期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Use of Innovative Contracting Methods by Dots - Project Managers Speak
1
作者 Edward Minchin Ralph D. Ellis +1 位作者 Jae-Ho Pyeon jichao zhan 《Journal of Civil Engineering and Architecture》 2010年第8期14-26,共13页
Alternative contracting techniques have been frequently used in highway construction in the United State and have played an important role in the effort to improve construction project performance. However, it is stil... Alternative contracting techniques have been frequently used in highway construction in the United State and have played an important role in the effort to improve construction project performance. However, it is still unknown whether which project factors have significant influence on project performance. It is essential to learn from the experiences and opinions of construction project managers who had executed innovative or alternative contracts in order to improve and refine the usage of alternative contracting methods. Innovative contracting methods have been used by state Departments of Transportation for many years, so there is now sufficient data to measure the effectiveness of these innovations. Working under a grant from the Florida Department of Transportation (FDOT), the research team used the experiences and opinions of construction field engineers who had executed innovative contracts on FDOT projects to measure the effectiveness of these systems. To that end, interviews were conducted with FDOT and consultant personnel from across Florida. All interviewed were project managers who had overseen at least one project using an innovative contracting method. Discussions brought enthusiastic responses from those interviewed, both for and against certain innovations. This paper will focus on the experiences and opinions of those experienced construction field engineers dealing with well-known innovations, as well as newer innovations such as "Detour Rental" and "Damage Recovery". 展开更多
关键词 Alternative contracting highway construction A+B incentive/disincentive DESIGN-BUILD CM-at-Risk.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部