Based on analyzing risk factors of diversion project,synthetic risk rate and engineering insurance period,the frequency and distribution law of loss are researched on the grounds that foundation pit is submerged after...Based on analyzing risk factors of diversion project,synthetic risk rate and engineering insurance period,the frequency and distribution law of loss are researched on the grounds that foundation pit is submerged after diversion project ceases to be effective.And then,the standpoint that these total loss is subject to non-homogeneous compound Poisson processes is put forward.Furthermore,the collective risk model of the total loss about engineering insurance is established on the basis of construction diversion project risk.Ultimately,insurance ratemaking method for construction engineering risk and its mathematical expression are presented,which provides theoretical method for the insurance ratemaking of hydropower engineering to some extent.展开更多
There is a discharge control feature of construction diversion system with the upstream operational reservoir. The risk evaluation model of construction diversion is established by taking into consideration the risk f...There is a discharge control feature of construction diversion system with the upstream operational reservoir. The risk evaluation model of construction diversion is established by taking into consideration the risk factors of construction diversion system with discharge control feature as well as their composition. And the risk factors include the upstream operational reservoir discharge control, the interval flood and branch flood and the diversion system itself. And then based on analyzing of the conversion relation between risk index and investment index of diversion scheme, the risk control and conversion principals of diversion system are put forward, and the feasible diversion scheme model is built. At last, the risk and economic evaluation and scheme economic feasibility analysis method of diversion scheme are shown by an example of construction diversion scheme optimization with the discharge control condition of upstream hydropower station. The study is valuable for establishment and optimization of construction diversion scheme with upstream reservoir discharge control.展开更多
根据电站运行要求,确定下游库水位波动范围,并利用DHI Mike 21得到相应的龙口下游水位,采用水力学方法计算不同下游水深对应的龙口最大流速,用截流标准表征截流风险,反映下游库水位变化幅度对截流风险提高或降低的程度,引入工程案例验...根据电站运行要求,确定下游库水位波动范围,并利用DHI Mike 21得到相应的龙口下游水位,采用水力学方法计算不同下游水深对应的龙口最大流速,用截流标准表征截流风险,反映下游库水位变化幅度对截流风险提高或降低的程度,引入工程案例验证了计算模型的可靠性和合理性,计算结果证明了工程方法的可行性。展开更多
基金Project of the National Eleventh Five-year Research Program of China (No.2008BAB29B02)National Natural Science Foundation of China(No.51079115)
文摘Based on analyzing risk factors of diversion project,synthetic risk rate and engineering insurance period,the frequency and distribution law of loss are researched on the grounds that foundation pit is submerged after diversion project ceases to be effective.And then,the standpoint that these total loss is subject to non-homogeneous compound Poisson processes is put forward.Furthermore,the collective risk model of the total loss about engineering insurance is established on the basis of construction diversion project risk.Ultimately,insurance ratemaking method for construction engineering risk and its mathematical expression are presented,which provides theoretical method for the insurance ratemaking of hydropower engineering to some extent.
基金National Natural Science Foundation of China ( No. 10902078 and No. 51079115)
文摘There is a discharge control feature of construction diversion system with the upstream operational reservoir. The risk evaluation model of construction diversion is established by taking into consideration the risk factors of construction diversion system with discharge control feature as well as their composition. And the risk factors include the upstream operational reservoir discharge control, the interval flood and branch flood and the diversion system itself. And then based on analyzing of the conversion relation between risk index and investment index of diversion scheme, the risk control and conversion principals of diversion system are put forward, and the feasible diversion scheme model is built. At last, the risk and economic evaluation and scheme economic feasibility analysis method of diversion scheme are shown by an example of construction diversion scheme optimization with the discharge control condition of upstream hydropower station. The study is valuable for establishment and optimization of construction diversion scheme with upstream reservoir discharge control.