期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Longitudinal Performance Assessment of Traffic Signal System Impacted by Long-Term Interstate Construction Diversion Using Connected Vehicle Data 被引量:6
1
作者 Enrique D. Saldivar-Carranza Margaret Hunter +2 位作者 Howell Li jijo mathew Darcy M. Bullock 《Journal of Transportation Technologies》 2021年第4期644-659,共16页
Local arterials can be significantly impacted by diversions from adjacent work zones. These diversions often occur on unofficial detour routes due to guidance received on personal navigation devices. Often, these rout... Local arterials can be significantly impacted by diversions from adjacent work zones. These diversions often occur on unofficial detour routes due to guidance received on personal navigation devices. Often, these routes do not have sufficien<span style="font-family:Verdana;">t sensing or communication equipment to obtain infrastructure-based tra</span><span style="font-family:Verdana;">ffic signal performance measures, so other data sources are required to identify locations being significantly affected by diversions. This paper examines the network impact caused by the start of an 18-month closure of the I-65/70 interchange (North Split), which usually serves approximately 214,000 vehicles per day in Indianapolis, IN. In anticipation of some proportion of the public diverting from official detour routes to local streets, a connected vehicle monitoring program was established to provide daily performances measures for over 100 intersections in the area without the need for vehicle sensing equipment. This study reports on 13 of the most impacted signals on an alternative arterial to identify locations and time of day where operations are most degraded, so that decision makers have quantitative information to make informed adjustments to the system. Individual vehicle movements at the studied locations are analyzed to estimate changes in volume, split failures, downstream blockage, arrivals on green, and travel times. Over 130,000 trajectories were analyzed in an 11-week period. Weekly afternoon peak period volumes increased by approximately 455%, split failures increased 3%, downstream blockage increased 10%, arrivals on green decreased 16%, and travel time increase 74%. The analysis performed in this paper will serve as a framework for any agency that wants to assess traffic signal performance at hundreds of locations with little or no existing sensing or communication infrastructure to prioritize tactical retiming and/or longer-term infrastructure investments.</span> 展开更多
关键词 Traffic Signal Performance Measures Connected Vehicle Longitudinal Study Big Data
下载PDF
Signalized Corridor Timing Plan Change Assessment Using Connected Vehicle Data 被引量:2
2
作者 Enrique Saldivar-Carranza Howell Li +2 位作者 jijo mathew Charles Fisher Darcy Michael Bullock 《Journal of Transportation Technologies》 2022年第3期310-322,共13页
Updates to traffic signal timing plans are expected to either improve operations or mitigate the effects of increased volumes. Longitudinal before-after studies are important when validating changes to traffic signal ... Updates to traffic signal timing plans are expected to either improve operations or mitigate the effects of increased volumes. Longitudinal before-after studies are important when validating changes to traffic signal systems, but they have historically required field data collection as well as deployment of extensive detection and communication equipment. These infrastructure-based techniques are costly and hard to scale. This study utilizes commercially available connected vehicle (CV) trajectory data to assess the change in performance between August 2020 and August 2021 on a 22-intersection corridor associated with the implementation of a semi-automated adaptive control system. Approximately 1 million trajectories and 13.5 million GPS points are analyzed for weekdays in August 2020 and August 2021. The vehicle trajectory data is used to compute corridor travel times and linear referenced relative to the far side of each intersection to generate Purdue Probe Diagrams (PPD). Using the PPDs, operational measurements such as arrivals on green (AOG), split failures (SF), and downstream blockage (DSB) are calculated. Additionally, traditional Highway Capacity Manual (HCM) level of service (LOS) is estimated. Even though there was a 35% increase in annual average daily traffic (AADT), the weighted average vehicle delay only increased by two seconds, LOS did not change, AOG improved by 1%, and SF and DSB remained the same. Based on the small changes in operational performance and considering the increase in traffic volume it is concluded that the implementation of the semi-automated adaptive control system had a significant positive impact in the corridor. The presented framework can be utilized by agencies to use CV data to perform before-after studies to evaluate the impact of signal timing plan changes. The presented methodology can be applied to any location where CV trajectory data is available. 展开更多
关键词 Adaptive Control Traffic Signals Connected Vehicle Trajectories Perfor-mance Measures Before-After
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部