Air channeling in the annulus between the casing and the cement sheath and/or between the cement sheath and formation is the main factor affecting the safe operation of natural gas wells at high temperatures and press...Air channeling in the annulus between the casing and the cement sheath and/or between the cement sheath and formation is the main factor affecting the safe operation of natural gas wells at high temperatures and pressures.Prevention of this problem requires,in general,excellent anti-channeling performances of the cement sheath.Three methods to predict such anti-channeling performances are proposed here,which use the weightless pressure of cement slurry,the permeability of cement stone and the volume expansion rate of cement sheath as input parameters.Guided by this approach,the anti-channeling performances of the cement slurry are evaluated by means of indoor experiments,and the cement slurry is optimized accordingly.The results show that the dangerous transition time of the cement slurry with optimized dosage of admixture is only 76 min,the permeability of cement stone is 0.005 md,the volume shrinkage at final setting is only 0.72%,and the anti-channeling performances are therefore maximized.The effective utilization of the optimized cement slurry in some representative wells(LD10–1-A1 and LD10–1-A2 in LD10–1 gas field)is also discussed.展开更多
The bonding quality of the cement sheath interface decreases during well completion because of the change in the casing pressure.To explore the root cause of such phenomena,experiments on the mechanical properties and...The bonding quality of the cement sheath interface decreases during well completion because of the change in the casing pressure.To explore the root cause of such phenomena,experiments on the mechanical properties and interface bonding strength of a cement sheath have been carried out taking the LS25-1 high-temperature and high-pressure(HTHP)gas field as an example.Moreover,a constitutive model of the cement sheath has been defined and verified both by means of a full-scale HTHP cement sheath sealing integrity evaluation experiment and three-dimensional finite element simulations.The results show that the low initial cementing surface strength is the root cause of cement sheath interface bonding failure.When the pressure in the casing exceeds a certain limit,the stress caused by the change in the internal pressure in the casing is transmitted to the cement sheath,resulting in the degradation of the interface stiffness of the cement sheath.However,with an increase in the casing wall thickness,the stress transmission capacity decreases.Therefore,it is concluded that improving the interfacial cementing strength,appropriately increasing the casing wall thickness and increasing the initial stress of the cement sheath are the keys to ensuring the sealing integrity of the cement sheath in high-temperature and high-pressure gas wells.展开更多
基金funded by the CNOOC Scientific Research Project“Study of cementing key properties and its matching technology of LD-10 gas field”(Grant No.CCL2019ZJFN1227).
文摘Air channeling in the annulus between the casing and the cement sheath and/or between the cement sheath and formation is the main factor affecting the safe operation of natural gas wells at high temperatures and pressures.Prevention of this problem requires,in general,excellent anti-channeling performances of the cement sheath.Three methods to predict such anti-channeling performances are proposed here,which use the weightless pressure of cement slurry,the permeability of cement stone and the volume expansion rate of cement sheath as input parameters.Guided by this approach,the anti-channeling performances of the cement slurry are evaluated by means of indoor experiments,and the cement slurry is optimized accordingly.The results show that the dangerous transition time of the cement slurry with optimized dosage of admixture is only 76 min,the permeability of cement stone is 0.005 md,the volume shrinkage at final setting is only 0.72%,and the anti-channeling performances are therefore maximized.The effective utilization of the optimized cement slurry in some representative wells(LD10–1-A1 and LD10–1-A2 in LD10–1 gas field)is also discussed.
基金The authors gratefully acknowledge the CNOOC scientific research project“Study of risk assessment and countermeasures of well drilling and completion under ultrahigh temperature and high pressure”and“Research on development feasibility of LS25-1 gas field”(Grant Nos.YXKY-ZX-09-2021,2020FS-08).
文摘The bonding quality of the cement sheath interface decreases during well completion because of the change in the casing pressure.To explore the root cause of such phenomena,experiments on the mechanical properties and interface bonding strength of a cement sheath have been carried out taking the LS25-1 high-temperature and high-pressure(HTHP)gas field as an example.Moreover,a constitutive model of the cement sheath has been defined and verified both by means of a full-scale HTHP cement sheath sealing integrity evaluation experiment and three-dimensional finite element simulations.The results show that the low initial cementing surface strength is the root cause of cement sheath interface bonding failure.When the pressure in the casing exceeds a certain limit,the stress caused by the change in the internal pressure in the casing is transmitted to the cement sheath,resulting in the degradation of the interface stiffness of the cement sheath.However,with an increase in the casing wall thickness,the stress transmission capacity decreases.Therefore,it is concluded that improving the interfacial cementing strength,appropriately increasing the casing wall thickness and increasing the initial stress of the cement sheath are the keys to ensuring the sealing integrity of the cement sheath in high-temperature and high-pressure gas wells.