe Fond de la Recherche Scientifique(F.R.S-FNRS)FWO under the“Excellence of Science-EOS in Belgium”the Conselho Nacional de Desenvolvimento Científico e Tecnològico in Brazilthe Agencia Nacional de Investigacion y Desarrollo and ANID-Millennium Science Initiative Program-ICN2019_044 in Chilethe Charles University Research Centre and the Ministry of Education,Youth,and Sports in Czech Republicthe Deutsche Forschungsgemeinschaft(DFG)the Helmholtz Associationthe Cluster of Excellence PRISMA+in Germanythe Joint Institute of Nuclear Research(JINR)and Lomonosov Moscow State University in Russiathe joint Russian Science Foundation(RSF)National Natural Science Foundation of China(NSFC)research programthe MOST and MOE in Taiwanthe Chulalongkorn University and Suranaree University of Technology in Thailand,University of California at Irvinethe National Science Foundation in USA。
文摘JUNO is a multi-purpose neutrino observatory under construction in the south of China.This publication presents new sensitivity estimates for the measurement of the △m_(31)^(2),△m_(21)^(2),sin^(2)θ_(12),and sin^(2)θ_(13) oscillation parameters using reactor antineutrinos,which is one of the primary physics goals of the experiment.The sensitivities are obtained using the best knowledge available to date on the location and overburden of the experimental site,the nuclear reactors in the surrounding area and beyond,the detector response uncertainties,and the reactor antineutrino spectral shape constraints expected from the TAO satellite detector.It is found that the △m_(21)^(2) and sin^(2)θ_(12) oscillation parameters will be determined to 0.5%precision or better in six years of data collection.In the same period,the △m_(31)^(2) parameter will be determined to about 0.2%precision for each mass ordering hypothesis.The new precision represents approximately an order of magnitude improvement over existing constraints for these three parameters.