During the year of 2014, the work of cryogenic group was mainly focused on operation of refrigerator system,test of TCM1, design and machining of HCM6. At the end of 2014 refrigerator system has achieved closed-loopop...During the year of 2014, the work of cryogenic group was mainly focused on operation of refrigerator system,test of TCM1, design and machining of HCM6. At the end of 2014 refrigerator system has achieved closed-loopoperation and recycle of helium gas, which did great contribution to superconducting cavity and superconductingmagnet test. Since the refrigerator was put into use(Fig. 1), it has operated continuously and reliably for more than5 110 h, reached helium lique ed capacity 270 L/h at 850 W.展开更多
The superconducting accelerating segment in injectorⅡof Accelerator Driven Sub-critical System(ADS) uses superconductingcavities whose frequency are 162.5 MHz. The vertical performance of superconducting cavity devic...The superconducting accelerating segment in injectorⅡof Accelerator Driven Sub-critical System(ADS) uses superconductingcavities whose frequency are 162.5 MHz. The vertical performance of superconducting cavity devicesmust be tested at liquid helium temperature(2, 4.2 K) before being assembled in cryostat. To meet the runninggoal of the 0 25 MeV linac system, it is necessary to build a set of cryogenic testing system for superconductingcavity, which is used to test the performance of the superconducting cavity and whether cavity meet the designgoal.展开更多
ADS Injector-II linear accelerator is mainly composed of ECR ion source,LEBT,RFQ,MEBT,a superconducting accelerating segment and HEBT.The superconducting accelerating segment is composed of two HWR010 cavity cryomodul...ADS Injector-II linear accelerator is mainly composed of ECR ion source,LEBT,RFQ,MEBT,a superconducting accelerating segment and HEBT.The superconducting accelerating segment is composed of two HWR010 cavity cryomodules,a taper cavity cryomodule and a spoke cavity cryomodule(CM1+CM2+CM3+CM4),which has accelerated the proton beam to 25 MeV in Jun.2017.展开更多
In superconducting linear accelerator(LINAC),the performance and stability can be adversely impacted by gas adsorbed on cryogenic surfaces.Adsorption capacity and peculiarity of adsorption process on cryogenic niobium...In superconducting linear accelerator(LINAC),the performance and stability can be adversely impacted by gas adsorbed on cryogenic surfaces.Adsorption capacity and peculiarity of adsorption process on cryogenic niobium material surface are measured in order to improve the performance and stability of superconductive accelerator.The results and analysis(Fig.1-4)in this paper indicate:firstly,the saturated vapor pressure of hydrogen and helium is much higher than the maximum allowable value for superconductive LINAC operation,secondly,at cryogenic temperature,such as 4 K,it is the gas adsorption amount that determines the pressure,thirdly,pressure will not arise until single monolayer accomplished,it may take a long time.展开更多
There are two types of HWR cavities have been developed in IMP for C-ADS Injector.HWR010s have been used to accelerate proton from 2.1 MeV to 10 MeV.There are 12 HWR010s assembled in two CMs.The taper type HWR015s hav...There are two types of HWR cavities have been developed in IMP for C-ADS Injector.HWR010s have been used to accelerate proton from 2.1 MeV to 10 MeV.There are 12 HWR010s assembled in two CMs.The taper type HWR015s have been used to accelerate proton from 10MeV to 18.5 MeV.There are 5 HWRs assembled in the third CM.Proton beam has been accelerated to 26 MeV by HWR010,HWR015 and Spoke021 in June 2017.The beam has been accelerated to 18.5 MeV by HWR010 and HWR015.The CMs in the tunnel are shown in Fig.1.展开更多
文摘During the year of 2014, the work of cryogenic group was mainly focused on operation of refrigerator system,test of TCM1, design and machining of HCM6. At the end of 2014 refrigerator system has achieved closed-loopoperation and recycle of helium gas, which did great contribution to superconducting cavity and superconductingmagnet test. Since the refrigerator was put into use(Fig. 1), it has operated continuously and reliably for more than5 110 h, reached helium lique ed capacity 270 L/h at 850 W.
文摘The superconducting accelerating segment in injectorⅡof Accelerator Driven Sub-critical System(ADS) uses superconductingcavities whose frequency are 162.5 MHz. The vertical performance of superconducting cavity devicesmust be tested at liquid helium temperature(2, 4.2 K) before being assembled in cryostat. To meet the runninggoal of the 0 25 MeV linac system, it is necessary to build a set of cryogenic testing system for superconductingcavity, which is used to test the performance of the superconducting cavity and whether cavity meet the designgoal.
文摘ADS Injector-II linear accelerator is mainly composed of ECR ion source,LEBT,RFQ,MEBT,a superconducting accelerating segment and HEBT.The superconducting accelerating segment is composed of two HWR010 cavity cryomodules,a taper cavity cryomodule and a spoke cavity cryomodule(CM1+CM2+CM3+CM4),which has accelerated the proton beam to 25 MeV in Jun.2017.
文摘In superconducting linear accelerator(LINAC),the performance and stability can be adversely impacted by gas adsorbed on cryogenic surfaces.Adsorption capacity and peculiarity of adsorption process on cryogenic niobium material surface are measured in order to improve the performance and stability of superconductive accelerator.The results and analysis(Fig.1-4)in this paper indicate:firstly,the saturated vapor pressure of hydrogen and helium is much higher than the maximum allowable value for superconductive LINAC operation,secondly,at cryogenic temperature,such as 4 K,it is the gas adsorption amount that determines the pressure,thirdly,pressure will not arise until single monolayer accomplished,it may take a long time.
文摘There are two types of HWR cavities have been developed in IMP for C-ADS Injector.HWR010s have been used to accelerate proton from 2.1 MeV to 10 MeV.There are 12 HWR010s assembled in two CMs.The taper type HWR015s have been used to accelerate proton from 10MeV to 18.5 MeV.There are 5 HWRs assembled in the third CM.Proton beam has been accelerated to 26 MeV by HWR010,HWR015 and Spoke021 in June 2017.The beam has been accelerated to 18.5 MeV by HWR010 and HWR015.The CMs in the tunnel are shown in Fig.1.